Material-Alteration / PB-71317745835449130
Dublin 2, Dublin - Commencement Notice
Office fit out works
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Board preview from filters / 05 Oct 2026
This board preview uses server-side filters and a 25-row cap. Use the inline board packet preview on Project Leads for the canonical shown-card export.
Document-verified details: 0 of 7 leads. Preview and PDF use the same structured planning-document fields.
Board trail
Browser-local board history for repeat review. Saved links keep the current filter shape.
No recent boards on this browser yet.
Board basis
Board PDF includes a board receipt, decision register, source trail, lead rows and source-rule footer. Estimated construction values are our estimates from floor area or stated homes and the project type, using rates from published Irish construction cost guides, January 2026. They cover building works only and are not stated figures.
Material-Alteration / PB-71317745835449130
Office fit out works
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-20249710414216382
The demolition of the existing single storey side garage structure and the existing part single, part two storey lean to structure to the rear of the existing dwelling and the construction of a new part single, part two storey side and rear extension, conversion of the existing attic level to inc...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-14030404097214514
The demolition of the existing front and rear extensions and the construction of a single-storey flat-roofed front extension and a single-storey pitched-roof rear extension and ancillary works at No. 37 Lambay Road, Drumcondra, .
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Extension / PB-12244583309861948
The demolition of the conservatory and external WC outbuilding and the construction of a single storey extension all to the rear of the existing 3 storey terraced dwelling. The proposed work also includes: the provision of a new dormer window to the rear of the existing pitched roof, existing roo...
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Material-Alteration / PB-5769308729090356
Material alteration to existing B1 level of the Printing House Square building to provide for workshop facilities for Trinity College Dublin.
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Material-Alteration / PB-68534259966157546
Material alterations and internal modifications to an existing single-storey drive-thru restaurant at McDonald's, Artane Castle Shopping Centre, Kilmore Road, Dublin 5, .
Why included: Start-stage cue. Check site activity, appointment cues and programme timing.
Appeal/FI / PB--2133192691
The demolition of an unused derelict building and the construction of a new three-story apartment building. The proposed layout includes: Two studios at ground floor and one two-bed apartment on the first and second floors. Each apartment will be provided with bicycle and refuse storage. The main...
Why included: Appeal cue. Review parties, decision path and timing before outreach.