Large residential · Co. Westmeath

Saunders Bridge, Ardmore Road Ballinderry Td., Mullingar Co. Westmeath

Decision to grant 8 Jul 2026

Get updates on this application

We'll email you when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2560495 at Saunders Bridge, Ardmore Road Ballinderry Td., Mullingar Co. Westmeath: Housing development.
  • The applicant is Tiberville Ltd. The agent is Mark Brindley.
  • It was received by Westmeath County Council on 10 Oct 2025.
  • Status: Decision to grant 8 Jul 2026.
  • The council decided on 8 Jul 2026 to grant permission. Final grant not yet recorded. No site start has been filed yet.

Source: the Westmeath County Council planning register, checked 6 Aug 2026. Open the council's file

Planning applications in Co. Westmeath

What and where

Housing development

development comprising 93 no. residential units and a childcare facility at Saunders Bridge, Ardmore Road, Mullingar, Co. Westmeath, on a site of 4.48 Ha. The proposed development will consist of: 81 no. 2-storey housing units; 5 no. 3 bed mid terraced units, 54 no.3 bed semi-detached units, 22 no. 4 bed semi-detached units and 12 no. 2 bed apartment units in a singular block, a creche facility (circa. 242 m²), the formation of 3 no. vehicular access points off the established residential access road and associated residential road network, active travel route, 184 no. car parking spaces and 220 no. cycle parking spaces. The proposal includes all associated hard and soft landscaping, boundary treatments, footpaths an ESB Sub-Station, and all other ancillary works above and below ground

Location
Ardmore Road Ballinderry Td, Co. Westmeath Map
Planning reference
2560495
Applicant
Tiberville Ltd

Numbers and dates

Project type
Large residential
Received
10 Oct 2025
Decision to grant
8 Jul 2026Final grant not yet recorded

Timeline

  1. Application received
  2. Decision to grant
  3. Appeal lodged
  4. Appeal decidedInvalid - late S.127(1)(g)

Outlook

What happens next

The council decided on 8 Jul 2026 to grant permission. Final grant not yet recorded. No site start has been filed yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Crèche or childcare facilityNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

Reviewed build intelligence

What the documents establish

Government document review

Westmeath decided to grant 93 homes (81 houses and 12 apartments) and a childcare facility on 8 July 2026 with 24 conditions. Appeal 501836 is pending. The June services design, earlier indicative finishes and council conditions remain separate evidence stages, with no final grant or installed works established.

3 official documents inspected · Checked 2026-09-05 · Official file index

Two drainage networks with StormTech storage

Proposed in application · Revision 03 services proposal dated 10 June 2026, received 11 June

What the evidence says
The June 2026 services revision specifies voided stone below permeable parking, rainwater diffuser units, roadside collection, petrol interception and StormTech attenuation. Network 1 also routes north-road runoff through a swale. Infiltration test results were inconclusive, so storage design uses a 100-year rainfall event with a 30% climate allowance.

Why it may matter — interpretation
Interpretation: identifies distinct drainage packages and the reason storage is required instead of assuming reliable infiltration.

What is not established
No installed tank, confirmed storage volume, final construction drawing or condition discharge was verified. The two networks are not housing phases or separate projects.

Inspect the evidence

Saunders Bridge: Services Design Report · p.5
StormTech Attenuation Storage Tanks · Issued 2026-06-10 · Project 24217, Revision 03; received 11 June 2026 · Checked 2026-09-05

StormTech Attenuation Storage Tanks

Saunders Bridge: Services Design Report · p.6
results were inconclusive · Issued 2026-06-10 · Project 24217, Revision 03; received 11 June 2026 · Checked 2026-09-05

results were inconclusive

Different Hydro-Brake controls for the two networks

Proposed in application · Separate modelled outflow controls in the 10 June 2026 services revision

What the evidence says
The model specifies Hydro-Brake Optimum outflow controls for Network 1 at a design flow of 18.8 litres per second and design head of 1.420 metres, and for Network 2 at 4.0 litres per second and 1.200 metres. Both calculation sheets warn that substitution of another control type invalidates the routing calculations.

Why it may matter — interpretation
Interpretation: distinguishes the design flow and head for each drainage network.

