Tullamore, Offaly
Construction of new dwelling house waste water treatment system and all ancillary site works
Co. Offaly
124 planning applications · 502 site starts · latest 16 Nov 2026
Page 6 of 7 · newest first
Construction of new dwelling house waste water treatment system and all ancillary site works
Fitzgerald A & S: 2 Storey House & Garage
Spollen J: Two storey dwelling, Garage, Effluent Treatment System, Percolation Area, Ancillary Services, Vehicular Entrance and all associated works at Ballynamire, Tullamore.
Demolition of existing extension & outbuilding and construction of single storey extensions to south- east and south-west and widening of site entrance & associated siteworks (HS Ref. 7684)
Changes to the building design of already granted permission for new Child Care Facility
In Tullamore
In Tullamore
Dated since 1 Nov
Newest record date
264 of 626 · then Extension, One-off house
Earlier records
The construction of a new four bedroom detached two storey dwelling house, with separate detached garage, septic tank, percolation area and all associated site works and services including access onto...
Refurbishment and alterations to existing bedrooms and ancillary facilities including utility room, treatment room and nurse base including drainage.
The material alterations to existing first floor apartments and all associated site works at Hacketts Flats, Market Square, Tullamore, Co Offaly.
The construction of 1 number two storey four bedroom dwelling house, Domestic Garage, Effluent Treatment System and All associated site development works
Demolish existing dwelling & outbuildings, construction of two- storey dwelling & attached domestic garage, widening existing site entrance and all associated siteworks at An Grianan, Charleville Road...
The construction of a new single storey pallet store to the east side of the existing industrial building and all associated site development works. The works are proposed on a site which is a seveso...
Fit-out of remainder of ground floor of Unit 28 to create two new classrooms at Unit 28, Axis Business Park, Clara Road, Ballyduff, Tullamore, Co. Offaly.
Change of use from Gym to a Place of Worship
'OPT OUT' The construction of a single storey dwelling house, garage, entrance and all associated site works at Knockowen Road, Tullamore, Co Offaly.
Brophy Paul & Collette: Reconstruction & Extension to house at Ardan, Tullamore
'OPT OUT' The construction of a single storey extension to the rear of existing dwelling, alterations to existing dwelling and all associated site works.
Pryiaanabelle: Change of use from industrial building to children's play centre, Unit 26J Axis Business Park, Clara Road, Tullamore.
Construction of a clad structural steel framed portalised cooperage building built on an existing concrete slab
Revisions to the previously approved permissions (ref: pl2/14/26 & pl2/16/41), the revisions will consist of an increase of 44 sqm to the overall floor area to beiter accommodate the requirements of part...
Construction of a House, Domestic Garage, Septic Tank, Percolation area, Entrance & associated site works at Ashfield, Tullamore, Co. Offaly
Spollen J 22A: Two storey dwelling house and all ancillary services.
Construction of extension to the rear and side of existing house at Ground, First and Second floor level, also construction of domestic garage.
Extension to the side (west) of existing shop unit comprising storage area.
Three bedroom bungalow with septic tank and effluent treatment system and percolation area at Ballycosney, Ballydaly, Tullamore, Co. Offaly
Spollen J 22B: Two storey dwelling house and all ancillary services
Churchview Motors: provide additional drainage for extended car parking area, and extend workshop incorporating staff canteen on ground and 1st floor, with stair access and extended parts store on ground...
New Grocery Shop Fit-out Works, The Central Hotel Retail Unit, Main Street, Tullamore, Co. Offaly.
Refurbishment of existing dwelling including construction of new storey and half extension to side and rear; demolition of existing shed and construction of new shed; decommission to existing septic tank...
Refurbishment and alterations to existing bedroom accomodation and ancillary facilities including new ensuites and associated drainage.
The construction of a new industrial building and link corridor to the exisitng facility. The new building will contain a new e-beam sterilisation unit and an adjoining two storey laboratory building...
Change of use from retail unit to banking hall and offices. Including internal alterations, external alterations and the erection of signage to the exterior.
