Planning application · Co. Louth

Marsh Road (to the east of Scotch Hall Shopping Centre), Drogheda, Co. Louth

Under appeal since 11 Sep 2026 (Granted 20 Aug 2026 by the council)

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560717 at Marsh Road (To The East of Scotch Hall Shopping Centre), Drogheda, Co. Louth: Six-storey hotel.
  • The applicant is Hallscotch Venture 2 Ltd. The agent is Ian Magahy.
  • It was received by Louth County Council on 12 Nov 2025.
  • Status: Under appeal since 11 Sep 2026 (Granted 20 Aug 2026 by the council).
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Louth County Council planning register, checked 16 Sep 2026. Open the council's file

More planning applications in Drogheda · Planning applications in Co. Louth

What and where

Six-storey hotel

Permission for a six-storey hotel comprising 107 no. bedrooms, lobby, bar and dining area, and associated service areas, together with all associated site development works, at Marsh Road (to the east of Scotch Hall Shopping Centre). The proposed development will include vehicular (servicing and drop-off) and pedestrian access via New Road (to the east of Scotch Hall Shopping Centre, off Marsh Road), provision of 54 reserved car parking spaces within the existing Scotch Hall Shopping Centre car park, 22 no. bicycle parking spaces, and an enclosed pedestrian bridge connection from Level 1 (first floor) of the proposed hotel to the eastern end of the Shopping Centre Mall at Level 1. A Natura Impact Statement (N.I.S.) accompanies this application. *Significant Further Information Received on 03/07/2026 - To include demolition works*

Location
Drogheda, Co. Louth Map
Planning reference
2560717
Applicant
Hallscotch Venture 2 Ltd
Council planning fileGet alerts

Numbers and dates

Received
12 Nov 2025
Council decision
20 Aug 2026
Appeal lodged
11 Sep 2026

Timeline

  1. Application received
  2. Granted by the council
  3. Appeal lodged

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

Reviewed build intelligence

What the documents establish

Government document review

Council decision dated 20 August 2026, incorporating 3 July further information. A final grant and any later appeal outcome have not been established. Existing parking, the shopping centre and wider utility-study scope remain distinct.

3 official documents inspected · Checked 2026-09-06 · Official file index

The hotel decision is not a final grant

Council decision recorded; final grant and completed works unverified · Louth 2560717; hotel and its interfaces with the existing shopping centre

What the evidence says
The 20 August 2026 council decision describes a six-storey, 107-bedroom hotel, 54 reserved spaces in the existing shopping-centre car park and a first-floor bridge connection. July significant further information adds demolition works. The notification explicitly says the development is not authorised until the grant is made.

Why it may matter — interpretation
Interpretation: keeps hotel rooms, existing reserved parking and the consent stage distinct.

What is not established
Any subsequent appeal, final grant and commencement are not established.

Inspect the evidence

Scotch Hall hotel: notification of decision · p.1
107 no. bedrooms · Issued 2026-08-20 · Seventeen conditions; incorporates 3 July significant further information; not a final grant · Checked 2026-09-06

107 no. bedrooms

Bridge acceptance carries detailed design conditions

Council decision recorded; final grant and completed works unverified · Hotel-to-shopping-centre pedestrian bridge, condition 8

What the evidence says
Condition 8 records a bridge floor depth of no more than 320 mm and 4.9 m clearance. Acceptance is conditional on further warning-signage details and structural-engineer assurance about collision resistance. These are the proposed bridge parameters and outstanding conditions, not verified built dimensions.

Why it may matter — interpretation
Interpretation: shows the precise structural interface without treating conditional acceptance as completion.

What is not established
Final structural design, collision assessment, agreed signage and as-built clearance are unverified.

Inspect the evidence

Scotch Hall hotel: notification of decision · p.4
no more than 320mm · Issued 2026-08-20 · Seventeen conditions; incorporates 3 July significant further information; not a final grant · Checked 2026-09-06

no more than 320mm

Scotch Hall hotel: notification of decision · p.5
collision impacts · Issued 2026-08-20 · Seventeen conditions; incorporates 3 July significant further information; not a final grant · Checked 2026-09-06

collision impacts

The July drawing proposes a 2 L/s controlled outfall

Council decision recorded; final grant and completed works unverified · July further-information drainage route; existing outfall is not a new pipe quantity

What the evidence says
Revision A routes retained surface water through an attenuation manhole and hydrobrake at 2 L/s, across the car park to the existing quay-wall outfall. The drawing labels that existing outfall 300 mm. The applicant’s assertion that discharge rights need no alteration is not treated as independent approval of those rights; final permissions and flood interfaces remain separate.

Why it may matter — interpretation
Interpretation: connects the proposed hotel drainage to its stated destination and separates design from permission.

What is not established
Final discharge consent, hydraulic verification, tank capacity and installed route are unverified.

Inspect the evidence

Scotch Hall hotel: proposed surface-water drainage · p.1
a hydrobrake limiting flow to 2l/s · Issued 2026-06-26 · SERV.02 Revision A; further-information response drawing received 3 July · Checked 2026-09-06

a hydrobrake limiting flow to 2l/s

The shared utility feasibility letter is not a connection agreement

Council decision recorded; final grant and completed works unverified · Shared feasibility correspondence versus this hotel application

What the evidence says
The July response includes Uisce Éireann correspondence saying the earlier mixed-use feasibility scope includes one hotel. It also includes separate residential and retail uses, which are not added to this hotel’s scope. August condition 5 still requires valid feasibility or design-acceptance evidence for the hotel before commencement.

Why it may matter — interpretation
Interpretation: avoids mistaking a wider service study for additional hotel development or a completed connection.

What is not established
The final hotel-specific design acceptance, connection agreement and installed services are unverified.

Inspect the evidence

Scotch Hall hotel: further-information response · p.4
included for this hotel · Issued 2026-07-02 · Received 3 July; includes applicant drainage assertions and separate utility correspondence · Checked 2026-09-06

included for this hotel

Scotch Hall hotel: notification of decision · p.4
Statement of Design Acceptance · Issued 2026-08-20 · Seventeen conditions; incorporates 3 July significant further information; not a final grant · Checked 2026-09-06

Statement of Design Acceptance

The junction still needs civil and electrical detail

Council decision recorded; final grant and completed works unverified · Condition 7; proposed junction serving the hotel

What the evidence says
Condition 7 requires refinement of the new signalised Marsh Road/New Street junction, including adjusted stop lines and detailed civil, mechanical-and-electrical and phasing drawings. This is a defined highway interface requiring agreement; the decision does not specify a signal-equipment supplier.

Why it may matter — interpretation
Interpretation: identifies the transport engineering package and its remaining approval step.

What is not established
Agreed junction drawings, signal products and completed works are unverified.

Inspect the evidence

Scotch Hall hotel: notification of decision · p.4
civil, M&E and phasing drawings · Issued 2026-08-20 · Seventeen conditions; incorporates 3 July significant further information; not a final grant · Checked 2026-09-06

civil, M&E and phasing drawings
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 3 government-published PDFs were visually inspected. 70 index rows retained; selected pages of three supporting PDFs visually inspected. This is not an exhaustive review of all architectural, traffic, ecological or later compliance material. Proposals do not establish procurement or installed work.

How we know this

From the Louth County Council planning register, checked 16 Sep 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Drogheda

Get alerts for DroghedaFree. We email you when new applications appear.

Free email alerts

Get new Drogheda projects by email

New applications, decisions and site starts in Drogheda, Co. Louth. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options