Dublin 14, Dublin
Proposed construction of new single storey flat roof extension to rear (18.41sq.m), complete with fixed roof light over & new double door access to side/west elevation into new open courtyard, new 1.8m...
58,282 project leadsApplications, appeals, tenders and recent site starts
Planning records with an estimated construction value of at least:
Estimated construction value is our estimate from floor area or stated homes and the project type, at January 2026 prices, building works only. It is never a stated figure, and a record with no estimate is not shown here. How we estimate
To see one developer's major projects, type their name in Keyword: it searches the applicant and agent named on the planning application. A record counts as changed when something we show for it changed: its decision, stage, dates, size or the people named. A day when most records changed at once is one of our own site-wide updates and is not counted.
Proposed construction of new single storey flat roof extension to rear (18.41sq.m), complete with fixed roof light over & new double door access to side/west elevation into new open courtyard, new 1.8m...
Construction of an Energy Compound as part of the Phase 2 student residential construction located at University College Dublin Stillorgan Road, Belfield, Dublin 4.
Renovate existing dwelling and construct a new extension to the rear of property. Permission is also sought to demolish existing return to rear, connect to the on-site services, & all necessary...
A) Single storey extension to the rear and side of the existing dwelling along with internal alterations and all other ancillary site development works. B) Extended 1.7 sqm front porch
The construction of a detached building for use as domestic garage/store and home gym (adjacent to dwelling house) and associated site works.
1.) an attic conversion including a rear dormer roof extension, a new window to the gable wall, 2No. rooflights to the front elevation, new internal access stairs, and 2.) the addition of a new first...
Demolition of existing rear single storey extension (11 sq. m.) and construction of a new single storey extension with a floor area of 21 sq. m. to the rear of the existing dwelling house and amendments...
Demolition of existing single-storey rear extension and construction of two single-storey flat-roof extensions to the side and rear.
Rear extension to existing dwelling including granny flat, new waste water treatment system and percolation area
The development will consist of the replacement of hipped roof structure with gabled roof structure including an attic conversion with dormer structure to the rear and 1 roof window to the front of an...
a single storey extension/ granny flat to the side/ rear of existing 2.5 storey detached dwelling including all associated site works
Extension and renovation works to existing dwelling house and all ancillary works at Ballynasheha More, Ballinroad, Dungarvan, Co. Waterford.
To construct new extension on to side of existing dwelling and associated site works
Erection of a dwelling house with septic tank
New dwelling House & garage at Killurin, Co. Offaly
Extension of existing dwelling and all associated works
Construction of a domestic storage shed and associated works on existing dwelling site
A two storey extension to existing dwelling, a bin store to front garden with all associated site development works
Rear extension to dwelling house at Barrack Street, Tallow, Co. Waterford.
House Extension & New Treatment System
Single-storey flat roof extensions to the front, side and rear, including relocation of the front door; partial demolition of the existing single storey rear extension; attic conversion to provide...
Dwelling extension at 30 Castlemara, Annacotty, Co. Limerick
Construction of a dwelling house, treatment unit and all associated services
Extension to existing dwelling House at Killisk, The Ballagh Co. Wexford.(Nick Brighton)
Extend and refurbish extension to rear as living room with alterations to elevations & extend and re-roof existing en-suite single storey extension and associated site works
Provision of an Auxiliary Habitable Dwelling.
A period of 10 years and a 35 year operational life for a battery energy storage facility comprising (1) battery energy storage containers installed on concrete plinths, (2) electrical inverters and...
(i) retention permission to retain house as built and (ii) permission for change of use from holiday home to residential use at 15 lakeview villas, aghadoe, killarney, Co. Kerry v93 x3v5
Whether the continued use of pre-63 residential apartments at 91B, George's Street Lower, Dún Laoghaire, Co. Dublin, A96R125, where car is not provided, to provide accommodation to homeless persons, is...
for a new residential development of 35 dwellings, access provided via an existing spur road. The proposed development consists of 14 No. type A two storey three bedroom semi-detached dwellings, 6 No...
40 No Apartments consisting of 24 No. 1-Bedroom Units, 5 No. 2-Bedroom Units & 11 No. 3- Bedroom Units), Entrance and Access Roads via Keanes Road Connection to public foul and surface water drainage...
Extension of duration of permission 211133 (about 99 homes). As published: of 211133 for the construction of 99 no. dwelling (various types and sizes). The proposed development will include new vehicular...
revisions to the permitted development as per WCC grant Ref 25/60554 at Broomhall, Rathnew, Co. Wicklow for the following: • Revised residential numbers from 87 no. units to 80 no. units...
RED 111 - the development will consist of a 10-year permission for the construction of a Battery Energy Storage System (BESS) on a site of approximately 1.34 hectares. It will comprise 24 no. battery...
The construction of Block C, an apartment block of a residential development project. Block C is a 6-storey (G+5) building and will consist of 42 apartments: The upper floors is served by one one...
The change of use and refurbishment of the existing two-storey building to provide a ground-floor retail unit and a first-floor one-bedroom apartment; the partial alteration and removal of the existing...
Permission/retention permission to develop a four unit, holiday home scheme. The development will include the following; (i) Permission for change of use from shop/café/residential to holiday homes and...
Retention Permission to retain the attic conversion and 4 no. existing rooflights to the existing dwelling located at Dromcunnig, Abbeydorney, Co. Kerry.
Phase 1 of housing development at Glencrow, Moville.
The development will consist of: (i) Change of use from Dental Practice to Office/Training Centre; (ii) minor reconfiguration of internal floor plan; and (iii) ancillary works including revision of...
Modifications to the existing Mount Brown boundary treatment adjacent to the St. James’s Hospital Energy Centre. The proposed works comprise: (a) Raising the height of the existing brick pillars up to...
The development will consist of change of use of an existing 2 storey brewery building know as the Chalk Bar to a hotel now 3 storey with 24 ensuite bedrooms, to the south of the existing Old Schoolhouse...
Permission for the demolition and removal of existing buildings, walls and ancillary structures and the construction of a residential development comprising 14 no. residential units, consisting of 8 no...
construction of a bovine shed (gross floor area 799m2) adjoining existing agricultural buildings, construction of an unroofed walled silage silo with associated concrete apron, construction of an...
Permission is sought by CH Care Services Limited for permission for the following at Convent Hill, Ballina, Co. Mayo within the curtilage of a protected structure, being the Convent of the Immaculate...
for the construction of 7 no dwellings, split into 2 terraced blocks, of 4 no. dwellings and 3 no. dwellings consisting of; 2 no. 4 bedroom three storey end terrace dwellings, 3 no. 3 bedroom two storey...
Permission for change of use from bed & breakfast to 3 no. 1 bedroom apartments, 1 no. 2 bedroom apartment and a wellness studio and all associated site works
the conversion of existing building to provide 2 no. duplex apartments, 1 no. townhouse and 1 no. commercial space, new wastewater pre-treatment system and soakaway for stormwater disposal. The building...
EXPP: 1. Lowering/reprofiling of the existing elevated 9th and 15th tees; removal of associated steps; formation of small tee areas. 2. Strip/retain vegetation and topsoil/rootzone; balanced cut-and-fill...
#3048625 - Regularisation of an existing betting shop on ground floor
Save it to your account, or get an email when new project leads match it.
Save this search