Large residential · Co. Louth
Site on lands in the Townland of Moneymore, Drogheda, County Louth
Granted 14 Feb 2025 (final grant issued 18 Mar 2025)
We no longer update this application, so we can't email you about it. Get new planning applications in Drogheda by email
Key facts
- Planning application 2460795 at Site on Lands In The Townland of Moneymore, Drogheda, County Louth: ~86 homes.
- The applicant is Ballymakenny Residential Properties Ltd.
- It was received by Louth County Council on 17 Dec 2024.
- Status: Granted 14 Feb 2025 (final grant issued 18 Mar 2025).
Source: the Louth County Council planning register, as last seen on 5 Oct 2026. Open the council's file
More planning applications in Drogheda · Planning applications in Co. Louth
Council register
The council's register shows: Granted on 14 Feb 2025.
Search the Louth planning register
Application details as we last saw them in the national register on 5 Oct 2026.
What and where
~86 homes
Permission for development at this site (c. 3.47ha) at lands in the Townland of Moneymore, Drogheda, County Louth. The proposed development comprises 86no. residential units in a mix of houses and duplex units; comprising of 78no. 2 storey houses (45no. 3-bedroom and 33no. 4-bedroom houses) including 1no. dwelling with an option to accommodate a childcare facility at ground floor level; 8no. 2-bedroom duplex units and all associated and ancillary site development and infrastructural works, hard and soft landscaping and boundary treatment works, including public open space; public lighting; 168no. surface car parking spaces; 42no. bicycle parking spaces/stores for mid-terrace and duplex units; ESB Substation; bin stores; connection to foul drainage pumping station permitted under LCC Reg. Ref. 2360492, LCC Reg. Ref. 2360493, & LCC Reg. Ref. 2360494; landscaping and configuration amendments to the road north of House Nos. 34-38 permitted under LCC Reg. Ref. 2360494; the proposed development is accessed from the combined vehicular, cyclist, and pedestrian access at Twenties Lane permitted under LCC Reg. Ref. 2360492, LCC Reg. Ref. 2360493, & LCC Reg. Ref. 2360494. The site is also accessible for pedestrians, cyclists and vehicles from Ballymakenny Road via Ballymakenny Avenue permitted under LCC Reg. Ref. 22215 and road infrastructure permitted under LCC Reg. Ref. 2460391. The proposed development ties in with road, utilities and surface water attenuation permitted under LCC Reg. Ref. 2460391. An EIAR and NIS accompany this application.
- Location
- Drogheda, Co. Louth Map
- Council
- Louth County Council
- Planning reference
- 2460795
Numbers and dates
- Homes
- ~86estimated from the application
- Estimated construction value
- €12m to €24mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Received
- 17 Dec 2024
- Decision to grant
- 14 Feb 2025
- Final grant
- 18 Mar 2025
- Site start notified
- 23 Jun 2025
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460795 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Energy and Climate Change Adaption Design Statement in the council's file.
- Unit mix
- 45 3-bedroom houses, 33 4-bedroom houses, 8 2-bedroom duplex units
- Applicant in the planning documents
- Ballymakenny Residential Properties Ltd
- Scope
- The proposed development consists of 86 residential units with associated site works, aiming to comply with Part L 2022 and incorporate renewable energy.
- Roofing
- “Target U-values for pitched roof W/m2K, flat roof W/m2K”
- Windows/doors
- “Target U-values for windows W/m2K”
- Heat pump
- “Option 2 - Air Source Heat Pumps considered as renewable source”
- Solar PV
- “Option 1 includes solar panels; PV panels at roof level to meet renewable requirement”
How we know this
From the Louth County Council planning register, as last seen on 5 Oct 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 23 Jun 2025Notice filed · The proposed development comprises 86no. residential units in a mix of houses and duplex...View the site start
- Completion certificate recordedRecorded in Jun 2025 · 15 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Jun 2025 · 25 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.