Back to leads
New Application

Commercial new build, Mullingar (Ardmore) Business & Technology Park... - Planning Application 2660324

Westmeath / Mullingar . Westmeath / Mullingar (Ardmore) Business & Technology Park, Marlinstown Ardmore, Mullingar Co. Westmeath

Est. value €3m–10m
Units Not listed
Floor area 2,500 m²
Decision due 14 Aug 2026

Source-linked planning record

Commercial new build, Mullingar (Ardmore) Business & Technology Park... - Planning Application 2660324

Westmeath / Mullingar . Westmeath / Mullingar (Ardmore) Business & Technology Park, Marlinstown Ardmore, Mullingar Co. Westmeath
PB ref
PB--3470493489
Plan ref
2660324
Authority
Westmeath County Council
Stage / date
New Application / 14 Aug 2026
Est. value band
€3m–10m
Units / floor
2,500 m²
Project class
Commercial new build
Promoter
Westmeath Enterprise & Innovation Designated Activity Company
Architect / agent
Catherine Norris

Source: http://www.eplanning.ie/WestmeathCC/AppFileRefDetails/2660324/0

Key facts

Lead summary

Source
Westmeath County Council public planning register
Planning authority
Westmeath County Council
Application reference
2660324
Applicant
Westmeath Enterprise & Innovation Designated Activity Company
Agent
Catherine Norris
Decision stage
New Application
Decision due
14 Aug 2026
Floor area
2,500 m²

Official description

Verbatim source text

development at the site at Ardmore Business & Technology Park. The site is c. 1.307 hectares in size. It is made up of greenfield lands together with sections of existing road, footpath and cycleway. It is bound to the north, east and west by estate roads within Mullingar Business Park (with access from the N52), and to the south by an existing hedgerow. The development will consist of: [1] The construction of an Advanced Building Solution (ABS) building ranging from one to three storeys (6.2 meters (m) to 14.2 m in height), with a gross floor area of 2,500 square meters (sq. m) to accommodate light industrial / manufacturing and office uses. The building will comprise: (a) A three-storey reception and support office block (12.7 m to 14.2 m in height, 700 sq. m in area) providing covered entrance, reception, administration, staff welfare facilities, ancillary office space and plant rooms; (b) A light industrial / manufacturing production space (10 m clear internal height, 12.7 m to 14 m externally, 1,725 sq. m in area); (c) A single-storey services block (6.2 m in height, 75 sq. m in area) accommodating a substation, switchroom and waste storage area, together with an associated external services yard; and (d) The provision of c. 300 sq. m of photovoltaic panels at roof level. [2] The modification of two existing vehicular access points to provide one point of vehicular and pedestrian access and one point of articulated lorry access; the creation of a new shared pedestrian / cycle entrance point and path. [3] The construction of 41 no. car parking spaces (including 3 no. accessible spaces and 7 no. EV charging spaces) and 42 no. bicycle parking spaces (6 no. Sheffield bicycle stands and 15 no. bicycle stands under shelters, each stand accommodating 2 no. bicycles). [4] The provision of a new uncontrolled pedestrian and cycle crossing in the Mullingar Business Park Estate Road and the northern part of the site, together with associated vehicular and pedestrian signage and ancillary works. [5] All associated and ancillary site development works, site and landscape clearance, the installation of hard and soft landscape planting; drainage infrastructure; fencing and boundary treatments; building, vehicular and pedestrian signage; utilities and site services; and all associated site works

Verify against official source

Project team

Named source parties

Promoter
Westmeath Enterprise & Innovation Designated Activity Company
Planning agent
Catherine Norris
Agent address
Turley 4 Pembroke Street Upper Dublin 2 D02 VN24

Lifecycle timeline

Application to site progress

  1. Applied

    20 Jun 2026 2660324
  2. Decision

    N/A
  3. Commenced

    No commencement indexed Owner-export and BCMS records are indexed only when a reliable source link exists.
  4. Completed

    Completion not recorded Smaller works often do not require a completion certificate.

Likely trades & supplier leads

Inferred from scheme type and scale

ComplianceElectricalFire SafetyFit-outHealth & SafetyMain contractorMechanicalSecuritySignageSolar/Energy