Protected structure, Coláiste Mhuire, College Street, Mullingar
construction of a single storey detached gym building and all associated site works. The proposed works are within the curtilage of a protected structure, St. Mary’s College (Hevey Institute) – RPS no: 019-157
The public decision state is shown, but conditions and later amendments can still change delivery scope.
The protected-structure designation is source evidence and can shape specification and method.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
What the public record evidences
Protected structure
The public application record identifies protected structure in the submitted planning scope.
Protected-structure / conservation scope
The public application description explicitly references protected-structure / conservation scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Board of Management of Coláiste Mhuire, Mullingar
- Planning agent
- Niall Smith
- Agent address
- Hall Street Kingscourt Co. Cavan A82 K8A0
Application text
construction of a single storey detached gym building and all associated site works. The proposed works are within the curtilage of a protected structure, St. Mary’s College (Hevey Institute) – RPS no: 019-157
Application to site progress
-
Applied 21 Oct 2025 2560513
-
Decision Conditional 8 Jun 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded Smaller works often do not require a completion certificate.
Source, scope and limits
Application description and scale 2560513
construction of a single storey detached gym building and all associated site works. The proposed works are within the curtilage of a protected structure, St. Mary’s College (Hevey Institute) – RPS no: 019-157
Open official record