Site start · Co. Waterford
Waterford, Waterford
Site start 14 Oct 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 10 Jun 2026. The details below are as they were then. The council's register has the current status.
What and where
~54 homes
Construction of a residential development comprising 54 no dwelling houses (4no two storey 2 bed terraced, 12no two storey 3 bed semi-detached, 20no two storey 3 bed terraced/end of terrace, 18no two storey 4 bed semi-detached) together with all associated site development works
- Location
- Co. Waterford Map
- Planning reference
- 2360432
- Applicant
- Liam Neville Developments
- Agent
- Liam Neville Developments
Key facts
- Homes
- ~54estimated from the application
- Floor area
- 4,572 m²
- Estimated construction value
- €6.9m to €8.8mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Large residential
- Site start
- 14 Oct 2024
Documents and evidence
Check the record
- Council planning fileThe application file 2360432 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Engineering Planning Report in the council's file.
- Unit mix
- 4 2 Storey 2 Bed Terraced Dwellings, 12 2 Storey 3 Bed Semi-Detached Dwellings, 20 2 Storey 3 Bed Terraced Dwellings, 18 2 Storey 4 Bed Semi-Detached Dwellings
- Site area
- 2.56 ha
- Applicant
- Liam Neville Developments Ltd
- Phasing
- Phase One of an overall scheme of some 164 units plus a creche
- Scope
- The development comprises 54 residential units with associated roads, drainage, water supply, and site lighting on a 2.56 ha site at Williamstown Road, Waterford.
- Rainwater
- “surface water sewer pipes 225mm to 450mm diameter”
- Wastewater
- “foul sewer pump station and rising main to existing rising main”
How we know this
From the Waterford City and County Council planning register, as last seen on 10 Jun 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 14 Oct 2024Work started · phase 1 · Construction of 8no Residential Units (Duplex Block A)
- 14 Oct 2024Work started · phase 2 · Construction of 8no Residential Units (Duplex Block B)
- 14 Oct 2024Work started · phase 3 · Construction of 8no Residential Units (Duplex Block D)
- Completion certificate recordedRecorded in Oct 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 1 Oct 2026.
- Completion certificate recordedRecorded in Oct 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 1 Oct 2026.
- Completion certificate recordedRecorded in Oct 2024 · 8 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 1 Oct 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.