Site start · Co. Meath
Stamullin, Meath
Granted 21 Feb 2024 (final grant issued 26 Mar 2024)
Key facts
- Site start record 231054 at Stamullin, Meath: Amendments to planning permission Reg. Ref. 22/627 for an enhanced…
- The planning authority is Meath County Council.
- Status: Granted 21 Feb 2024 (final grant issued 26 Mar 2024).
Source: the Meath County Council planning register, as last seen on 12 Jul 2026. Open the council's file
More planning applications in Stamullen · Planning applications in Co. Meath
Council register
The council's register shows: Granted on 21 Feb 2024.
Search the Meath planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Amendments to planning permission Reg. Ref. 22/627 for an enhanced…
amendments to planning permission Reg. Ref. 22/627 for an enhanced residential care facility and associated buildings and works across the site within the curtilage of Protected Structure Gormanstown College (RPS MH028-104). The proposed amendments comprise the inclusion of a Reception Centre (Building N) (76.8 m²), and Security/Maintenance Office (Building P) (40.2 m²), relocation and enlargement of Service Yard to the rear of Building A, provision of canopy structure to the rear of the Building A, relocation and increase in size of approved Building H (increased by 20 m²), removal of previously permitted Maintenance Shed (Building G), increase in size of approved Security Hut (building J) (increased by 5 m²), and renovation of existing potting shed (Building Q) (36 m²) to provide maintenance staff facilities, relocation and rotation of prayer building (Building M), 2 no. new security airlocks, amendments to elevations of previously approved blocks, enhanced recreational facilities, new security/safety fencing and amendments to approved fencing and bollards, removal of approx. 40m of previously permitted pedestrian footpath along Flemington Road (retaining remaining length of previously granted footpath) and removal of pedestrian access gate, and replacement with a new vehicular and pedestrian access, whilst making permanent use and upgrade of current construction access road including a new pedestrian foothpath, and new vehicular and pedestrian access gateways to the Maintenance Yard, Care Facility and Cemetery, and all associated site works
- Location
- Stamullen, Co. Meath Map
- Council
- Meath County Council
- Planning reference
- 231054
- Application type
- Commencement Notice
Numbers and dates
- Floor area
- 178 m²
- Project type
- Protected structure
- Received
- 13 Nov 2023
- Decision to grant
- 21 Feb 2024
- Final grant
- 26 Mar 2024
- Site start notified
- 12 Apr 2024
- Protected structure
- Yes
Site history
This site's history
-
Earlier permission 22/627 for this site: granted 6 Jul 2022, commencement notice filed.
amendments to planning permission 21/554 for an enhanced residential care facility and associated buildings and works across the site… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Documents and evidence
Check the record
- Council planning fileThe application file 231054 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Meath County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 12 Apr 2024Notice filed · phase 1 · Renovation of existing potting shed, Block Q, to provide maintenance staff facilities...View the site start
- 12 Apr 2024Notice filed · phase 2 · Construction of single storey Building to be used as a reception Centre, Block N, at...View the site start
- 12 Apr 2024Notice filed · phase 3 · Construction of single storey building to be used as a Maintenance and Security Office...View the site start
- 24 May 2024Notice filed · phase 4 · Construction of single storey Maintenance Shed, Block H, with adjoining covered washdown...View the site start
- 22 Jul 2024Notice filed · phase 5 · Construction of a new single storey building. Building M for use as a prayer and Faith...View the site start
- Completion certificate recordedRecorded in Apr 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Apr 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Apr 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area