Large residential · Co. Tipperary

Crann Ard and Glencarra Estates, Ardgeeha Upper Clonmel, Co. Tipperary

Granted 6 Jul 2026

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2561350 at Crann Ard and Glencarra Estates, Ardgeeha Upper Clonmel, Co. Tipperary: 35 homes.
  • The applicant is Bluemont Developments (Clonmel) Ltd. The agent is Donal Duffy.
  • It was received by Tipperary County Council on 22 Dec 2025.
  • Status: Granted 6 Jul 2026.
  • Permission was granted on 6 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Source: the Tipperary County Council planning register, checked 23 Jul 2026. Open the council's file

Planning applications in Co. Tipperary

What and where

35 homes

(1) the construction of 35 no. houses, comprising 24 no. 3-bedroom, two-storey, semi-detached units; 9 no. 3-bedroom, two-storey, terraced units; and 2 no. 3-bedroom, single-storey, detached units with a total of 75 no. car parking spaces. (2) Landscaping, public open space and boundary treatment; (3) All ancillary site development works, including the provision of foul water, surface water and potable water services on site; bicycle parking, roads and footpaths; ESB Substation; and public lighting. (4) Vehicular access will be via Glencarra Grove with pedestrian and cycle access via Glencarra Grove, Crann Ard, and Ardgeeha Upper

Location
Ardgeeha Upper Clonmel, Co. Tipperary Map
Planning reference
2561350

Numbers and dates

Homes
35
Floor area
3,612 m²per planning documents
Project type
Large residential
Received
22 Dec 2025
Granted
6 Jul 2026

Timeline

  1. Application received
  2. Granted

Outlook

What happens next

Permission was granted on 6 Jul 2026 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • GroundworksNamed in the planning documents
  • LandscapingNamed in the planning documents
  • RainwaterNamed in the planning documents
  • WastewaterNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2561350 on eplanning.ie: drawings, reports and the decision.Open the council's file
  • From the planning documentsRead from Architectural Design Statement in the council's file.
    Unit mix
    35 3-bed house
    Floor area
    3,612 m² (per planning documents)
    Site area
    1.4 ha
    Applicant
    Bluemont Developments (Clonmel) Ltd.
    Phasing
    Single phase
    Scope
    Construction of 35 houses with landscaping, services, and access roads on vacant lands within Crann Ard estate.
    Groundworks
    “All ancillary site development works including roads and footpaths”
    Landscaping
    “Landscaping, public open space and boundary treatment”
    Rainwater
    “Surface water services on site”
    Wastewater
    “Foul water services on site”

Reviewed build intelligence

What the documents establish

Government document review

Final permission issued 9 August 2026 for 35 dwellings. The June FI layouts and July conditions distinguish existing sewer infrastructure from required pump-station remediation and occupation-stage drainage and landscaping work.

4 official documents inspected · Checked 2026-09-07 · Official file index

Final grant covers 35 homes and defined estate connections

Final permission under this application; no commencement established

What the evidence says
The final grant dated 9 August covers 35 dwellings: 24 semi-detached, nine terraced and two single-storey detached houses. It describes 75 parking spaces, vehicular access from Glencarra Grove and pedestrian/cycle connections to Glencarra Grove, Crann Ard and Ardgeeha Upper. The April revision B site layout also schedules 35 homes.

Why it may matter — interpretation
Housing and enabling-work teams can identify the permitted estate scope while keeping start dates and delivery commitments separate.

What is not established
Commencement, contractor appointment, compliance acceptance and construction progress are not established.

