Save this project to account

Infrastructure · Co. Westmeath

Development which will consist of refurbishment works to 24.2…, Co. Westmeath

Archived record: last seen in the register on 22 Sep 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 22 Sep 2026. The details below are as they were then. The council's register has the current status.

What and where

Development which will consist of refurbishment works to 24.2…

development which will consist of refurbishment works to 24.2 kilometres (km) of OHL; comprising provision of fibre wrap; replacement of 7 no. steel towers; replacement of 73 no. pole-sets/poles; replacement of 9 no. pole-set cross arms only; refurbishment work to 19 no. wooden pole-sets; and the treatment and painting of 2 no. steel towers. These structures (No’s. 182-299) and the associated OHL lie between where the OHL crosses the border into County Westmeath in the townland of Grange More, to where the OHL ties-in to the existing Mullingar 110kV substation in the townland of Irishtown, crossing the County Westmeath townlands of Grange More, Craddanstown, Joristown Lower, Priesttown, Clonreagh, Corbetstown, Higginstown, Hodgestown, Millerstown, Corbally, Edmondstown, Clonlost, Clonickilvant, Ballycor, Aghadaugh, Killynan (Cooke), Mountrobert, Macetown, Rathconnell, Clonsheever, Culleen Beg, Robinstown (Levinge), Ballyglass and Irishtown. The Proposed Development also includes 1 no. temporary Construction Compound in the townland of Aghadaugh. The refurbishment works in County Westmeath will consist of: the replacement (‘restringing’) of the existing OHL circuit conductor wires; the installation of fibre wrap; replacement of 7 no. steel towers and 73 no. wooden pole-sets/poles with similar dimensions and heights as the existing (replacement towers will be no more than 0.5m taller than existing and replacement pole-sets/poles will be no more than 3m taller than existing); installation of replacement parts on towers and pole-sets; foundation refurbishment / strengthening and recapping / clearing of shear blocks; treatment and painting of towers to be retained; all associated site development works, including temporary works areas; clearance of shear block bases; vegetation maintenance works; ancillary site preparation works, site clearance and levelling at the 1 no. temporary construction compound; temporary works to existing tracks and new temporary access routes to each structure, one of which is within the curtilage of Millerstown House (protected structure RPS No. 020-050), in the townland of Millerstown; and all associated works required to facilitate the Proposed Development A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Location
Co. Westmeath Map
Planning reference
2660445
Applicant
Eirgrid Plc.
Agent
Zoe Dalton

Key facts

Project type
Infrastructure
Received
24 Aug 2026
Protected structure
Yes, RPS 020-050

Outlook

What happens next

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 2660445 on eplanning.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Westmeath County Council planning register, as last seen on 22 Sep 2026. The council's own file is the official record.

Explore the area

More planning activity near Co. Westmeath

Get alerts for Co. WestmeathFree. We email you when new applications appear.

Free email alerts

Get new Westmeath projects by email

New planning applications, decisions and site starts in Co. Westmeath. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options