Public / civic, Robinstown Road, Springfield Td, Mullingar
(a 10 year permission) for the proposed development of a Gaelic athletic association training and player development centre at, a site of circa. 18.9 hectares. The development comprises the layout and provision of 6 no. full sized Gaelic sport playing pitches (5 no. grass and 1 no. all-weather), associated perimeter...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
A decision-stage public state is indexed. / Confidence: LowA decision-stage public state is indexed.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
(a 10 year permission) for the proposed development of a Gaelic athletic association training and player development centre at, a site of circa. 18.9 hectares. The development comprises the layout and provision of 6 no. full sized Gaelic sport playing pitches (5 no. grass and 1 no. all-weather), associated perimeter floodlighting and ball nets, 1 no. all-weather hurling and ball wall, for training purposes, supporting outdoor maintenance building of 271 m². The proposed development comprises a comprehensive...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Westmeath County Council
- Exact reference
- 2660471
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Public / civic
The public application record identifies public / civic in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Westmeath GAA
- Planning agent
- Tomás Skinner
- Agent address
- The Bank Building 52 Oliver Plunkett Street Mullingar N91 FAA6
More Westmeath planning activity
These are county discovery links, not claimed relationships to this application.
Application text
(a 10 year permission) for the proposed development of a Gaelic athletic association training and player development centre at, a site of circa. 18.9 hectares. The development comprises the layout and provision of 6 no. full sized Gaelic sport playing pitches (5 no. grass and 1 no. all-weather), associated perimeter floodlighting and ball nets, 1 no. all-weather hurling and ball wall, for training purposes, supporting outdoor maintenance building of 271 m². The proposed development comprises a comprehensive landscape proposal as provides for woodland retention, ecological buffers, new areas of native species planting and biodiversity net gain and a linear walking loop. Presented within the landscape setting is the proposed construction of a supporting facilities building totalling 9,695 m² (ground floor 6,478 m² and first floor 3,217 m²) of which; 5,310 m² is dedicated to the necessary changing and player support facilities, 1,414 m² for community gymnasium, physiotherapy and sports health suites, 1,942 m² for community conference, dining and hospitality space and 1,029 m² of community & civic assembly space and internal circulation needs. A 210 seated spectator area is integrated into the facilities building design as addresses the main premier pitch. The pitch facilities and supporting building are accessed via a proposed new access road and junction off the Robinstown Link Road, and presented with parking for 335 no. cars, 10 no. coaches and 80 no. secure, covered cycle stands associated supporting lighting, and all above and below ground associated works. The proposal also benefits from a proposed active travel (pedestrian/cycle) link from the Delvin Road adjacent St. Loman’s GAA grounds. A Natura Impact Statement (NIS) has been prepared and accompanies this application
Application to site progress
-
Applied 4 Sep 2026 2660471
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660471
(a 10 year permission) for the proposed development of a Gaelic athletic association training and player development centre at, a site of circa. 18.9 hectares. The development comprises the layout and provision of 6 no. full sized Gaelic sport playing pitches (5 no. grass and 1 no. all-weather), associated perimeter floodlighting and ball nets, 1 no. all-weather hurling and ball wall, for training purposes, supporting outdoor maintenance building of 271 m². The proposed development comprises a comprehensive landscape proposal as provides for woodland retention, ecological buffers, new areas of native species planting and biodiversity net gain and a linear walking loop. Presented within the landscape setting is the proposed construction of a supporting facilities building totalling 9,695 m² (ground floor 6,478 m² and first floor 3,217 m²) of which; 5,310 m² is dedicated to the necessary changing and player support facilities, 1,414 m² for community gymnasium, physiotherapy and sports health suites, 1,942 m² for community conference, dining and hospitality space and 1,029 m² of community & civic assembly space and internal circulation needs. A 210 seated spectator area is integrated into the facilities building design as addresses the main premier pitch. The pitch facilities and supporting building are accessed via a proposed new access road and junction off the Robinstown Link Road, and presented with parking for 335 no. cars, 10 no. coaches and 80 no. secure, covered cycle stands associated supporting lighting, and all above and below ground associated works. The proposal also benefits from a proposed active travel (pedestrian/cycle) link from the Delvin Road adjacent St. Loman’s GAA grounds. A Natura Impact Statement (NIS) has been prepared and accompanies this application
Open official record