Tullamore, Offaly
Construction of 34 Dwellings, consisitng of 23 Bungalows and 11 no dormer bungalows, together with associated site work at Sites 1-12 The Avenue, 1-18 the Green and 1-4 The Way, at site to be know as The...
Co. Offaly
124 planning applications · 502 site starts · latest 16 Nov 2026
Page 5 of 7 · newest first
Construction of 34 Dwellings, consisitng of 23 Bungalows and 11 no dormer bungalows, together with associated site work at Sites 1-12 The Avenue, 1-18 the Green and 1-4 The Way, at site to be know as The...
Proposed 18No. unit housing development including Civils & Site Works at Chancery Lane, Tullamore, Co. Offaly
The works involved the construction of a new extension to the existing facility.
Construction of a single storey dwelling house, detached garage, installation of an effluent treatment system/ polishing filter and any associated site works
Construction of a single storey extension to the rear of the existing dwelling, internal alterations to rooms at ground floor level.
In Tullamore
In Tullamore
Dated since 1 Nov
Newest record date
264 of 626 · then Extension, One-off house
Earlier records
A residential development on a 0.93ha site (2.3 acre) which is bounded by the r443 srah road to the northeast, the l2007 rahan road to the northwest side, the existing railway line to the south west and...
Construction of one number detached two storey dwelling, one number detached single storey garage, to install septic tank and percolation area, to connect to public watermain, to upgrade and alter...
To carry out upgrade works on condition of fire cert FSC 20-05 required to Marian Hostel Tullamore Co. Offaly
The development will consist of a) change of use of existing unit (72m2) from retail to Class 2 Financial Services, b) replacement of existing shopfront and c) new external signage, at Unit 24, The...
Gleeson B, Kenna M: Reconstruction and extension to house at Mucklagh
Extension to House at no. 8 Grand Canal Court, Daingean Rd, Tullamore, Co. Offaly.
Construction of a ground floor and a first floor extension to existing dwelling, a new garage, connect into existing foul sewer on site and all associated site works. Permission is also sought to alter...
The development will consist of (i) Extension of existing E-Building to cover footprint of yard in front of existing E-Building, and associated site works. Floor area of proposed extension = 870sq.m...
Two-storey dwelling, septic tank & percolation area, bored well and site entrance (HS Ref. 7857)
Construction of 66 No. dwellings (56 No 2 storey and 10 no 2.5 storey dwellings), together with associated site works at 5-26 The Way, 1-32 The Park, 1-10 The Crescent & 1 & 2 The View at a site to be...
The erection of a new storey and a half style dwelling with connection to a new septic tank and percolation area
single storey extension adjoining the rear of the existing school, the extension will include 4 No. classrooms, 2 Special needs spaces, ancillary stores and toilet provision. The extension will include...
Ardan Water Treatment Plant Building
The Construction of a new Dormer style dwelling, new garage, new entrance, new septic tank and percolation area including all associated site works.
Construction of a two-storey dwelling, site entrance and associated siteworks (HS Ref 7668)
Construction of 2 no. Industr ial/warehousin g buildings and associated accommodation, car-parking and all ancillary site works
Fit out of GP room 2 and all associated anciilary site work.
The demolition of an existing single storey sun room and the provision of a single storey new sun room extension with ancillary works
Change of use of existing shop and offices and internal alterations
Material alteration to existing rooms to accommodate an end of life suite, MRH Tullamore.
Construction of new domestic dwelling.
A single storey dwelling house, septic tank, percolation area connection to group water scheme and all associated site development works
Buggy C, Leonard M: 2 storey house, garage, secondary effluent treatment system and polishing filter and all ancillary site works and services at Curraghmeelagh, Blueball, Tullamore, Co. Offaly.
new one story extension to the existing cask quality station building with associated ancillary works.
Two storey extension to side of existing dwelling house and all associated site works
Construction of a four bedroom dwelling with garage. The application will also include a new treatment unit with percolation area, entrance and all associated site works and drainage
Construction of a new detached 3 bedroom bungalow, onsite wastewater treatment system and construction of domestic garage.
Boyle G & J: Demolition of existinghouse, construction of new two storey house and reconstruction of existing domestic garage & all associated services at Clara Road, Srah, Tullamore.
