Swords, Dublin
Conversion of existing attic space comprising of modification of existing roof structure, side dormer with a-style roof c/w window, new access stairs and roof windows to the rear.
Co. Dublin
227 planning applications · 754 site starts · latest 19 Nov 2026
Page 6 of 10 · newest first
Conversion of existing attic space comprising of modification of existing roof structure, side dormer with a-style roof c/w window, new access stairs and roof windows to the rear.
Fit-out of new Boots store at retail area R3005, Terminal 2, Dublin Airport
alterations to existing hip roof to side to create gable roof to meet extended ridgeline to accommodate attic stairs to allow conversion of attic into non habitable storage with new 2 no. roof window to...
Construction of a new dwelling and DWWTS & percolation area
Permission for a single storey domestic extension to side and rear, with pitched roof over side with 2 No. rooflights, and new side entrance pedestrian gate
In Swords
In Swords
Dated since 1 Nov
Newest record date
346 of 981 · then New build, Planning record
Earlier records
Construction of temporary ASD unit and all associated site works at St. Colmcille’s Boys’ National School, Chapel Lane, Swords, Co. Dublin.
A single storey extension to the rear of an existing dwelling house and all associated site works.
single storey extension to side and rear of existing house, new side access gate to side boundary wall to rear of site, attic conversion, raising of gable end to change roof profile with dormer...
Construction of single storey motor showroom and service workshop (building d)
Two prefab Classrooms at Broadmeadow Community National School.
The proposed fit out of existing vacant retail unit to form new Pieta offices and associated clinical services including all required site works necessary to facilitate the development.
Planning Permission for alterations to existing hip roof to side to create gable roof to meet extended ridgeline to accommodate attic stairs to allow conversion of attic into non habitable storage with...
Permission for alterations to existing hipped roof to side to create a Gable roof to accommodate attic stairs to allow conversion of attic into non habitable storage with Dormer to rear and ancillary...
The construction of a new detached 4 bedroom dormer bungalow with the bedrooms located in the roof space, new waste water treatment system, new entrance and driveway to the existing house plus all...
The construction of a new single storey extension to the side/rear of existing dwelling, including minor internal modifications and all associated site works.
Single storey warehouse/light industrial unit & all associated ancillary site development works including drainage and utilities necessary to facilitate the development.
The construction of 37 houses on lands at Mooretown, Swords, Co. Dublin: Nos. 3 to 14 (cont) Cronan's Well Gate, Nos. 1 to 23 (odd) Cronan's Well Grove, Nos. 2 to 10 (even) Cronan's Well Grove, Nos. 1 to...
Material alteration to the internal ground floor layout of Unit D3
the construction of a single storey rear extension, 2 No rooflights to the front and the installation of a new packaged waste water treatment system with polishing filter / percolation area.
Development will consist of a proposed new extension to the side of the existing house with 2No. new Velux’s to the front of the proposed roof & 1No. dormer roof to the rear. 2No. new dormer roofs to the...
Extensions and Renovations to the existing dormer bungalow. Works to include part demolition consisting of the removal of single storey structures to the rear and replaced with an extended single storey...
Conversion of attic space to non- habitable space. The conversion requires change of roof from hipped roof to gable roof and dormer to back and all associated site works.
80 Boroimhe Alder, Swords, Co. Dublin. - Conversion of existing attic to bedroom, with dormer extension to side & to rear and associated site works.
Internal re-fit of existing H&M Store
Material alterations comprising the fit out of McCartans Pharmacy at Unit 3 Millers Square, Block 1, Millers Glen, Swords, Co. Dublin.
Permission for extension to gable end of existing dwelling with first floor extension over.
conversion of existing attic space to storage area with new revised roof profile (from hipped to gable end) to side/rear, a rear flat- roofed box dormer with window, internal modifications and associated...
Modification to food & beverage unit R3004 at Terminal 2, Dublin Airport
Permission for the construction of a new attic conversion with Dormer window to the rear of the existing two storey semi-detached dwelling and to include ancillary works.