Howell S & Feighery Ciara: 2 Storey house, new entrance, proprietary effluent treatment system with raised percolation area, connection to local Group Water Scheme, Domestic Garage & all Assoc. site works.
Ross T & G: Extend house into rear outbuilding, fit roof window, remove chimney to rear. Reconstruct & renovate interior, repairs to concrete steps. This is a protected structure. High St., Tullamore.
Change of use of existing offices to café, alterations / refurbishment of existing shopfront, new signage and all associated site development works
Extension to dwelling (by 31m2) at 90 Arden View, Tullamore
Spollen James Ltd., Two Storey House at 23 Clonminch Avenue, Tullamore.
The development will consist of the demolition of existing sheds and the construction of a new part two-storey, part single-storey extension to the rear and side of the existing dwelling house. The works...
Demolition of Existing School Buildings and Construction of New part 2 storey and part single Storey School Buildings, together with Associated Site Works Phase 2: Site works only, consisting of Parking...
New loading bay and ramp and associated works
Opt out for the refurbishment of the existing house & outbuildings & the demolition of an existing lean to single story extension of 14.64m2 to the rear of the existing house along with the construction...
Extension to dwelling (by 31m2) at 188 Arden View, Tullamore
First floor residential area change of use to apartment & guest rooms
Change of use of remainder of ground floor of Unit 28 to provide additional area to existing Pre- school child care facility and for associated site works including alterations to existing elevations and...
Construction of 1 no. Two storey type dwelling, domestic garage, connection into existing foul sewer line and all associated site works
Construction of New Grain Distillery Building and Ancillary Offices, Laboratory And Staff Rest Area.
Construction of a single storey dwelling house, septic tank and effluent treatment system and associated site works
Erection of single storey dwelling house at Bracklin Big, Tullamore
Two-storey dwelling, domestic garage & wastewater treatment system, percolation area and associated siteworks at Ballynacanty, Blueball.
Extension to slatted cubicle shed to include underground slatted slurry storage and calving boxes, cattle holding/drafting facility, extension to silage slab/base and associated site works. The proposed...
Construction of 1 no. Two storey dwelling, domestic garage, approved sewage treatment system and percolation area, all adjacent to protected structure reference: 24-004 (the beeches). Permission is also...
construction of slatted cattle shed with lieback area
Construction of 3 no. retail units, 21 no. apartments, ESB sub-station, switch room, all over basement car park and all associated site works
Construction of a new extension to north elevation of existing joinery manufacturing building, revised car parking layout and all associated site development works
Gallagher Enda, Whelan Amy: Dwelling house, Garage, Entrance, ETS and all ancillary works at Ballycosney, Ballydaly, Tullamore.
Construction of one number two storey type dwelling, garage, new entrance onto public road, connection into existing foul sewer and all associated site works
Change of use of existing unoccupied building from a creche to a resource centre at ground floor level including completion of all site development works at Eiscir Meadows, Arden, Tullamore, Co. Offaly.
Fit out of vacant shell at 1 Church Street, Tullamore
The construction of a single storey extension to the rear/side of existing dwelling and all associated site works.
To demolish and reconstruct existing building and for change of use from storage to Funeral Home at the rear of the Premises at Harbour Street, Tullamore, Co Offaly
Alterations and refurbishment of Unit 8 (A, B & C), Burlington Business Park, Sragh Avenue, Tullamore, Co. Offaly. Unit A: removal of internal walls and construction of new dock levellers and roller...
Construction of an extension to the rear and side of existing dwelling at 42 Droim Liath, Collins Lane, Tullamore, Co. Offaly by 14.7 sq m
The construction of a single storey 13.6 sq.m granny flat extension to the side of the existing house, addition of one roof window to the front elevation, moving the existing side door to the existing...
Two storey dwelling, domestic garage, installation of proprietary treatment system and all associated works
Storey and a half/two storey dwelling, domestic garage an proprietary treatment system and all associated works
Kitchen Extension to side of house at Screggan, Tullamore.
