Tullamore, Offaly

Site start 27 Dec 2024

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 10 Jun 2026. The details below are as they were then. The council's register has the current status.

What and where

~126 homes

A Large Scale Residential Development (LRD). The proposed development consists of 126 no. residential units comprised of 102 no. dwelling houses and 24 no. apartments and a childcare facility/creche. The houses are arranged as 7 no. two-story, detached houses (5 no. 3-bedroom, and 2 no. 4-bedroom), 50 no. two-storey, semi-detached houses (2 no., 4-bedroom, 44 no. 3-bedroom and 4 no. 2-bedroom), 21 no. two-storey terraced houses (in 7 terraces each with 3 no. 2-bedroom houses) and 24 no. three-story (third floor in roof/dormer space), semi-detached houses (containing 4 bedrooms). The apartments are arranged as two-story (and part single-story) units with own-door access with 2 no. units, each containing 4 no. 2-bedroom apartments (2 no. 2-bed at ground floor level and 2 no. 2-bed at first floor level) and 2 no. terraced apartment units each containing 8 no. apartments (4 no., 2-bed at ground floor level and 4 no., 1-bed at first floor level). Bin/recycling stores and bicycle shelters are proposed for the apartments. The development also includes a single-story, childcare facility/creche containing pre-school and after-school facilities with associated, on-site parking, bicycle shelter, bins/recycling stores and amenity/play areas.Proposed vehicular access is proposed to be provided off the existing roundabouts (on the north-south link road between Collins Lane (R443) and the Educate Together School), one by the continuation of the existing road serving the Jehovah Witness Hall site, one by a new roadway from the central roundabout (through the neighbourhood centre zoned site). A new vehicular entrance serving the development is also proposed off the R443, Collins Lane. An internal link road is proposed to The Hawthorns housing estate to the north of the site. Works include all new estate roads, boundary treatments, public open space serving the development including amenity/play areas, landscaping, pedestrian, cycle facilities and landscaping along the R443. Works include waste and surface water services, the under-grounding of overhead power lines and ground-mounted transformers, related and ancillary services and all associated site-works. The application may also be viewed on-line on a website set up by the applicants at www.collinslanehousinglrd.com

Location
Tullamore, Co. Offaly Map
Planning reference
2360059
Agent
Collins Lane Housing Development Ltd

Key facts

Homes
~126estimated from the application
Floor area
11,132 m²
Project type
Large residential
Site start
27 Dec 2024

Documents and evidence

Check the record

  • Council planning fileThe application file 2360059 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Statement of Consistency with Development Plan Report in the council's file.
    Site area
    4.7 ha
    Applicant
    Collins Lane Housing Development Ltd.
    Scope
    The proposed development consists of in excess of 100 residential dwellings and a crèche/after school facility on lands zoned New Residential and Neighbourhood Centre in Tullamore.
    Roofing
    “ROOF SLATES ON TREATED BATTENS ON ROOFING FELT/TYVEK ON PREFABRICATED/CUT ROOF TRUSSES AT 400CS”
    Cladding
    “NEUTRAL COLOUR RENDER WALL FINISH; SELECTED BRICK TO BAY AT SIDE OF HOUSE”
    Windows/doors
    “RAL GREY TRIPLE/DOUBLE GLAZED ALUMINIUM WINDOWS; OPAQUE GLASS TO FIRST FLOOR SIDE WINDOWS”

How we know this

From the Offaly County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Site starts

Site starts and completion

  1. 27 Dec 2024Work started · Construction of new Apartment Blocks A, B, & C and all associated Siteworks
  2. Completion certificate recordedRecorded in Dec 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Sep 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Tullamore

Get alerts for TullamoreFree. We email you when new applications appear.

Free email alerts

Get new Tullamore projects by email

New planning applications, decisions and site starts in Tullamore, Co. Offaly. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options