Board preview from filters / 05 Oct 2026

Board preview from Project Leads filters.

This board preview uses server-side filters and a 25-row cap. Use the inline board packet preview on Project Leads for the canonical shown-card export.

Matching records77after active filters
Sample rows25maximum 25 per filter sample
Councils represented1Dublin City Council
Counties represented1Dublin

Document-verified details: 0 of 25 leads. Preview and PDF use the same structured planning-document fields.

Board trail

Recent boards

Browser-local board history for repeat review. Saved links keep the current filter shape.

No recent boards on this browser yet.

Board basis

AuthorityDublin City CouncilValueEUR 30m+
Dublin City Council / EUR 30m+ lead board

Board PDF includes a board receipt, decision register, source trail, lead rows and source-rule footer. Estimated construction values are our estimates from floor area or stated homes and the project type, using rates from published Irish construction cost guides, January 2026. They cover building works only and are not stated figures.

01 board

Protected structure / PB--2041580940

~511 dwellings, A site which previously formed part of the overall RTE Campus at... - Planning Application WEBLRD9014/26-S3a

Cairn Homes Montrose Limited intendsto apply for Permission for a Large-Scale Residential Development (LRD) at this site, which previously formed part of the overall RTÉ Campus at Montrose, Donnybrook, Dublin 4. The site is located within the Simmonscourt Townland. The site is bounded by the Stil...

A site which previously formed part of the overall RTE Campus at Montrose, Donnybrook, Dublin 4, Dublin Dublin City Council New Application / 2026-09-25

Why included: Matches the active board filters and is ranked by newest date plus PlanningBrief score.

Est. construction value€110m to €160mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor511 units / floor unknown (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: yesdocument: check
02 board

Protected structure / PB--2021382355

~120 dwellings, Lands at 23-28 Prussia Street, Dublin 7 (D07 X9X6, D07 FW30 &... - Planning Application WEBLRD9021/26-S3

PROTECTED STRUCTURE: We, Randalswood Construction Ltd., intend to apply for permission for development on lands at 23-28 Prussia Street, Dublin 7 (D07 X9X6, D07 FW30 & D07 PAF1), (located at the junction of Prussia Street and St. Joseph's Road, and bounded by No. 29 Prussia Street (Protected Stru...

Lands at 23-28 Prussia Street, Dublin 7 (D07 X9X6, D07 FW30 & D07 PAF1), (located at the junction of Prussia Street and St. Joseph’s Road, Dublin Dublin City Council New Application / 2026-09-21

Why included: Matches the active board filters and is ranked by newest date plus PlanningBrief score.

Est. construction value€26m to €38mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor120 units / floor unknown (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: yesdocument: check
03 board

New-Building-Material-Alteration-Material-Change-Of-Use / PB-15138075972923887

Dublin 8, Dublin - Commencement Notice ABP-310567-21, LRD6042/23-S3A, LRD6074/24-S3, LRD6080/25-S3A, LRD9007/26-S3 - Revision 1, LRD9008/26-S3 - Revision 2.

Construction of a mixed use residential and commercial development known as Hickey's Site, consisting of Blocks A, B & C and the adjoining existing River Building.

Dublin 8, Dublin, Dublin Dublin City Council Commencement / 2026-09-14

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€120m to €190mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. Homes only: the floor area also covers other uses and cannot be split, so the estimate counts the stated homes.
Units / floor584 units / 1,924,464 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
04 board

Protected structure / PB--2285888333

~511 dwellings, A site which previously formed part of the overall RTÉ Campus at... - Planning Application WEBLRD9014/26-S3

Protected Structure: Cairn Homes Properties Limited intends to apply for Permission for a Large-Scale Residential Development (LRD) at this site, which previously formed part of the overall RTÉ Campus at Montrose, Donnybrook, Dublin 4. The site is located within the Simmonscourt Townland. The sit...

A site which previously formed part of the overall RTÉ Campus at Montrose, Donnybrook, Dublin 4, Dublin Dublin City Council New Application / 2026-08-19

Why included: Matches the active board filters and is ranked by newest date plus PlanningBrief score.

Est. construction value€110m to €160mOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor511 units / floor unknown (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: yesdocument: check
05 board

New-Building / PB-22105221820952207

Dublin, Dublin - Commencement Notice LRD6009/23-S3 and WEBLRD6104/26-S3A

Block C D & F - St. Vincents Fairview, the proposed construction of Block's C, D & F over a basement car park. Block C will comprise eight storeys (lower ground, ground and six upper floors) with proposed residential accommodation, 82 units. Block D will comprise eleven storeys (ground and ten up...