What is not established
No supply order, installed control or agreed substitute is established. The flow rates are not combined into a project demand figure.

Inspect the evidence

Saunders Bridge: Services Design Report · p.15
Hydro-Brake Optimum Outflow Control · Issued 2026-06-10 · Project 24217, Revision 03; received 11 June 2026 · Checked 2026-09-05

Design Head (m) 1.420 Design Flow (l/s) 18.8

Saunders Bridge: Services Design Report · p.21
Hydro-Brake Optimum Outflow Control · Issued 2026-06-10 · Project 24217, Revision 03; received 11 June 2026 · Checked 2026-09-05

Design Head (m) 1.200 Design Flow (l/s) 4.0

Indicative roof, window and balcony systems

Proposed in application · Original July 2025 life-cycle schedule, received 10 October 2025

What the evidence says
The July 2025 life-cycle report describes brick and self-finished render, TPO or similar flat-roof membranes, flat cement tiles on pitched roofs, thermally broken double-glazed uPVC or aluminium windows, and powder-coated steel balconies capable of off-site manufacture. The report expressly says its material information is indicative and subject to detailed design.

Why it may matter — interpretation
Interpretation: identifies potential envelope and balcony packages without turning maintenance assumptions into final specifications.

What is not established
Final brands, profiles, colours, performance certificates and later agreed substitutions remain unconfirmed. Indicative service lives are not product warranties.

Inspect the evidence

Saunders Bridge: Building Lifecycle Report · p.6
indicative and subject to change · Issued July 2025 (month only) · July 2025 report; received 10 October 2025; material schedule indicative · Checked 2026-09-05

indicative and subject to change

Saunders Bridge: Building Lifecycle Report · p.7
TPO or similar · Issued July 2025 (month only) · July 2025 report; received 10 October 2025; material schedule indicative · Checked 2026-09-05

TPO or similar

Council required 10% communal EV charging

Council decision under appeal · Condition 5 in the council decision to grant, now under appeal 501836

What the evidence says
Condition 5 of the 8 July 2026 council decision requires functioning EV charging at a minimum of 10% of communal parking spaces, ducting for the remaining communal spaces, and exterior electric connections for future charging at in-curtilage house parking. Compliance details must be agreed before commencement.

Why it may matter — interpretation
Interpretation: separates communal charger provision from private parking prepared for future charging.

What is not established
Exact charger quantities, power ratings, operator appointments, installed systems and Commission outcome remain unconfirmed.

Inspect the evidence

Westmeath 25/60495: notification of decision to grant · p.3
A minimum of 10% · Issued 2026-07-08 · Council decision with 24 conditions; Commission appeal 501836 pending · Checked 2026-09-05

A minimum of 10%

Council removed the proposed amphitheatre earthworks

Council decision under appeal · Condition 6 in the council decision to grant, now under appeal 501836

What the evidence says
Condition 6 requires revised plans omitting the proposed amphitheatre earthworks shown on landscape drawing 093624_LP_02 dated 11 June 2026. It instead requires a generally level landscaped amenity area with minimal alteration to existing ground levels, subject to written agreement.

Why it may matter — interpretation
Interpretation: records a later scope change affecting earthworks and landscaping.

What is not established
The replacement agreed landscape drawing, cut-and-fill quantities and completed works were not inspected.

Inspect the evidence

Westmeath 25/60495: notification of decision to grant · p.3
omitting the proposed Amphitheatre earthworks · Issued 2026-07-08 · Council decision with 24 conditions; Commission appeal 501836 pending · Checked 2026-09-05

omitting the proposed Amphitheatre earthworks
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 3 government-published PDFs were visually inspected. The parser found 178 document rows containing View links; the normal browser counted 179 visible links, a different link-count basis. Three PDFs were inspected on selected pages; the full 178-row case file was not reviewed. Proposals do not establish procurement or installed work.

How we know this

From the Westmeath County Council planning register, checked 6 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Ardmore Road Ballinderry Td

Get alerts for Co. WestmeathFree. We email you when new applications appear.

Free email alerts

Get new Westmeath projects by email

New applications, decisions and site starts in Co. Westmeath. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options