Commercial new build, Roscrea, Tipperary - Planning Application 2360848
portal frame building for the storage, cleaning, reconditioning and recycling of IBC's and drums, storage yards, water collection and recycling tanks...
portal frame building for the storage, cleaning, reconditioning and recycling of IBC's and drums, storage yards, water collection and recycling tanks, site fencing, landscaping, solar panels, office and welfare facilities, parking and all associated site works - this application consists of a development for an activity for which a Waste Licence is required from the Environmental Protection Agency
Commercial new buildEnergyFire / FSC likelyGoing to sitesource=commencement
Map
No coordinates supplied in the public planning feed.
the construction of an MV electrical building. The development will consist of: i) a new MV electrical building to comprise electrical rooms over an under-croft level to provide a gross floor area of approximately 168.8 square meters and a maximum height of...
1. a new car showroom with part mezzanine for ancillary offices and a workshop repair area with ancillary rooms (total area 1500 sq m). 2. a new single storey valeting/repairs building to the rear of proposed showroom/workshop (total area 325 sq m). 3. a ne...
the development of a new purified water utility (PuW) building. The development will consist of: i) a new purified water utility (PuW) building with two no. levels, to provide a gross floor area of approximately 281 square meters and a maximum height of 15....
the construction of a new single-storey warehouse incorporating 2 no. dock levellers with canopy over, underground storm attenuation system and all associated site works