Dublin, Dublin, Dublin Dublin City Council Commencement / 2026-08-11

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€80m to €110mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor393 units / 33,410 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
06 board

New-Building / PB-69126994547385209

Dublin, Dublin - Commencement Notice WEB3367/25

Apartment Block A, Bannow Road, Cabra West - a 6 storey apartment block comprising of 40 apartments with a Community Space (shell & core) at ground floor level and all ancillary accommodation.

Dublin, Dublin, Dublin Dublin City Council Commencement / 2026-07-02

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€30m to €40mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor144 units / 12,893 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
07 board

New-Building / PB-71863899502388092

Dublin 8, Dublin - Commencement Notice 3406/25, ABP-308917-20 / SHD0031/20

Player Wills PW2, Donore Ave, St Catherines Ave, South Circular Rd, Dublin 8. Proposed residential block, 2 to 19 storeys over single storey basement incl Tenant amenity area. Ground floor shell and core retail units

Dublin 8, Dublin, Dublin Dublin City Council Commencement / 2026-06-23

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€96m to €130mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor415 units / 40,269 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
08 board

New-Building / PB-57585540364852158

Dublin 12, Dublin - Commencement Notice Chief Executive’s Report No. 185/2025; PP No. 3194/25

Construction of a nine storey residential block comprising 169 residential units over a ground floor car park to be known as Blocks 2 & 3 at Bluebell, Inchicore, Dublin 12

Dublin 12, Dublin, Dublin Dublin City Council Commencement / 2026-06-11

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€43m to €56mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor169 units / 18,035 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
09 board

New-Building / PB-12233176101146108

Dublin, Dublin - Commencement Notice 4126/22

The One Clanwilliam Development (previously referred to as Clanwilliam Quarter) involves the construction of a mixed commercial/ retail building development of circa 36,626m2, consisting mainly of office accommodation extending from Lower Ground to Level 07, with 1 No Basement level extending bel...

Dublin, Dublin, Dublin Dublin City Council Commencement / 2026-02-05

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€120m to €180mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 36,626 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
10 board

Extension / PB-2274505611127275

Dublin, Dublin - Commencement Notice 4506/19/X1

Proposed extention to the existing Radiation Oncology Outpatients units at St Lukes, Beaumont Hospital. The extension will consist of Ground, First and Second Floors and Rooftop plant. St. Lukes Centre, Beaumont Hospital, Dublin 9

Dublin, Dublin, Dublin Dublin City Council Commencement / 2025-12-15

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€23m to €59mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 6,657 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
11 board

New-Building / PB-64815417368010766

Dublin 4, Dublin - Commencement Notice ABP-315488-23

Proposed Construction of a single-storey basement car park and associated ground floor exits forming part of a future residential development at Montrose Lands, Donnybrook, Dublin 4

Dublin 4, Dublin, Dublin Dublin City Council Commencement / 2025-11-28

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€32m to €42mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 18,700 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
12 board

New-Building / PB-56149634527482246

Dublin, Dublin - Commencement Notice 4423/19 & 4778/22

Fumbally Lane Hotel. The construction of a new, part 4, part 8-storey, 8067m2, hotel comprising 235 bedrooms at 27-29 New Row South Dublin 8. The Ground Floor contains Hotel Reception, Communal Lounge and ancillary back-of-house spaces, incorporating an ESB Substation.

Dublin, Dublin, Dublin Dublin City Council Commencement / 2025-07-24

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€30m to €43mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 8,067 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
13 board

New-Building / PB-8972067820359703

Dublin, Dublin - Commencement Notice ABP-307011-20

Construction of 324 No apartments in 3 No blocks (Blk A, B & C), 1 no. 81 unit aparthotel (in Block C) and creche(block B), over basement car park level, and associated works, on lands to northeast of Omni Park Shopping Centre, omni park, santry dublin 9.

Dublin, Dublin, Dublin Dublin City Council Commencement / 2025-06-16

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€82m to €110mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor324 units / 34,298 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
14 board

New-Building / PB-27871238407536429

Dublin, Dublin - Commencement Notice 2143/20

Proposed 223 bedroom hotel ranging in height from 6-9 storeys and basement level.

Dublin, Dublin, Dublin Dublin City Council Commencement / 2025-01-28

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€36m to €53mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 9,829 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
15 board

New-Building / PB-2842580483275267

Dublin, Dublin - Commencement Notice 7003/23

Construction of three blocks of apartments connected by an undercroft carpark on Cromcastle Road. The development will also have two cultural / community spaces located at the ground floor that are being completed to a grey box (shell and core finish but inclusive of life safety systems) standard...

Dublin, Dublin, Dublin Dublin City Council Commencement / 2024-11-28

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€36m to €48mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 15,280 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
16 board

New-Building / PB-60445821005654647

Dublin City, Dublin - Commencement Notice

(i) Demolition of the existing 3-4 storey corrugated iron industrial buildings and 2 storey dilapidated commercial buildings on site (comprising c. 3,300sq.m); (ii) construction of 189 no. Apartments (comprising 151 no. one-bed apartments, 34 no. two-bed apartments and 4 no. three-bed apartments)...