Single storey garden room extension to rear of existing dwelling (32m2), single storey extension to side of existing dwelling and garage (18m2) and part conversion of existing garage into a home office...
Proposed fire safety works internal material alterations to existing pre- school creche childcare facility ground level shopping centre unit
Material alteration to the internal ground floor layout of Unit D3.
Conversion of the existing attic space to storage area incorporating 1 no. dormer to the side and rear of the dwelling at 15 Laurelton, Swords, Dublin
Proposed 1st floor extension to rear
Change of use from existing residential to Community Health Clinic with ancillary offices. The Community Health Clinic development consists of internal alterations to the existing ground floor including...
Construction of a single storey extension to the side and rear of the existing house and associated site works
Change of roof from hipped to half hipped for new dormer extension to rear, new window to side, 2 velux rooflights to front and for attic storage and en-suite
Attic conversion with dormer window to rear, remove existing hipped roof and build up straight gable wall at side, with new window at side at attic level and associated site works
Construction of dormer at 86 Glasmore Park
Conversion of existing attic space comprising of modification of existing roof structure, side dormer with A-style roof complete with window, new access stairs, flat roof dormer to the rear and...
Change of use of existing office space to healthcare use, including refurbishment and installation of mechanical equipment at roof level.
Garage conversion with single storey extensions to side and rear and single storey connection to main dwelling
the construction of a single storey flat roof extension to the rear of the property. removal of existing hipped roof to existing single storey return of adjoining family flat and replaced with flat roof...
A Single Storey Extension to the side and rear of dwelling with a roof light.
Block A at Nevinstown, Swords, Co. Dublin is an existing four storey Mixed Use Development building (see previously approved FSC (FSC 877/07, FSC 571/08 & FSC 178/09)) containing 2 no. bars / restaurants...
Alterations of the existing hipped roof to extend the existing ridge line, and create a gable wall to the side elevation, and construction of a roof dormer to the rear slope and all associated site...
Renovation of existing bungalow with 3 dormer bedrooms and extension of 30 sqm to the side.
Single Storey extension to side and rear of existing dwelling
New gable wall to side, extension of roof and new dormer to rear
Single story extension to side, pedestrian access gate rear garden.
Change Roof Ridge and convert attic space to study/play room with dormer roof to rear.
Construction of a single storey front porch to the existing detached dwelling and partial rendering of the front facade and all associated site works.
Landlord works for change of use of the first floor toilet area from public toilets to lettable unit prior to tenant fit-out
Installation of Photovoltaic panels on the roof of the church
Material alterations/ fit out at Ground Floor and First Floor of unit G49 (former KFC) at Swords Pavillions for Krispy Kreme.
Extension to the rear of existing dwelling.
The works include minor amendments to the façade, internal demolitions and remodelling, installation of an internal platform lift and gantry, and all associated works.
Change in existing roof Ridgeline to extend new built up gable wall to side elevation and conversion of attic space to new study, with dormer window and vellum to the rear
New single storey extension to the side and rear of existing dwelling to include a new side extension measuring 21 sq M with new window opes to the east and west elevations, hipped roof and 2 no. velux
change existing roof ridge line to extend to new built-up gable wall and conversion of attic space to new study/playroom with dormer roof to rear
Attic Conversion with dormer window to side and associated site works
Proposed new 51sqmt. extension adjacent to the existing Mall Entrance located to the south east of the existing shopping centre and the relocation of the existing entrance door to the Medical Centre /...
Single storey extension to front, rear and gable end of house for use as ancillary accommodation for family members.
Partial demolition of single storey rear extension and single storey garage to the side, the construction of two storey extension to the side of existing dwelling, a single storey extension across the...
Single story extension to front and side of end -of- terrace house
Construction of Phase 1 a a new three storey post-primary school building comprising of 34 General / specialist classrooms, GP Hall, staff Room, and Ancillary accommodation across the three floors...
