Development Description
1) the empty wheelie bin storage area and permission for construction of new canopy to enclose same, 2) the current layout and uses of the storage area for open recyclables bins, empty skips, and empty trailers, 3) the flood lighting and CCTV cameras to the east, west, and north facades of the existing buildings, 4) the current operational processes used at the facility building from those previously authorised, 5) the as-built odour control unit and permission for a revised stack height of 14 m, 6) the as-installed weighbridge container office, 7) the as-built site access, 8) the as-built facility yard, 9) the relocated as-built wash-down area, 10) the as-built lower area to the west of site (including attenuation tank, screening mounds, and existing ground levels & profiles). Planning Permission for the amendment to Condition 13 of current planning permission, and all associated and ancillary works