Whitegate, Cork
Permission for the construction of a single storey detached domestic dwelling, a new site entrance, a new wastewater treatment unit and percolation area, and all associated site works.
Co. Cork
12 planning applications · 50 site starts · latest 9 Nov 2026
Source: each council's planning register. Every record below links to its own page and to the council's file.
Newest first
Permission for the construction of a single storey detached domestic dwelling, a new site entrance, a new wastewater treatment unit and percolation area, and all associated site works.
Outline permission for 4 no. semi detached, two-storey dwelling houses, complete with access road, bridge and paved courtyard, including site boundaries and all other site development and landscaping...
Permission for refurbishment and change of use of the existing derelict stone building to provide a dwelling house, including repairs, refurbishment and conservation of the existing structure...
The proposed development will consist of a 10-year permission for the construction of a Battery Energy Storage System (BESS) facility comprising of 80 containerised lithium-ion BESS units on skids, 20 MV...
Permission for construction of a new first floor extension to the rear elevation, on top of the existing single storey accommodation, all to the existing single storey, semi-detached dwelling with...
In Whitegate
In Whitegate
Dated since 1 Nov
Newest record date
32 of 62 · then Extension, One-off house
Earlier records
To construct a new two storey dwelling, site entrance, wastewater treatment system and all associated site works and services
1) alterations to the existing facades to increase existing window widths and heights and fit some with sliding doors: 2) the construction of a new solid roof sheltering canopy to the northern facade...
1) the re-construction of part of the fire damaged single storey detached dwelling, including the re-building of the demolished utility and living room and the first floor attic and roof structure; 2)...
Permission for Retention as constructed of an extension to front of existing dwelling house.
Permission consequent on outline permission bearing no. 25/4783 to construct part single storey, part storey and a half dwelling with detached garage, site entrance, driveway and domestic effluent...
Permission to erect: a new storage/workshop unit, re locate existing steel storage container and demolish part of existing storage attached to main dwelling, including all associated site works
Opt Out- Construction of a new dwelling house
Permission for the construction of a new part single storey, part two storey, detached dwelling including a single storey detached garage with covered canopy link, a new waste water treatment unit and...
Permission for retention of (1) elevational changes including natural stone added to front elevation of her existing dwelling, (2) a single storey rear extension as constructed to her dwelling house, (3)...
Opt Out- Construction of a new dwelling house
Bord Gáis Energy Limited intend to apply for planning permission for development at Glanagow and Corkbeg (townlands), Whitegate, Co. Cork, within a total site area of 3.15 hectares within the curtilage...
Alterations & extensions to dwelling house consisting of an attic conversion incorporating a rear dormer style extension, elevational changes & any associated site works.
demolition of existing extension and construction of new two storey extension and internal modifications and refurbishment
construction of first floor extension, construction of single-storey extensions to rear and side, elevational changes and internal alterations to existing dwelling and all ancillary site works. at...
construction of domestic garage
Construction of a new two-storey dwelling house, wastewater treatment unit, new entrance and all associated site works at Finure, Whitegate, Co. Cork.
The demolition of a lean to porch and two extensions to the east and north of the main building, the replacement of the existing windows, doors, rain water goods, internal floors, internal finishes and...
the construction of elevational alterations to all existing elevations; 3) the construction of a new first floor extension to the rear of the building; 4) alterations to the existing roof structure; all...
Construct a new dwelling house, new vehicular parking area
The construction of a new single storey extension and alterations to the gable wall of a a one and a half storey detached dwelling at Inch, Whitegate, Co. Cork
construction of a granny flat
Construction of two new detached, two- storey, dwellings and entrance at Ballincarroonig, Whitegate, Co. Cork.
construction of a dwelling and associated site works
One off dwelling - Ardnabourkey
construction of dwelling and associated site works
construction of a domestic garage
Construction of a new dwelling with garage attached
Partial demolition of existing building and construction of extension together with associated site works.
1) The demolition of the existing single storey sunroom to the existing front elevation, 2) the construction of a new single storey extension to both the front and rear elevations, 3) changes to the...
The construction of a new part single storey, part two storey, detached dwelling including all associated works
Construction of dwelling house, entrance, waste water treatment unit and all associated site works
IPP substation comprising a single-storey building and external plinths.
Construction of underground pump station at Whitegate, as part of Whitegate Sewerage Treatment Scheme
Proposed Factory Unit at Ballynookery, Whitegate, Co. Cork
Opt Out- Construction of a new dwelling house (change of layout and design from that granted under planning ref: 20/05645)
Construction of 11No dwelling houses (No's: 21, 72, 73, 89, 90, 91, 92, 93, 94, 95, 96) and all associated site works, including vehicular access, parking, footpaths, drainage, landscaping and amenity...
raise eaves and ridge level of part of existing semi- detached cottage to provide increased height dormer accommodation including, altering fenestration of dormer windows and sundry internal works.
additional storey with dormer windows to form storey and half building, together with new entrance porch with all associated site development works.
Single Storey Domestic Garage.
New part single storey, part two storey, detached dwelling and associated site works.
Construction of ground floor rear extension and 1st floor extension on top of existing garage
Proposed development to take place in Lower Aghada, Aghada, Co. Cork. The development will include a prefabricated MV Switchgear Module placed on a concrete cable pit, with cables and ducting running to...
OPT OUT- Construction of a new extension with basement to side & rear of existing dwelling, new entrance and all associated site works.
Opt out-Construction of two storey extension and all associated site work for Jim O'Neill at No.4 Thornton Park, Whitegate, Co.Cork. Planning Reg. No.194860
Construction of part two storey and part dormer dwelling including site entrance, effluent treatment plant and all associated site development works.
The project will consist in the construction of a 2-storey extension to the south (side) elevation of an existing Eurospar Convenience Store, associated steel-clad double height goods inwards area and...
Construction of dormer bungalow, septic tank, driveway, site entrance and all associated site development works
construction of a dwelling with associated site works
Rear extension, front porch, internal modifications and all associated site works to existing dwelling.
Extension to rear of 20 Cois Cuain
Construction of a ground floor extension to front and a two storey extension to rear of existing dwelling with new access from laneway. Enlargement of existing dormer to front roof and construction of...
Canopy over Courtyard
The construction of a new single storey Control Building within the existing 220 kV Aghada Station.
Optout - New Dormer Dwelling and Associated Site Works at The Courtyard, Barrack Street, Mosestown, Whitegate, Co. Cork.
Opt Out Justin Tait and Gillian Murphy, Construction of dormer bungalow with detached domestic garage, effluent treatment plant, site entrance and site development works
dwelling house OPT OUT
Construction of a split level, storey and a half style dwelling and all associated site works at Ballincarroonig, Whitegate
Council
Nearby
Explore
Quick answers