Planning application · Co. Tipperary
RED III Development which will consist of the construction…, Nenagh, Co. Tipperary
Further information requested 31 Aug 2026
Key facts
- Planning application 2660534 at Nenagh, Co. Tipperary: RED III Development which will consist of the construction…
- The applicant is Coolderry Green Energy Ltd. The agent is Colleen Patterson.
- It was received by Tipperary County Council on 29 May 2026.
- Status: Further information requested 31 Aug 2026.
- The council asked for further information on 31 Aug 2026. It decides after the applicant replies.
Source: the Tipperary County Council planning register, checked 11 Nov 2026. Open the council's file
More planning applications in Nenagh · Planning applications in Co. Tipperary
What and where
RED III Development which will consist of the construction…
RED III Development which will consist of the construction and operation of a renewable energy development comprising the following; - 4 No. wind turbines with a tip height of 160m, a hub height of 92m, a rotor diameter of 136m and all associated foundations. - A permanent meteorological mast with an overall height of 92m - Turbine and meteorological mast temporary and permanent hard-standing areas including crane hardstand areas; - Upgrade of an existing farm entrance and access track off the R498 regional road to the south of the site in the townland of Grenanstown, to serve as construction and operation access; - Upgrade and widening of existing internal tracks and provision of new permanent and temporary site access tracks and all associated site drainage; - 1 no. borrow pit and associated drainage infrastructure to be used as a source of stone material during construction; and as a permanent material storage area. - Construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing - A permanent 38kV on-site substation to include control building with electrical infrastructure, welfare facilities, car parking, security fencing and lighting, and all associated infrastructure, services, and site works. - All associated underground electrical and communications cabling connecting the turbines to the proposed on-site 38kV substation. - Underground grid connection between the onsite 38 kV substation and the existing Nenagh 110 kV substation comprising approximately 0.75km within the windfarm, 6.2km along the R498, and 1.1km along the L5136. - Biodiversity enhancement areas - All associated site works above and below ground, including site clearance, site drainage, security gates, fencing, permanent and temporary signage, landscaping and revegetation
- Location
- Nenagh, Co. Tipperary Map
- Council
- Tipperary County Council
- Planning reference
- 2660534
- Application type
- Permission
- Applicant
- Coolderry Green Energy Ltd
- Agent
- Colleen Patterson
Numbers and dates
- Received
- 29 May 2026
Timeline
- Application received
- Further information requested
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2660534 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Tipperary County Council planning register, checked 11 Nov 2026. We link to the council's own file so you can check the official record before you act.