Dublin City, Dublin, Dublin Dublin City Council Commencement / 2024-10-07

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€35m to €46mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 14,621 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
17 board

New-Building / PB-13768424384851838

Dublin, Dublin - Commencement Notice ABP-308193-20 (Planning Ref.: 2935/20)

Maldron Hotel, Clonliffe Road, Drumcondra, Dublin 3, Construction of a 7-storey Hotel building Clonliffe Road, Drumcondra, Dublin 3

Dublin, Dublin, Dublin Dublin City Council Commencement / 2024-09-16

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€29m to €42mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 7,888 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
18 board

New-Building / PB-10300844499195594

Dublin, Dublin - Commencement Notice 4009/22

Proposed construction of an eleven storey Hotel development at Abbey Street & Great Strand Street, Dublin 1. The hotel development will be split into 2 no. hotel blocks connected at basement and will be provided with 474 bedrooms in total. With retail units on Ground Floor finished to grey box st...

Dublin, Dublin, Dublin Dublin City Council Commencement / 2024-08-19

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€91m to €130mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 24,429 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
19 board

New-Building / PB-56374782716809251

Dublin, Dublin - Commencement Notice ABP-313790-22

Construction of 145 apartments in two blocks, 4-6 storeys in height with undercroft car parking and associated landscaping.

Dublin, Dublin, Dublin Dublin City Council Commencement / 2024-05-08

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€37m to €48mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor145 units / 15,426 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
20 board

Extension / PB-37639407150911402

Dublin, Dublin - Commencement Notice

‘The proposed works includes the following works deferred from base building, known as 15 George’s Quay, currently under construction as per commencement notice reference, dated 05.01.2023. • Suspended ceilings to office areas • Suspended ceiling cavity barriers • Raised access floor...

Dublin, Dublin, Dublin Dublin City Council Commencement / 2024-05-08

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€25m to €37mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 7,847 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
21 board

New-Building / PB-47523351778340636

Dublin, Dublin - Commencement Notice LRD6033/23-S3- LRD6010/22-S3 (Based on ABP-310722-21)

Construction of a six- storey residential block to be known as Block 1, a six- storey residential block to be known as Block 2, a six- storey residential block to be known as Block 3, Ancillary Building 1 - a bin and bike store, Ancillary Building 2 – a bike store, Ancillary Building 3 - a creche...

Dublin, Dublin, Dublin Dublin City Council Commencement / 2024-03-01

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€39m to €52mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 16,654 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
22 board

New-Building / PB-12336453891991594

Dublin 1, Dublin - Commencement Notice 4009/23

Construction of new hotel development at Twilfit House, Dublin 1.

Dublin 1, Dublin, Dublin Dublin City Council Commencement / 2024-02-01

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€30m to €43mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 8,004 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
23 board

New-Building / PB-53972890049665438

Dublin, Dublin - Commencement Notice ABP-309627-21

The development will consist of the construction of a 9-storey building over a basement level including 2no. commercial units and 188 no. apartments. The apartments will consist of 20 no. studio units, 79 1 bedroom units and 89 no. 2 bedroom units.

Dublin, Dublin, Dublin Dublin City Council Commencement / 2023-12-06

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€44m to €58mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor188 units / 18,622 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
24 board

New-Building / PB-61108253910444095

Donaghmede, Dublin - Commencement Notice LRD6014/22-S3 ABP-312003-21

[This application is lodged for] The construction of a new residential building (Block 1, Parkside 5B, Dublin 13), forming a single building block on a more larger overall site. Block 1 consists of three residential cores over a shared basement. Each core will have a single stair arrangement, eac...

Donaghmede, Dublin, Dublin Dublin City Council Commencement / 2023-02-24

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€57m to €74mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floor198 units / 23,864 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check
25 board

New-Building / PB-17989163309276089

Dublin, Dublin - Commencement Notice 4166/22 - 4485/17 - 3091/21

Construction of a 9 storey office building over double basement (shell & core) at 157-164 Townsend Street, Dublin 2.

Dublin, Dublin, Dublin Dublin City Council Commencement / 2023-01-03

Why included: Start-stage cue. Check site activity, appointment cues and programme timing.

Est. construction value€45m to €64mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure.
Units / floorunits unknown / 13,710 sqm (units estimated)
Evidence
official: yesPlanningBrief: yesvalue: yesparty: checkdocument: check

PDF export

PDF export is an A4 landscape decision register with source status, value evidence, authority/reference, stage/date and follow-up routing.

Edit before export

Move, remove or group rows here. Edited boards export through the selected-record route so the PDF follows this preview order.

Follow-up