Infrastructure · Co. Westmeath

Mullingar (Ardmore) Business & Technology Park, Marlinstown, Ardmore, Mullingar, Co. Westmeath

Decision to grant 9 Nov 2026, open to appeal until 7 Dec 2026

Get updates on this application

We'll email you if the decision is appealed and when building work starts.

We send a confirmation link first. Nothing starts until you click it. You can stop at any time.

Key facts

  • Planning application 2660324 at Mullingar (Ardmore) Business & Technology Park, Marlinstown, Ardmore, Mullingar, Co. Westmeath: [1] The construction of an Advanced Building Solution building…
  • The applicant is Westmeath Enterprise & Innovation Designated Activity Company. The agent is Catherine Norris.
  • It was received by Westmeath County Council on 20 Jun 2026.
  • Status: Decision to grant 9 Nov 2026, open to appeal until 7 Dec 2026.
  • The council decided on 9 Nov 2026 to grant permission. The decision is open to appeal until 7 Dec 2026; the final grant issues after that if there is no appeal, and building work cannot start before it. No site start has been filed yet.

Source: the Westmeath County Council planning register, checked 19 Nov 2026. Open the council's file

More planning applications in Mullingar · Planning applications in Co. Westmeath

What and where

[1] The construction of an Advanced Building Solution building…

development at the site at Ardmore Business & Technology Park. The site is c. 1.307 hectares in size. It is made up of greenfield lands together with sections of existing road, footpath and cycleway. It is bound to the north, east and west by estate roads within Mullingar Business Park (with access from the N52), and to the south by an existing hedgerow. The development will consist of: [1] The construction of an Advanced Building Solution (ABS) building ranging from one to three storeys (6.2 meters (m) to 14.2 m in height), with a gross floor area of 2,500 square meters (sq. m) to accommodate light industrial / manufacturing and office uses. The building will comprise: (a) A three-storey reception and support office block (12.7 m to 14.2 m in height, 700 sq. m in area) providing covered entrance, reception, administration, staff welfare facilities, ancillary office space and plant rooms; (b) A light industrial / manufacturing production space (10 m clear internal height, 12.7 m to 14 m externally, 1,725 sq. m in area); (c) A single-storey services block (6.2 m in height, 75 sq. m in area) accommodating a substation, switchroom and waste storage area, together with an associated external services yard; and (d) The provision of c. 300 sq. m of photovoltaic panels at roof level. [2] The modification of two existing vehicular access points to provide one point of vehicular and pedestrian access and one point of articulated lorry access; the creation of a new shared pedestrian / cycle entrance point and path. [3] The construction of 41 no. car parking spaces (including 3 no. accessible spaces and 7 no. EV charging spaces) and 42 no. bicycle parking spaces (6 no. Sheffield bicycle stands and 15 no. bicycle stands under shelters, each stand accommodating 2 no. bicycles). [4] The provision of a new uncontrolled pedestrian and cycle crossing in the Mullingar Business Park Estate Road and the northern part of the site, together with associated vehicular and pedestrian signage and ancillary works. [5] All associated and ancillary site development works, site and landscape clearance, the installation of hard and soft landscape planting; drainage infrastructure; fencing and boundary treatments; building, vehicular and pedestrian signage; utilities and site services; and all associated site works

Location
Mullingar, Co. Westmeath Map
Planning reference
2660324
Application type
Permission
Applicant
Westmeath Enterprise & Innovation Designated Activity Company

Numbers and dates

Floor area
2,500 m²
Project type
Infrastructure
Received
20 Jun 2026
Decision to grant
9 Nov 2026
Appeals until
7 Dec 2026

Timeline

  1. Application received
  2. Further information requested
  3. Further information received
  4. Decision to grant

Outlook

What happens next

The council decided on 9 Nov 2026 to grant permission. The decision is open to appeal until 7 Dec 2026; the final grant issues after that if there is no appeal, and building work cannot start before it. No site start has been filed yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660324 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Westmeath County Council planning register, checked 19 Nov 2026. We link to the council's own file so you can check the official record before you act.

Explore the area

More planning activity near Mullingar

Get alerts for MullingarFree. We email you when new applications appear.

Free email alerts

Get new Mullingar projects by email

New applications, decisions and site starts in Mullingar, Co. Westmeath. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options