O'Connor Douglas: Change of use of ground floor from shop to Restaurant / Cafe and all ancillary works. This is within the curtilage of a protected structure at Bridge Street & Distillery Lane...
Construction of a dwelling house, garage, installation of sewerage treatment tank with percolation area and all associated site works
Opt Out - Two storey Extension to rear of house, conversion of attic to living accommodation and fitting of velux windows to front of house
Construction of a two storey dwelling house, connection to existing estate foul and storm drainage and all associated site works
Demolishing the existing small single storey extension to the rear of the house and construct a new single storey extension to the rear of the house
Alterations and extension to existing house including increasing pitch of roof and all ancillary site works
Single storey extension to side of existing dwelling at 15 The Grove Hophill, Tullamore, Offaly
Alterations and extension to existing creche/pre school building to include attic/roof conversion consisting of classroom, office, toilets, stairwell and landing, external fire escape and associated...
Smollen Padraig & Veronica: Revision to front elevation, reduce size of window opes, fit new windows, nap plaster finish to front elevation, break out ope and fit new window in east facing gable at 20...
Construction of a new 4 bedroom detached single storey dwelling house, garage, sewerage treatment system, percolation area and all associated site works and services including access onto the existing...
Alterations and Extension to the rear of existing child care facility to allow for relocated toilets and extended classrooms
Construction of an extension. The proposed ground floor extension is to the rear of existing dwelling. The application will also include all associated site-works
Grennan K: Change of plan from previously approved permission under file ref PL2/18/23 for dwelling house incorporating re- position of house and garage on site, revisions to front elevation and minor...
Construction of dwelling house with treatment system and percolation area with all ancillary site works
Construction of a domestic garage
Development of a single storey dwelling, domestic garage, on site waste-water treatment system, percolation area, site entrance and all associated ancillary site works
Dolan S & J: Two storey house, effluent treatment system and all ancillary services at Ballard, Tullamore, Co. Offaly.
Construction of a new 2 storey dwelling house along with connection to a new effluent treatment system and percolation area and the construction of a new garage along with associated site works
Extension and renovation and associated siteworks to existing dwelling at 45 Glendaniel, Tullamore (HS Ref. 7782)
Kearney P M: The Construction of a two storey house, detached garage, effluent treatment system, percolation area and all associated site works at Ballycowan, Tullamore, Co. offaly.
Condron O Farrell C: A New House, Garage, Packaged Waste Water Treatment System and Polishing filter and all ancillary site works and services at Hollimshill, Blueball, Tullamore, Co. Offaly.
The erection of a new storey and a half style dwelling with connection to a new effluent waste water treatment system and polishing filter and the erection of a separate garage at Clonagh East...
Erection of new bungalow-style dwelling with connection to a new effluent waste water treatment system and polishing filter and erection of a separate garage at Clonagh East, Tullamore Co Offaly
Construction of single storey dwelling house, garage, septic tank/effluent treatment system and all ancillary works and services at colehill, tullamore, Co. Offaly.
Single storey extensions to the north-west & north- east, the addition of rooflights, the removal of an existing chimney plus adjustments to the existing porch with associated internal modifications &...
Alterations & refurbishment of existing 2 storey building including construction of ground floor extension to the rear & change of use of exist residential accommodation at first floor level to...
Works to construct new floors in 2 no. existing industrial units - 25E & 26E, Axis Business park, Tullamore, Co. Offaly
Alterations and refurbishment of existing warehouse unit for use as an archive storage facility. the works will also include internal alterations and first floor extended areas with all ancillary works...
Domestic Garage at Clonminch, Tullamore (HS Ref. 7739)
Construction of a retail foodstore with ancillary off-license area. Ground floor is retail, welfare & storage with 1st floor plant area.
Opt Out - dwelling house, garage, Effluent treatment system and ancillary site works
Construction of single storey detached dwelling including all associated site development works (HS Ref 7751)
a development which will consist of a 15.0m x 10.0m x 5.0m high storage unit (150m2) with an adjacent 7.5m x 4.5m x 3.0m high forklift charging station (34m2) with a concrete storage slab (650m2) and...
