Site start · Co. Meath
Kells, Meath
Site start 24 Jul 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
Search the Meath planning registerCurrent planning applications in Kells
What and where
Protected structure ref RPS 90488
A protected structure ref RPS 90488. The development consists of the following: Retention Permission consists of essential repair and conservation works to include, Stonework repairs and pointing, Replacement of casement windows with sash windows, Removal of steel bars from cell windows for repair and reinstallation, Return a historical opening in the rear elevation from a window to a door, Roof and valley repairs, Fire safety works, Internal floor finishes upgrades, Upgrading of the electrical and alarm systems, Repairs to drainage, Removal of modern tarmacadam hardstanding to side and rear, Repairs to lime mortar finished walls internally, Removal of ad-hoc mid-20th century partitions and make good of existing finishes. Planning Permission is sought to fit an openable sash in the Diocletian window to the front and erect a partition in the kitchen.
- Location
- Kells, Co. Meath Map
- Council
- Meath County Council
- Planning reference
- 2360347
Key facts
- Homes
- 1
- Floor area
- 1 m²
- Project type
- Protected structure
- Site start
- 24 Jul 2024
- Protected structure
- Yes, RPS 90488
Documents and evidence
Check the record
- Council planning fileThe application file 2360347 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Meath County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 24 Jul 2024Work started · Essential repair and conservation works, Fire safety works and a partition in the kitchen
- Completion certificate recordedRecorded in Jul 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Sep 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.