Protected structure, Anner Castle, Ballinamore Clonmel, Co. Tipperary
the removal of the existing timber staircase in the North Tower and the construction of a new hardwood octagonal staircase serving both the first floor and a new upper level (previously granted under planning reference no. 2361015). All with the associated site development works. A protected structure NIAH – 22207713/recorded...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 12 Feb 2025. / Confidence: LowDecision date 12 Feb 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
the removal of the existing timber staircase in the North Tower and the construction of a new hardwood octagonal staircase serving both the first floor and a new upper level (previously granted under planning reference no. 2361015). All with the associated site development works. A protected structure NIAH – 22207713/recorded monument (no: TS077-089)
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Tipperary County Council
- Exact reference
- 2461091
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Tipperary planning activity
These are county discovery links, not claimed relationships to this application.
Application text
the removal of the existing timber staircase in the North Tower and the construction of a new hardwood octagonal staircase serving both the first floor and a new upper level (previously granted under planning reference no. 2361015). All with the associated site development works. A protected structure NIAH – 22207713/recorded monument (no: TS077-089)
Application to site progress
-
Applied 12 Dec 2024 2461091
-
Decision Conditional 12 Feb 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2461091
the removal of the existing timber staircase in the North Tower and the construction of a new hardwood octagonal staircase serving both the first floor and a new upper level (previously granted under planning reference no. 2361015). All with the associated site development works. A protected structure NIAH – 22207713/recorded monument (no: TS077-089)
Open official record