Planning ref 2660001 has a 14 May 2026 conditional local-authority decision, but ACP 324353 is pending in the supplied appeal extract. The 356-unit scope must not be presented as a final unappealed grant.

Blocking Caution

Partial Remainder Scope

This is a partially commenced reviewed-scheme record. The remaining-unit figure is a PlanningBrief reconciliation state and must not be presented as a live contract, tender or award.

Blocking Caution

Parent Amendment Chain

The scheme includes parent, amendment and compound-reference links. Planning, appeal and commencement signals must stay in separate source-aware tracks.

Blocking Caution

No Tender Or Appointment

No tender, award, contractor appointment or supplier appointment evidence is included in this pack.

Headline packages 2
Documents checked 4
Primary ref scheme_faf1cc42928055abe76dd7559746badd
Evidence review 12 Jul 2026

Source-linked planning record

Bennetstown, Meath

Bennetstown, Meath
PB ref
PB-12007382491
Plan ref
scheme_faf1cc42928055abe76dd7559746badd
Authority
Meath County Council
Stage
Partially Commenced; 356 permitted, 14 commenced, 342 remaining.
Value basis
PlanningBrief indicative estimate: EUR 10m-30m (not official planning, appeal or BCMS evidence).

Source: https://www.eplanning.ie/MeathCC/AppFileRefDetails/2660001/0

Key facts

Lead summary

Planning authority
Meath County Council
Primary reference
scheme_faf1cc42928055abe76dd7559746badd
Evidence state
Partially Commenced; 356 permitted, 14 commenced, 342 remaining.
Headline packages
2
Documents analysed
4
Value basis
PlanningBrief indicative estimate: EUR 10m-30m (not official planning, appeal or BCMS evidence).

Supplier brief

Download the reviewed package brief

This PDF is generated from the same reviewed enrichment contract as this page. It keeps package scope warnings, official HTTPS links and generation date together.

Download supplier brief

Headline packages

Evidence-backed package signals

Application High

Roads, junctions, bridge and active-travel access

The 2660001 planning description explicitly lists R157 road modifications, a new signalised junction, a link road including a bridge over the River Tolka, footpaths, cycle lanes and pedestrian crossings.

Ref
planning ref 2660001
Evidence
Explicit
Confidence
High

Official-source package signal only; procurement status is not inferred.

Application High

Utilities, sewerage, drainage and flood-mitigation works

The 2660001 planning description explicitly lists foul pumping stations, sewer connection, watermain connection, ESB substations/kiosks, swales, filter drains, drainage and public lighting.

Ref
planning ref 2660001
Evidence
Explicit
Confidence
High

Official-source package signal only; procurement status is not inferred.

Only packages with explicit public-source support are shown. This page has 2 headline package cards.

Project-scope facts

Context, not live trade packages

Project-scope fact planning ref 2660001

Residential blocks and creche planning scope

The planning description lists 356 residential units, maisonette/apartment/duplex blocks and a two-storey creche. This is application-scope context only; commencement notices tied to other references are not used as proof of commencement under ref 2660001.

Ref
planning ref 2660001
Confidence
High

Project-scope context only; not a tender, award, contractor appointment or supplier appointment.

Project-scope fact

Scope note 1

PlanningBrief public row remains 342 remaining units from a 356 permitted / 14 commenced reconciliation.

Confidence
Reviewed

Source-aware context only; not a headline package.

Project-scope fact

Scope note 2

Linked commencement notices use separate or compound planning references; they do not prove commencement under planning ref 2660001.

Confidence
Reviewed

Source-aware context only; not a headline package.

Project-scope fact

Scope note 3

Some linked notices omit unit counts, so phase evidence remains source-aware and is kept out of headline package cards unless directly tied to the selected scope.

Confidence
Reviewed

Source-aware context only; not a headline package.

Source-aware chronology

Separate planning and commencement tracks

Selected planning scope

Source-aware chronology track

  1. 14 May 2026 Planning ref 2660001 conditional local-authority decision 356 residential units selected by reconciliation; ACP 324353 remains pending
  2. 28 Sep 2026 ACP 324353 pending appeal due date Official case is due to be decided by 28 September 2026 in the supplied extract
  3. 20 Nov 2024 ACP 320049 granted with revised conditions Linked to planning ref 2360290
  4. 4 Jun 2024 Planning ref 2360290 conditional decision 267-unit parent/linked planning record

Commencement evidence

Source-aware chronology track

  1. 16 Dec 2024 ABP320049-24 BCMS notices Apartment block commencement notices
  2. 2 Jan 2026 24/60805 BCMS notices Residential block and dwelling phase notices
  3. 3 Jun 2026 CN0142975MH 14-unit residential block commencement notice

Unknowns and cautions

Claims intentionally excluded

  • No tender, award, contractor appointment, supplier appointment or procurement timetable is evidenced.
  • Planning, appeal and commencement signals remain in separate source-aware tracks.
  • Remaining units are a PlanningBrief reconciliation state, not a live contract package.