Protected structure · Co. Tipperary
The Square and Barrack Street, Fethard, Co. Tipperary
Granted 4 Jan 2021 (final grant issued 7 Feb 2021)
We no longer update this application, so we can't email you about it. Get new planning applications in Fethard by email
Key facts
- Planning application 20275 at The Square and Barrack Street, Fethard, Co. Tipperary: 2 homes.
- It was received by Tipperary County Council on 16 Mar 2020.
- Status: Granted 4 Jan 2021 (final grant issued 7 Feb 2021).
Source: the Tipperary County Council planning register, as last seen on 2 Jun 2026. Open the council's file
More planning applications in Fethard · Planning applications in Co. Tipperary
Council register
The council's register shows: Granted on 4 Jan 2021.
Search the Tipperary planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
2 homes
a) alterations and extension to existing three storey building, which currently contains first and second floor living accommodation over ground floor retail unit. The works will consist of the change of use of the building to offices with elevational and internal layout alterations, construction of single and three storey extensions to side and rear, with demolition of existing rear single storey extension, b) demolition of existing garden shed, c) alteration to existing vehicular entrance and reconstruction of stone boundary wall to Barrack Street, d) hard surfacing for car parking, paths, and patios, e) construction of fenced enclosures for services and bin store e) re-grading of footpath locally along the building frontage on The Square, f) construction of 2 no. two-storey semi-detached dwellings on the site with frontage to Barrack Street, g) all associated site development works including on-site construction of drains and services, and connection to public drains and services, and construction of dividing walls and fence within the site. The application site forms part of Recorded Protected Structure reference number S645 Fethard Town Walls
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Fethard, Co. Tipperary Map
- Council
- Tipperary County Council
- Planning reference
- 20275
Numbers and dates
- Homes
- 2
- Floor area
- 188 m²
- Estimated construction value
- €280k to €360kOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Protected structure
- Received
- 16 Mar 2020
- Decision to grant
- 4 Jan 2021
- Final grant
- 7 Feb 2021
- Site start notified
- 16 Aug 2021
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 20275 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Tipperary County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 16 Aug 2021Notice filed · Office Building & Townhouses development at The Square and Barrack Street, Fethard, Co...View the site start
- Completion certificate recordedRecorded in Aug 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Aug 2021 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.