Save this project to account

Protected structure · Co. Tipperary

Silver View, Nenagh, Co. Tipperary

Granted 11 Feb 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 11 Jun 2026. The details below are as they were then. The council's register has the current status.

What and where

~31 homes

construction of 31 no. residential units comprising of 15 no. 2-bed houses and 12 no. 3-bed houses in 6 no. two-storey terraced buildings and 4 no. 1-bed units in a two-storey building, new vehicular and pedestrian entrance, together with all roads, footpaths, underground services, connection to public services, surface water attenuation, car-parking, public open space, public lighting and associated site boundary and site development works, the site is located adjacent to Protected Structure TRPS2350 (Tipperary County Development Plan 2022-2028)

Location
Nenagh, Co. Tipperary Map
Planning reference
2560234
Applicant
Baile Ard Developments Ltd

Key facts

Homes
~31estimated from the application
Floor area
986 m²per planning documents
Project type
Protected structure
Received
24 Mar 2025
Granted
11 Feb 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 11 Feb 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • GroundworksNamed in the planning documents
  • LandscapingNamed in the planning documents
  • RainwaterNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2560234 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Application Form - Part A in the council's file.
    Unit mix
    4 1-bed, 15 2-bed, 12 3-bed
    Floor area
    986 m² (per planning documents)
    Site area
    0.882 ha
    Applicant
    Baile Ard Developments Ltd.
    Scope
    Construction of 31 residential units with associated roads, services, parking, open space, and site development works.
    Groundworks
    “roads, footpaths, underground services, surface water attenuation”
    Landscaping
    “public open space, site boundary and site development works”
    Rainwater
    “surface water attenuation, soakpit for surface water disposal”
    Wastewater
    “new connection to public sewer”

How we know this

From the Tipperary County Council planning register, as last seen on 11 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Nenagh

Get alerts for NenaghFree. We email you when new applications appear.

Free email alerts

Get new Nenagh projects by email

New planning applications, decisions and site starts in Nenagh, Co. Tipperary. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options