Dublin 1, Dublin
Minor material alteration i.e. providing a new connection from Zara to back of house corridor at Ilac Shopping Centre.
Co. Dublin
191 planning applications · 308 site starts · latest 20 Nov 2026
Page 5 of 5 · newest first
Minor material alteration i.e. providing a new connection from Zara to back of house corridor at Ilac Shopping Centre.
Material Alterations: Fitout Works to Unit 68, Ginzeng, Ilac Shopping Centre, Dublin 1
7-Day Notice - Erection of new partitions to serving counter within the restaurant and associated alterations to fit out.
7-Day Notice - Change of use from office to residential SI 30 Notification.
7-Day Notice - Change of use of ground floor & basement of Number 4 Mary Street, Dublin 1 from commercial to restaurant use.
In Dublin 1
In Dublin 1
Dated since 1 Nov
Newest record date
113 of 499 · then Change of use, Protected structure
Earlier records
7-Day - Sub division of the third floor of an existing office building. Two tenants will occupy the third floor.
7-Day Notice - Internal Stairs access and Storage room at Centra Point Campus
Demolition of an existing 3 storey apartment building and the construction of a 4 storey mixed use development.
7-day notice - conversion of existing building in office use to hotel use
Change of use from retail use to coffee shop use and fit-out of same.
7-Day Notice - Change of Use and Refurbishment of Protected Structure at 1 Capel Street
7-Day Notice - change of use at basement and ground floor levels from existing office use to proposed apartment use (2 no. 1 bed apartments) at No. 14 Belvedere Place, Dublin 1.
7-Day Notice - Conversion/material alteration of existing apartments at the 1st, 2nd & 3rd Floors of Rear 123 Capel St., Dublin 1, (with frontage onto Anglesea Row), to provide 3No. two bedroom...
7-Day Notice - New hotel consisting of 310 bedrooms located at the first floor through to the seventh floor, bar/lounge area at ground level and several ancillary services. The hotel has seven floors...
7-Day Notice - Internal fit out of the 4th floor to Ullysses Hse, Foley St, Dublin.
7-Day Notice - Material Alterations arising from the new Units for proposed 12A, 12B, 12C and 13 (First Floor and First Floor Upper), Landlord shell & core works only, Jervis Shopping Centre, Jervis...
7-Day Notice - The material change of use of part existing building and the construction of a new part seven (7) storey hotel on the site formerly known as Zanzibar (34-37 Ormond Quay Lower) and lands to...
7-Day Notice - Alternation of existing building to make 2 no. meeting rooms and an office and provision of a lobby at the top of the stairs on the first floor.
7-Day Notice - Retail Fit-out of Unit 30A, the Ilac Centre, into a Jump Juice Bar.
7-Day Notice - The proposed works consist of the refurbishment and conversion of 2 adjoining Georgian semi-detached properties from office use to student accommodation. The proposed student flats include...
7-Day Notice - Change of Use from Existing Office use and Place of Worship to Public House including material alterations on all floors and floor extensions into the existing voids, in the space between...
7-Day Notice - Material Alterations arising from the fit-out of the previously approved Shell & Core Unit 18 for Superdrug at the Jervis Shopping Centre
7-Day Notice - Material internal alterations consisting of minor alterations to common areas and internally to 13 number existing residential units to upgrade building in terms of Fire safety...
The demolition of all existing structures on the site at site at Upper Mayor Street and 113-115 Sheriff Street, Dublin 1. This commencement notice is for demolition works only - it will be followed by a...
7-Day Notice - Material Alterations and Subdivision to previous Unit 18 to a new Unit 18 and Unit 19 at First Floor and First Floor Upper, Jervis Shopping Centre, Jervis Street, Dublin 1
7-Day Notice - Internal alterations at Ground Floor level of Code Hostel, 21-28 Talbot Place, Dublin 1.
7-Day Notice - Change of use and amalgamation of 2 no. ground floor retail units with a combined total GFA of 446 sq.m. to office use...
7-day notice - refurb of existing st philomena`s ward as 8 no. Single bed ward unit and provision of new bridge link to existing lift at first floor level front to the right of main entrance to hospital
7-Day Notice - Fit out of existing retail unit and associated site works
7-Day Notice - Change of use from retail use to licensed restaurant use at ground floor level together with associated modifications to facilitate restaurant use.
7-Day Notice - Works will comprise fit out of the existing office accommodation at Ground, 1st, 2nd & 3rd floor levels to provide private and collaborative open plan work space, meeting rooms and staff...
