Public / civic, Coláiste Dún Iascaigh, Cashel Road, Cahir
a) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 24 Mar 2026. / Confidence: LowDecision date 24 Mar 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
a) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3 no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors...
Named firms
Public source roles
- Hamilton Young Architects
- Planning agent named on the public planning record
- Submission role only; current appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Tipperary County Council
- Exact reference
- 2660071
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Public / civic
The public application record identifies public / civic in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Tipperary Education & Training Board
- Planning agent
- Hamilton Young Architects
- Agent address
- 12 Beulah Buildings Finisklin Road Sligo F91 NXT5
More Tipperary planning activity
These are county discovery links, not claimed relationships to this application.
Application text
a) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3 no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof; (ii) extension 2 (58.5m²) and extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, and; (iii) extension 4 (38.5m²), a single storey external store extension; b) demolition of part of the existing service yard, including four small stores (total area 67.4m²); c) construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area; d) modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area; e) two new covered bicycle shelters and relocation of the two existing covered bicycle shelters; f) provision of a new heat pump compound enclosed in 2.1m high palisade fencing; g) construction of an SEN enclosed play area and a sensory garden; h) all ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) all associated site services, including external lighting and EV charging
Application to site progress
-
Applied 29 Jan 2026 2660071
-
Decision Conditional 24 Mar 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660071
a) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3 no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof; (ii) extension 2 (58.5m²) and extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, and; (iii) extension 4 (38.5m²), a single storey external store extension; b) demolition of part of the existing service yard, including four small stores (total area 67.4m²); c) construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area; d) modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area; e) two new covered bicycle shelters and relocation of the two existing covered bicycle shelters; f) provision of a new heat pump compound enclosed in 2.1m high palisade fencing; g) construction of an SEN enclosed play area and a sensory garden; h) all ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) all associated site services, including external lighting and EV charging
Open official record