Extension & renovation of existing dwelling
New detached domestic garage at Ballycowan, Tullamore, Co. Offaly
Constructions of a two storey dwelling house, effluent treatment system and all associated site works.
Single storey extension to the rear of existing house - OPT OUT
1 number two storey four bedroom dwelling house, carport, garage, effluent treatment system and all associated site development works
A traditional two story with hip roof, two bay windows and adjacent sun room.
A new extension to the side of the existing school and upgrade of the existing septic tank and all associated site works
One new two bed apartment to be developed in the open yard section of the property and will incorporate the existing storage building. Re- configuration of the existing building, which currently includes...
A single storey extension to the rear [east] of Tullamore MRH, Offaly, to include an MRI facility with associated reception, waiting area and support rooms, 3no. ultrasound rooms, associated waiting area...
Construction of a new café for sale of hot drinks for sale on and off site (Circa 200Sq.m.), outdoor seating area with umbrella awning over, awnings to front windows, revisions to existing car parking...
The construction of a two-storey dwelling and storage shed/car port structure, with associated siteworks including a proposed site entrance.
Demolition of an existing house on the site, and construction of a single-storey veterinary practice and associated siteworks and roadworks, including a proposed site entrance.
Construction of a part two-storey, part three-storey Primary Care Center with a ground floor area of approximately 4,120 sqm. Including three GP surgeries at ground floor level; own-door café; HSE...
Construction of new Service Station Retail Building
Construction of a single storey extension to the rear/south of the existing school building which will comprise of 2no. new classrooms, resource room and office, together with internal alterations to...
Construction of a two storey dwelling, garage, septic tank treatment system, percolation area, new entrance, driveway and all associated site development works
The erection of a new dormer style dwelling house with connection to a new septic tank and percolation area, and the erection of a new separate domestic garage
The construction of a dwelling house, a garage, a wastewater treatment system and associated site works including a proposed site entrance @ ballycowan, tullamore, Co. Offaly
Detached two storey dwelling, detached garage, new entrance to public road, septic tank and polishing filter, and all associated site works
Partial demolition of existing residence, construction of new part one, part two storey extensions to front, side and rear of the existing property, provision of new detached garage and storage structure...
(a) The Demolition/Removal of all existing Prefabricated Structures on the school site (b) The Demolition of Existing Storage Areas and Bicycle Sheds (c) The relocation of the Existing Foul Pumping...
The development will be an industrial facility for the recovery of energy from biomass and waste.
Design change to dormer dwelling house and change location of entrance, previously granted permission under planning reference pl2/08/400 and extension of planning permission reference ex/13/001
Dwelling house and connection to public services at Tullamore Urban Council Site 12, Cloncollig, Tullamore
Alterations to 2no. existing dwelling houses and all associated site development works. Works to comprise of internal refurbishments and the construction of extensions to rear of both dwellings. Site...
Change of use from dwelling house to office with alterations to front entrance at Bridge Lane, off Bridge St., Tullamore.
Building 10, Distillery Bottling Hall and associated site development works.
2 Storey house and all ancillary services
A wind farm service building incorporating machine servicing, workshop, storage and staff facilities, together with offices, reception area and a multi-purpose meeting and presentation room. The...
Alterations To Existing Industrial Units Comprising Of New Cladding And Windows To The Front And Side Elevations, New 2 Storey Glazed Extension And Entrance Foyer To South / West Corner Of Existing...
Construction of a single storey place of worship with adjoining apartment and external signage, car-parking and a new entrance road
Construction of a 2 storey dwelling, garage, septic tank, water treatment system and all associated site works.
Extension to Gaelscoil an Eiscir Riada to include 2no. SET Rooms, upgrade to Heating System and Rainwater Harvesting System
Opt Out - Single storey extension to the front and side of house, comprising a new accesible bathroom of 7.5m2, entrance porch of 4.25m2, along with all associated site works at 165 Arden View...
New Extension to existing Dwelling House at no. 1 Park Avenue, Tullamore, Co. Offaly
Council
Nearby
Explore