7-Day Notice - Material alteration and refurbishment of existing 'grey box' shell unit on behalf of tenant (trading as "Stradivarius"), comprising new internal layout, finishes and associated mechanical...
7-Day Notice - The internal fit out of unit 3 ground floor and ground floor upper for JD Sports, Jervis Shopping Center, nos. 17-21 Mary Street, Dublin 1 to provide retail, retail storage and staff...
demolition of an existing single storey shop, and the construction of a three storey development, comprising 2 no. two bedroom apartments, and 1 no. three bed apartment, with all associated site works...
Change of use of the existing storage area to provide for an extended retail floor and a reheat bakery
7-Day Noitce - Enabling works project to include demolition of an existing single storey building, perimeter piling, and basement excavation to faciliate a new build hotel.
7-Day Notice - The Construction of an 8 storey Aparthotel at North Wall Quay with 241 rooms, balconies located on all elevations with café/bar, retail unit, gym, apart-hotel reception...
Material Alterations arising from the subdivision of Unit 2, into a new Unit 2 and Unit 3 at Jervis Centre, 125 Abbey Street, Dublin 1
7-Day Notice - Fit out of a food outlet in existing unit at Point Square, Dublin 1
Material alterations to an existing lower ground floor office space: including alterations and upgrade to fire- rating of existing partitions
Internal fit-out of part of the second floor of an existing 5 storey office building, not involving any increase in area or material change of use.
Phase 2 of Change of Use of Fourth & Fifth Floors of Existing 6 Storey over Basement Office Building to Educational Use.
7-Day Notice - It is proposed to extend the area of the canteen by removing some walls to existing rooms adjacent the canteen and fitting out the new space to create a larger student canteen. It is also...
The construction of Block B comprises 5 no. residential buildings (B1, B2, B3, B4, B5) to contain 170 no. apartment units and part ground floor commercial units. B1 will consist of 7 storeys fronting...
Change of use from retail shop to coffee shop and for signage new window and entrance doorway to shopfront
Permission is sought for the change of use of part ground floor & part basement level from existing telephone call centre use to restaurant/café use.
Change of use from existing office unit to apartment at first floor level at 72-72A Summerhill, Dublin 1
7-Day Notice - Internal material alterations to 3 No. Georgian Houses
Demolition of a single storey cottage and associated structures
The change of use of the existing 3,281 sq.m gross Sackville House from retail/ commercial use at basement and ground floor level and office use at upper floors, to hotel use at basement, ground and...
Proposed fit-out / construction of a new Bank of Ireland Branch at New Century House, Dublin 1.
Demolition of 175/176 North strand road and 115 Seville place and enablement works prior to commencement of granted development
The development will consist of the following; Construction of a 7-9 storey building (with mezzanine) providing c.18,679 sq.m of offices with two entrances to North Wall Quay, retail unit (c.84 sq.m)...
The development will consist of: A temporary scheme of improvement of existing site comprising hard and soft landscaping elements to provide a staff garden with paving, planter boxes, seating and...
Planning Application for the following works at Basement Level:- • Fitting two new sliding sash windows • Installation of new Bathroom. • Installation of new Tea Station • Limited upgrading of electrical...
Retention of existing protected structure facade with construction of new 5 story over double basement hotel with associated conference facilities, cafe, bar and restaurant
Material change of use from previously approved retail use to use as a gymnasium with associated ancillary facilities, to include the fit out of same at ground floor 110-114 Amien's Street, Dublin 1.
Proposed four storey guesthouse building on 4 Mabbot Lane, Dublin 1, linking into rear 76 Gardiner Street Lower, with alterations to ground floor of 76 Gardiner street to facilitate proposed link.
Interior refurbishment fit-out works
5-7 storey over basement level extension to the to the Parliament Hotel incorporating 77 no. additional bedrooms and ancillary hotel facilities including a gym, reception and lounge. Alterations to...
Alterations to Moore Mall South to provide amalgamation of units 82-85 Moore Street, Units 48&49a, Units 49b&50 along with Units 46a, b & c. Alteration of Shopfronts and new glazed canopy to Moore Street.
The development will consist of works to include: - Change of use of unit from former bookmakers to create a new dentist surgery (68sqm); - Alterations to shop front to include new fascia signage...
The project comprises of upgrade of the heating and cooling system in the existing open plan office and meeting rooms, together with all associated builders works on the Second Floor at Fáilte Ireland...
Refurbishment and fit-out of three storey office building for Free Legal Advice Centres Ltd. (FLAC) at 85-86 Upper Dorset Street, Dublin 1
Material Alterations and fit out of the existing retail unit as a Regatta Retail shop.
