Major Project IntelligenceLinked commencement notices reviewed against the controlling planning scope.
Snugborough, Castlebar
Scope check: planning findings are not automatically phase-specific, and delivery status is not stated.
Supplier-relevant findings are limited to exact official PDF pages, sections and drawings. Planning and commencement evidence remain separate.
Scope check - read before pricing
Reviewed construction facts
Explicit details from official documents
The application form states a site area of 3.170 hectares.
Application-form site area for exact reference 2460782; no adjacent land is included.
Evidence excerpt: Area of site to which the application relates in hectares 3.170
The application form records 0.00 sq m of demolition.
Explicit zero-value application-form field; no broader claim about historic or enabling demolition is made.
Evidence excerpt: Gross floor space of any demolition in sq m (if appropriate) 0.00
Each row names its official document, PDF page, evidence text, extraction method and review state. No generic trade inference is published.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
Official commencement activity is present. It can signal site-stage demand, but it does not confirm an available package or procurement date.
1 official event; latest 28 Apr 2026. / Confidence: MediumThe reviewed evidence records decision-stage history, not a current open decision deadline.
1 event; latest 28 Apr 2026 / CN0141013MO / Thirty-four named units within a notice that calls the wider development 99 units.
High for recorded activity Open evidence1 direct drawing source in the reviewed evidence.
- Proposed Drainage Layout - PDF page 1; Drawing Proposed Drainage Layout; project 7212; sheet A1; drawing 4020A; scale 1:500; issued for planning 12.12.24
Confirmed scope
Permission and notice scope
The official permission records Amendment describes an 87-unit overall development replacing part of parent permission P21/921. Linked notices cover 34 stated units.
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Site infrastructure
The application form describes an amendment producing an overall 87-unit development, including 79 houses and 8 own-door apartments.
Attenuation and flow control
The surface-water design uses a vortex flow-control device, an attenuation pond, and a full-retention fuel/oil separator before discharge.
Foul drainage and connections
The drainage drawing specifies WavSpec SN8 Type A structured-wall foul pipe to EN 13476-2 with PVC-U layers, and JFC Corripipe SN6/SN8 twin-wall high-density polyethylene storm pipe.
Electrical infrastructure
Tree removal is conditioned on a qualified ecologist checking for bats; the plan also calls for bat boxes and bat-friendly lighting with specialist confirmation.
Watermain and utility works
The water design proposes a 100 mm internal-diameter HDPE connection, 100 mm branches and loops, hydrants, valves and metering, with a northern wayleave required for the connection.
Confidence & provenance 6 official sources
- Authority
- Mayo County Council
- Exact reference
- 2460782
- Evidence reviewed
- 30 Jul 2026
- Confidence
- Reviewed public evidence
Planning, appeal and commencement facts remain source-scoped. No request-time official fetch, tender, award or appointment inference is used.
Evidence-backed packages
Package signals with public-source support
Watermain and utility works
The water design proposes a 100 mm internal-diameter HDPE connection, 100 mm branches and loops, hydrants, valves and metering, with a northern wayleave required for the connection.
Site infrastructure
The application form describes an amendment producing an overall 87-unit development, including 79 houses and 8 own-door apartments.
Foul drainage and connections
The drainage drawing specifies WavSpec SN8 Type A structured-wall foul pipe to EN 13476-2 with PVC-U layers, and JFC Corripipe SN6/SN8 twin-wall high-density polyethylene storm pipe.
+2 further evidenced packages
PDF page 1; Project Site Landscaping Plan; drawing 241051-MA-XX-ZZ-DR-A-1108-P03; revision P03 dated 29/07/2025; scale 1:500 Application scope
PDF page 7; Printed page 4; Section 2.1 Surface Water Design; DOSA drawing 7212-0020 Application scope
Only packages with explicit public-source support are shown. No generic trade tags are added.
Project-scope facts
Context that frames the packages
Permission and notice scope
The official permission records Amendment describes an 87-unit overall development replacing part of parent permission P21/921. Linked notices cover 34 stated units.
Source-aware chronology
Four source groups kept separate
Planning application / amendment
Application, amendment, related and parent scopes remain distinct.
- 2460782Application receipt date recorded in the final-grant document.
- 2460782Final grant records Amendment describes an 87-unit overall development replacing part of parent permission P21/921.
Appeals
Only reviewed appeal evidence is shown in this lane.
- No appeal record is evidenced in the reviewed source set.Absence is rendered explicitly.
Official commencement notices
Notice evidence is separate from planning permission and physical progress.
- CN0141013MOThirty-four named units within a notice that calls the wider development 99 units.
Unreconciled source signal
Dashed context only; never promoted to official commencement evidence.
- No separate unreconciled source signal is published.Absence is rendered explicitly.
Evidence register
Accessible source rows
- Source title
- Application Form - Part A
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- PDF page 2; Section 9 Description of Proposed Development
- Checked date
- 2026-07-13
- Source title
- Infrastructure Report
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- PDF page 7; Printed page 4; Section 2.1 Surface Water Design; DOSA drawing 7212-0020
- Checked date
- 2026-07-13
- Source title
- Proposed Drainage Layout
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- PDF page 1; Drawing Proposed Drainage Layout; project 7212; sheet A1; drawing 4020A; scale 1:500; issued for planning 12.12.24
- Checked date
- 2026-07-13
- Source title
- Landscape Plans
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- PDF page 1; Project Site Landscaping Plan; drawing 241051-MA-XX-ZZ-DR-A-1108-P03; revision P03 dated 29/07/2025; scale 1:500
- Checked date
- 2026-07-13
- Source title
- Infrastructure Report
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- PDF page 15; Printed page 12; Section 4 Water Supply; drawing 7212-0030
- Checked date
- 2026-07-13
- Source title
- Final grant and linked commencement records
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- Final-grant scope and separately listed commencement chronology
- Checked date
- 30 Jul 2026
- Source title
- Application Form - Part A
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- PDF page 3
- Checked date
- 2026-07-30T19:40:09Z
- Extraction method
- Manual PDF table review
- Review state
- Reviewed
- Source title
- Application Form - Part A
- Authority
- Mayo County Council
- Reference
- 2460782
- Locator
- PDF page 3
- Checked date
- 2026-07-30T19:40:09Z
- Extraction method
- Manual PDF table review
- Review state
- Reviewed