2 dwellings, 12 River Street, Clara, Co. Offaly
the construction of a second-storey extension (20.46 sq m) to the rear of the existing dwelling, internal and external alterations and all associated site works which is a protected structure RPS no. 12-82. Retention for the as built rear-extension (21.05sq m) as well as the steel stove flue which replaced the dilapidated...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 3 Jul 2026. / Confidence: LowDecision date 3 Jul 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the construction of a second-storey extension (20.46 sq m) to the rear of the existing dwelling, internal and external alterations and all associated site works which is a protected structure RPS no. 12-82. Retention for the as built rear-extension (21.05sq m) as well as the steel stove flue which replaced the dilapidated gable chimney on the side elevation of the existing dwelling
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Offaly County Council
- Exact reference
- 2560638
- Evidence reviewed
- 5 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure - 2 dwellings
The public application record identifies 2 dwellings in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Sean Devine
- Planning agent
- Ekaterina Glavatkaia
- Agent address
- John Madden and Associates Blackhall St. Mullingar, Co. Westmeath N91 V32W
More Offaly planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the construction of a second-storey extension (20.46 sq m) to the rear of the existing dwelling, internal and external alterations and all associated site works which is a protected structure RPS no. 12-82. Retention for the as built rear-extension (21.05sq m) as well as the steel stove flue which replaced the dilapidated gable chimney on the side elevation of the existing dwelling
Application to site progress
-
Applied 12 Dec 2025 2560638
-
Decision Conditional 3 Jul 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2560638
the construction of a second-storey extension (20.46 sq m) to the rear of the existing dwelling, internal and external alterations and all associated site works which is a protected structure RPS no. 12-82. Retention for the as built rear-extension (21.05sq m) as well as the steel stove flue which replaced the dilapidated gable chimney on the side elevation of the existing dwelling
Open official record