Infrastructure, Ashford Village, Co. Limerick.
•Construction of new 1.5m to 1.8m wide footpaths through village. •Repair/Upgrade of existing footpaths through village. •Relocation of existing Pedestrian crossing to new location outside the Church to Ash Hall •Removal of 14m approx. of existing boundary wall at Ashford Pre-school, setting back and rebuilding of wall to...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Part 8
Application text
•Construction of new 1.5m to 1.8m wide footpaths through village. •Repair/Upgrade of existing footpaths through village. •Relocation of existing Pedestrian crossing to new location outside the Church to Ash Hall •Removal of 14m approx. of existing boundary wall at Ashford Pre-school, setting back and rebuilding of wall to facilitate construction of footpath. •Removal of 35m approx. of existing boundary wall at property beside The Village Inn, setting back and rebuilding of wall to facilitate construction of footpath. •Removal of 50m approx. of hedgerows north of village, construction of 1.2m high wall with 1.8m high piers with steel fence panels between piers for a 25m section. •1.2m high TII specification fencing for 25m section. •Installation of new drainage works. •Installation of speed ramps through village. •Installation of new tactile paving and drop kerbs. •Installation of new road markings. •Installation of appropriate Traffic signs. •Upgrade of existing public lighting
Application to site progress
-
Applied 1 Jul 2026 268417
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 268417
•Construction of new 1.5m to 1.8m wide footpaths through village. •Repair/Upgrade of existing footpaths through village. •Relocation of existing Pedestrian crossing to new location outside the Church to Ash Hall •Removal of 14m approx. of existing boundary wall at Ashford Pre-school, setting back and rebuilding of wall to facilitate construction of footpath. •Removal of 35m approx. of existing boundary wall at property beside The Village Inn, setting back and rebuilding of wall to facilitate construction of footpath. •Removal of 50m approx. of hedgerows north of village, construction of 1.2m high wall with 1.8m high piers with steel fence panels between piers for a 25m section. •1.2m high TII specification fencing for 25m section. •Installation of new drainage works. •Installation of speed ramps through village. •Installation of new tactile paving and drop kerbs. •Installation of new road markings. •Installation of appropriate Traffic signs. •Upgrade of existing public lighting