Large residential · Co. Tipperary
Rosemount Farm Road, Barnora Cahir, Co. Tipperary
Granted 7 Aug 2025 (final grant issued 10 Sep 2025)
Key facts
- Planning application 2460828 at Rosemount Farm Road, Barnora Cahir, Co. Tipperary: 24 homes.
- The applicant is Cooney Contractors Engineering Ltd.
- It was received by Tipperary County Council on 27 Sep 2024.
- Status: Granted 7 Aug 2025 (final grant issued 10 Sep 2025).
- Work started on site on 25 Feb 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Tipperary County Council planning register, checked 2 Jun 2026. Open the council's file
More planning applications in Barnora Cahir · Planning applications in Co. Tipperary
Since you last looked
Worked out in this browser from the record's own dates.
What and where
24 homes
the construction of 24 No. 2 bed semi-detached bungalows designed for the elderly, the proposed development will also include new internal roadways and footpaths, proposed new pedestrian and new vehicular access from the existing Rosemount Farm Road to the south of the site, new boundary treatments, landscaping, foul and surface water drainage including associated attenuation together with all ancillary and associated site works
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Barnora Cahir, Co. Tipperary Map
- Council
- Tipperary County Council
- Planning reference
- 2460828
- Applicant
- Cooney Contractors Engineering Ltd
Numbers and dates
- Homes
- 24
- Floor area
- 1,980 m²per planning documents
- Project type
- Large residential
- Received
- 27 Sep 2024
- Decision to grant
- 7 Aug 2025
- Final grant
- 10 Sep 2025
- Site start
- 25 Feb 2026
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460828 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Application Form - Part A in the council's file.
- Unit mix
- 24 2 Bed
- Floor area
- 1,980 m² (per planning documents)
- Site area
- 0.96 ha
- Applicant
- Cooney Contractors Engineering Ltd
- Phasing
- Single phase
- Scope
- Construction of 24 two-bed semidetached bungalows for the elderly with new roads, footpaths, access, landscaping, and drainage.
- Groundworks
- “new internal roadways and footpaths”
- Rainwater
- “surface water drainage including attenuation”
- Wastewater
- “foul water drainage”
How we know this
From the Tipperary County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 25 Feb 2026Work started · Construction of 24 no. two-bedroom semi-detached bungalows designed for elderly...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.