The forming of a new opening at first Floor Level to provide an interconnection between 6 & 7 Exchange Place, IFSC, Dublin 1.
Enabling works associated with the "Vault C" Fit Out material alteration in CHQ Building. Note: The material alteration works are subject to a FSC and as such these works will be covered under a seperate...
Replacement of insulation, new accessible lift car, lower of lobby floor to accommodate accessible entrance, new reception desk, accessible toilets, general upgrade of building services, partition...
Material alteration in part to existing mixed development at 152-154 Sherriff Street Upper and Castleforbes Road, Dublin 1 for which FSC 2531/07 and FA/08/1631 have previously been granted. The internal...
Fit out of Unit 3, First Floor Food Court, Jervis Shopping Centre, Dublin 1.
Demolition of Former Hales Freight building, City Block 9, Dublin 1. Block 9 is bounded by Mayor Street Upper to the north, North Wall Quay to the south, Castleforbes Road to the west and the "3 Arena"...
Alterations to the building entrance, extending the glazing forward at ground floor adding 41.8sqm of floor space and infilling an existing recessed area at second floor adding 39.2sqm of floor space...
The proposed development comprises of 3no. 2no. bedrooms duplex apartments. To be constructed at the roof level at the existing 3-storey apartment building. This would make the building with a total of...
The works will consist of the installation of a prefabricated CNG (compressed Natural Gas) compressor building complete with covered storage area, fencing and ancillary Ground Works.
The development shall consist of internal reconfiguration of the existing protected structure and three-storey modern extension to facilitate change of use from educational to hotel use. Also the...
Internal upgrade works including new lift cars, upgrade of toilet areas, strip out of internal office partitions on ground, second, third and fourth floors, upgrade of existing atrium and reception areas.
The development will consist of converting the attic, blocking up of one front door, the construction of a bay window to the front of the property and the construction of a dormer window to the rear
Proposed internal refurbishment and infrastructure upgrade works to first floor of existing 5 storey office building at Commerzbank House, Guild Street, Dublin 1.
The fit out works for this project are to the parts of a ground, a first, a second, a third and a fourth floor level only with the fifth & sixth floor already in occupation. Existing Levels first to...
The development will consist of change of use and associated material alteration at the ground floor level of the existing building to accommodate office space for OPW comprising: a public office with...
Enabling works to a Protected Structure, including the removal of all Modern Interventions (namely internal stud partitions, modern sanitary ware, modern pipework and electrical wiring etc).
Works identified in Fire Safety Certificate approval Ref no FA/16/1137 and Disability Access Certificate Ref no DAC /2016/0115 as part of a remodelled entrance from Northumberland Square including the...
Convert existing protected structure in commercial use to residential use, comprising 4No one bed apartments, one on each floor.
Proposed change of use from office to guesthouse use at 76 Gardiner Street Lower, Dublin 1
Permission for development on a site of c.0.11 hectares. The site is bounded generally by Abbey Street Lower to the north; VHI House to the east; Abbey Street Old to the south and no. 24 Abbey Street...
Modifications to first floor bathroom and associated extension at ground floor level to rear of terrace dwelling at No 3 Belvedere Avenue, North Circular Road, Dublin 1
Change of use for the existing Ground Floor unit from retail use, to client facing office use at 42 Amiens Street, Dublin 1
New entrance and canopy glazing to Parnell street and internal partitions for compliance to fire regulations on the change of use.
Single storey extension and change of use of ground floor from banking to retail, alteration to the layout at upper floors to provide apartment accommodation all to No 49 Talbot Street Dublin 1.
Alterations to improve fire safety at 34 Fitzgibbon Street, Dublin 1. Works are as approved under FSC1016/16. Please note that, in the project description section we have selected "change of use" from...
Caffè Nero 9 O'Connell St Lower - Change of use to Cafe and new shopfront
Redevelopment and extension to 2 storey building to provide 11 residential units
Conversion and refurbishment of former food centre to 3 no. resource rooms, 1 no classroom and toilets etc. at Gardiner Street Primary School
Provision of staff canteen at ground floor level in existing hotel
Change of use from retail unit to restaurant use to existing ground floor level unit with associated fitout works.
Part change of use and part extension of existing office building to form hotel
Internal fit out of the existing retail premises over basement, ground and first floors to a new retail coffee shop
Incorporation of two small shop units into the ground floor reception area of the office building at 61 - 64 Marlborough Street. All of the proposed works are minor internal alterations consisting of the...
Conversion of 2 adjacent dwellings (49 & 51) into one residence and conversion of attic space
Council
Nearby
Explore