  • Planning application 2560019 at Killough Quarry, Gaile Townland, Holycross Co. Tipperary: An overall planning application site area of c.
  • It was received by Tipperary County Council on 13 Jan 2025.
  • Status: Under appeal since 5 Mar 2026 (Refused 6 Feb 2026 by the council).
  • The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

Source: the Tipperary County Council planning register, checked 2 Jun 2026. Open the council's file

Planning applications in Co. Tipperary

What and where

1. An overall planning application site area of c

1. An overall planning application site area of c. 6.3 hectares consisting of a proposed bio-renewables production facility, buffer screening, ancillary facilities and site access via the existing permitted quarry entrance. 2. The proposed bio-renewables production facility (incorporating anaerobic digestion) compound will cover an area of c. 4 hectares. The production facility will convert feedstocks to end of line co-products, namely bio-methane (gas), compressed bio-methane (bio-CNG), carbon dioxide (CO2), electricity (green), organic fertilisers (pelleted) and water, with integrated solar energy generation. The adjacent Roadstone Killough Quarry plant will utilise the electricity, bio-methane and water. Pelletised fertiliser will be available for supply to local agriculture and traders off-site. CNG and CO2 will be pressurised and stored for ongoing draw-off by tankers to points of re-use off-site. Demolition of existing quarry store building (c. 158m²) to facilitate the proposed development. 3. The facility will consist of the following elements to be constructed: a) two-storey administration building with (gross floor area 664m² and 8.15m in height) to accommodate reception and storage areas, canteen, laboratory, first aid room, control room/electrical switch room, storage room, toilets, offices, conference room, training room and kitchenette, and roof solar panels 315m²; b) dry matter reception building (gross floor area 5,215m² and 12.7m in height) with roof solar panels 4,000m²; c) workshop building (gross floor area 122.1m² and 8.9m in height) to accommodate workshop and internal gantry crane, store and office at ground level and office at mezzanine level; d) bio-conversion building (gross floor area 3,257m² and 12.5m in height) with roof solar panels 2,400m²; e) pre-treatment, equalisation and gas upgrading building (gross floor area 5,685m² and 12m in height) to accommodate pre-treatment & equalisation area (3,527m²), utilities area (376m²), heat recovery plant area (361m²), water treatment recovery area (316m²), and gas upgrading facility (1,105m²) with roof solar panels 3,850m²; f) digestate handling building (gross floor area 692m² and 8.6m in height) to accommodate palletiser station/packing station area (150m²), solid dryer/vacuum evaporator area (392m²) and nutrient adjustment facility (150m²); g) warehouse storage building (gross floor area 158m² and 11.2m in height); h) bio-filling station building (gross floor area 300m² and 9.75m in h

Location
Gaile Townland, Co. Tipperary Map
Planning reference
2560019
Council planning fileGet alerts

Numbers and dates

Floor area
22,493 m²
Received
13 Jan 2025
Council decision
6 Feb 2026
Appeal lodged
5 Mar 2026

Timeline

  1. Application received
  2. Refused by the council
  3. Appeal lodged

Outlook

What happens next

The council's decision was appealed to An Coimisiún Pleanála. The appeal decides the outcome, and building work cannot start before it.

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Tipperary County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Gaile Townland

Get alerts for Co. TipperaryFree. We email you when new applications appear.

Free email alerts

Get new Tipperary projects by email

New applications, decisions and site starts in Co. Tipperary. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options