~3 dwellings, Townland of Clara, near Clara, Co. Offaly
the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 27 Jan 2025. / Confidence: LowDecision date 27 Jan 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Offaly County Council
- Exact reference
- 2460338
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Temporary/event - 3 dwellings
The public application record identifies 3 dwellings in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Offaly planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter Fencing; • CCTV; • Site access provided from existing site access off Curragh Road (L20171), internal tracks, site landscaping and all associated site enabling and site development works. This planning application is accompanied by a Natura Impact Statement (NIS).
Application to site progress
-
Applied 3 Sep 2024 2460338
-
Decision Conditional 27 Jan 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2460338
the development and operation of a c. 14MW solar photovoltaic (PV) farm at this 29.75ha site located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly. The application seeks a 10-year permission with an operational lifetime of 35 years. The development will consist of: • Approximately 38,000 panels on ground mounted metal frames, with a maximum height above ground of 3.17 metres, including string inverters mounted to the rear of the panels; • 1 no. 38kV substation including 1 no. MV switch room, IPP control room, 1 no. ESB switch room, and associated electrical infrastructure; • 3 no. transformer units; • Underground cabling and ducting; • 1 no. temporary construction compound and ancillary facilities for the duration of the construction phase of the project; • Perimeter Fencing; • CCTV; • Site access provided from existing site access off Curragh Road (L20171), internal tracks, site landscaping and all associated site enabling and site development works. This planning application is accompanied by a Natura Impact Statement (NIS).
Open official record