Inspect the evidence

Final grant of permission · p.1
Final grant 9 August: 35 dwellings, 75 spaces and estate connections · Issued 2026-08-09 · Final grant 9 August following decision 6 July · Checked 2026-09-07

Final grant 9 August: 35 dwellings, 75 spaces and estate connections

Revised site layout · p.1
1573-PA-003 revision B: 35-home site layout · Issued 2026-04-23 · 1573-PA-003 revision B, 23 April; received 9 June · Checked 2026-09-07

1573-PA-003 revision B: 35-home site layout

Existing pump-station remediation must precede works

Conditioned work to existing foul-water infrastructure

What the evidence says
Condition 9 requires an Uisce Eireann connection agreement before commencement and requires the pump-station remediation identified in the June FI before any works start. The FI foul-water drawing maps the existing sewers, rising main and pumping station; it is labelled planning submission and not for construction. It does not establish an approved new pump capacity.

Why it may matter — interpretation
Utilities and civil teams need the agreed remediation and connection in the enabling-works programme before housing construction starts.

What is not established
Accepted remediation design, pump duty or capacity, connection agreement and completed repair certification are not established.

Inspect the evidence

Decision notification and conditions · p.4
Condition 9: connection agreement and pump-station remediation before works · Issued 2026-07-06 · Decision 6 July; incorporates FI received 9 June · Checked 2026-09-07

Condition 9: connection agreement and pump-station remediation before works

Existing foul-water layout · p.1
Existing foul-water layout PL1: existing pumping station and rising main · Issued 2026-06-05 · GK25173_C101_2 revision PL1, FI submission 5 June; received 9 June; not for construction · Checked 2026-09-07

Existing foul-water layout PL1: existing pumping station and rising main

Bioretention landscaping and local infrastructure are occupation gates

Phased completion and landscape requirements attached to the permission

What the evidence says
The revised site layout places bioretention and open space along the estate edge. Condition 17 requires the pond-edge landscaping to be agreed before commencement and implemented before occupation. It also requires access roads, footpaths, services and green spaces serving the particular dwellings to be completed before those dwellings are occupied, and prohibits construction storage on public open space.

Why it may matter — interpretation
Civil and landscape contractors need the basin edges and usable open space coordinated with phased housing handovers.

What is not established
Accepted pond-edge landscape details, completed drainage and certification of occupation-stage infrastructure are not established.

Inspect the evidence

Revised site layout · p.1
Revision B site layout: bioretention and public open-space arrangement · Issued 2026-04-23 · 1573-PA-003 revision B, 23 April; received 9 June · Checked 2026-09-07

Revision B site layout: bioretention and public open-space arrangement

Decision notification and conditions · p.7
Condition 17: pond-edge landscaping, local infrastructure completion and no open-space storage · Issued 2026-07-06 · Decision 6 July; incorporates FI received 9 June · Checked 2026-09-07

Condition 17: pond-edge landscaping, local infrastructure completion and no open-space storage

Parking needs infrastructure for future EV charging

EV readiness condition for communal and dwelling parking

What the evidence says
Condition 4 requires ducting in communal parking and electrical connections within dwelling curtilages to facilitate future electric-vehicle charging. The details must be agreed before commencement. This establishes enabling infrastructure rather than a confirmed number, rating or installation of chargers.

Why it may matter — interpretation
Electrical and civil teams should coordinate ducts, routes and connection provision with parking construction while retaining final charging specifications as an open item.

What is not established
Agreed electrical design, charger quantities and ratings, supply capacity and installed charging equipment are not established.

Inspect the evidence

Decision notification and conditions · p.3
Condition 4: ducting, curtilage electrical connections and agreement before commencement · Issued 2026-07-06 · Decision 6 July; incorporates FI received 9 June · Checked 2026-09-07

Condition 4: ducting, curtilage electrical connections and agreement before commencement
Remaining document questions
  • Have pump-station remediation, connection, EV and pond-edge compliance details been accepted, and has construction commenced?

The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.

How we know this

From the Tipperary County Council planning register, checked 23 Jul 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Ardgeeha Upper Clonmel

Get alerts for Co. TipperaryFree. We email you when new applications appear.

Free email alerts

Get new Tipperary projects by email

New applications, decisions and site starts in Co. Tipperary. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options