Construction of new dwelling house, shed, installation of sewerage treatment system with percolation area, site access road and all associated site works
A) Retention for the conversion of attic space to Living accommodation to the existing dwelling, B) Permission for the construction of a Granny flat to the side and rear of the existing dwelling and all...
To providing 1 no. additional classroom with Accessible W.C. to the existing Special Needs School. Additional works comprise of the removal of existing roller shutter and replace with new door and screen...
Construction of a new dwelling house, domestic garage, septic tank, percolation area, entrance and associated siteworks at Meelaghans, Tullamore, Co. Offaly.
Demolition of existing rear extension and replacement with new rear extension of less than 40sq.m in area
Dwelling house shed/fuel store septic tank/ETS percolation area and associated site works
The development consists of the fit out and internal development works to an existing retail unit. The ground floor will provide test rooms, consulting rooms, office space and staff facilities. The area...
New PE Hall and Alterations to Existing PE Hall at Sacred Heart School, Tullamore
Reynolds Ciaran: Dwelling house, Garage, Effluent Treatment system & all ancillaries at Ballinamere, Tullamore, Co. Offaly.
Construction of dwelling house domestic garage/fuel store bored well septic tank percolation area and associated site works
Brophy Anne: Single storey house, gge, ets at Cappancur, Tullamore
Construction of a new attic c onversion/exte nsion to existing dwelling house and all associated siteworks and services
Construction of a two-storey detached 4 bed dwelling and associated site development works at Droim Liath (HS Ref. 7797)
The development will consist of the construction of new dwelling house, shed, installation of septic tank with percolation area, site access road and all associated site works.
Proposed new single storey house and all ancillary site work at knockowen road, tullamore, Co. Offaly
Extension to the restaurant entrance area and modifications to stall risers and glazing along East and South facing facades. Alterations also include cladding over existing roof with composite aluminium...
Change of use of bank premises to licensed including and extension to the rear at Woodchester House, O'Connor Square, Tullamore
The Erection of a new Bungalow dwelling with connection to a new Septic Tank and Percolation Area and the Erection of a Separate Domestic Garage at Cloonagh West, Tullamore, Co. Offaly
Proposed new Detached Garage
Erection of wooden eco cabin at rear of house
Refurbishment of an existing property and ground floor extension to the rear of the property. To include installation of septic tank and percolation area.
Moore R & M: Dwelling house, Shed, septic tank, percolation area and entrance
The construction of a dwellinghouse, septic tank and percolation area, domestic garage and associatd site works
'Opt Out' Storage Shed & 3 Automatic Security Barriers & all associated site works at Church Avenue, Tullamore, Co Offaly.
Construction Of A Two Storey Dwelling House With Associated Treatment System And Percolation Area, Construction Of A Detached Garage/Fuel Store, And all associated Site Works
Construction of 1 no. Two storey type dwelling with garage, connect into existing foul sewer line, demolish existing sheds & derelict building & all associated site works
'Opt Out' Two Storey House, septic tank, percolation area and all associated site works @ Glaskill, Screggan, Tullamore, Co Offaly
The demolition of an existing 2 storey house with detached 2 storey garage and the construction of a replacement 2 Storey dwelling with detached 2 storey garage with new wastewater treatment plant with...
Propose to erect a dormer bungalow in concrete blockwork, standard roof tiles associated site works, wastewater treatment unit and percolation area and entrance area at Ross Road, Ross & Clonterlough...
alterations / refurbishment of existing Second floor, Unit 5, offices with new partitions dividing the office open space in to separate offices and new canteen Grand Canal House, Columcille Street...
Construction of new 4 bedroom detached dormer house, with separate garage, sewage treatment works and percolation area, and all associated works
Kelly M, O Brien Tadhg: Erection of new single storey extension and renovation of existing dwelling at 'Smaointe', Puttaghaun, Tullamore, Co. Offaly.
Change of use of existing offices to convenience store with deli counter, ancillary storage, toilet accommodation, kitchen and seating at first floor level, alterations / refurbishment of existing...
Construction of dwelling house, domestic garage and septic tank/effluent treatment system
Council
Nearby
Explore