Conversion of existing garage to living accommodation; new pitched roof to replace the existing flat roof; internal reconfiguration and all associated site works
Construction of a part two-storey, part bungalow style dwelling at Deanestown, Balheary, Swords, Co. Dublin
Single storey extension and alterations to existing detached dwelling together with associated site works
conversion of existing workshop into creche/childcare facility
Demolition of shed in rear garden and to build a new shed comprising home office, storage & studio and associated site works
Single storey extension to the side of existing house with associated site works.
Temporary primary school accommodation comprising of 2 No. prefabricated buildings (B1 c 282 Sq. Mtrs & B2 c 182 Sq. Mtrs) at 85/87 Main Street, Swords, Co. Dublin
Internal fit out alterations and material alterations to the existing shell & core unit as a coffee shop, indicated on the drawings.
Construction of 30sqm extension to the existing dwelling.
The reconfiguration and extension of a coldtore facility in addition to alterations to the facade of a warehouse, new screen fencing and ancillary site works at Unit B1, Horizon Logistics Park...
Internal Fitout of existing building to form office / meeting rooms and all other ancillary accommodation.
Demolition of an exisitng chimney and construction of a single storey C.47.5m2 GFA extension to the rear at 9 Elmwood Drive, Swords, Co Dublin
Construction of a 20sqm single storey extension to the rear of the existing dwelling together with associated works.
2 storey extension to rear with single storey annex incorporating dining and family room at ground floor and bedroom with en-suite at first floor
New attic conversion with dormer extension to rear, as home office and storage, together with new gable wall and extended roof.
Attic conversion to storage with Dormer extension & window to side & 3 Nr. Rooflights to rear
Construction of 125 No. houses and associated site works at Rowlestown, Church Road & Rowlestown Drive, Rowlestown East, Co. Dublin
Alterations to previously granted application reference No. F18B/0220 alterations consisting of two storey extension to front side and rear allowing for additional bedrooms and enlargement of front...
7 day Notice Fire Certificate Application for Change of use from current Retail to Financial Services Institution for KBC Ireland PLC at Unit G17, Ground Floor, The Pavilions Shopping Centre, Malahide...
Attic conversion with two number dormer windows, one on each roof plane, one number circular window on front elevation at attic level.To raise roof ridge line by 300 mm to create two number bedrooms and...
Alterations to the existing two storey semi-detached dwelling: (i) ground floor extension to rear with lean to roof (ii) removal of existing hipped roof to single storey playroom/utility to accommodate a...
Unit D7 Horizon Logistics Park, Harristown, St. Margaret's, Swords, Co. Dublin. Development Consisting of the Construction of a Pump House
Provision of 4no. single storey temporary prefabricated classrooms with a total floor area of approx. 224m2 adjacent to existing school building with associated site works.
Permission for new ground floor extension to rear with internal modifications and associated site works.
Sunroom extension
To construct a first floor level extension to the existing dwelling consisting of a raised ridge line, alterations to the front, side and rear elevations, including new first floor level rear windows...
Development will consist of a new ground floor only extension to the front of the existing house and a proposed ground floor only extension to the rear of the existing house and all ancillary works.
Single storey extension to the front and side of house including an entrance porch.
(a) proposed single storey extension to existing single storey sunroom at rear with roof window (6.5m2 increase) (b) proposed replacement single storey porch and new single storey office room to side of...
Single storey extension to side of existing dwelling incorporating new bedroom, wheelchair access WC and utility.
Permission for development of a two storey rear extension with attic conversion and all associated site works
ESB Standard twin feed radial sub station and adjoining client switchroom for augmented power supply, all to standard ESB details and finishes, at the SK biotek Ireland facility in Swords, Co. Dublin
Attic conversion comprising of velux window to front of dwelling measuring 1140mm wide 1180mm long and a flat roof dormer to the rear of dwelling measuring 3metres wide
Construction of single story extension to the rear
Council
Nearby
Explore