Planning case 2461649

Donegal County Council · 2461649 · Ballintra, Donegal

Latest linked evidence

Notified commencement · 2026-09-02

(1) Construction of (a) 6 no. 1 bedroom apartments located within a single / two storey building, (b) 6 no. 2 bedroom two storey dwelling houses, (c) 6 no. 3 bedroom two storey dwelling houses and (d) 2 no. 4 bedroom two storey dwelling houses, 20 no. residential units in total, (2) Construction of a new entrance, access road and car parking facilities to the proposed development including the construction of pedestrian footpath to connect to existing footpath to the south of the development site, (3) Installation of public lighting throughout the development, (4) construction of (a) foul sewer network which shall be pumped (322m) to connect into existing foul sewer and (b) storm water drainage network including attenuation tank, and installation of a watermain network to the proposed development and (5) Provision of public open space amenities and all associated site development works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    2461649

  2. Planning decision

    2461649

    Conditional permission

  3. Grant date recorded

    2461649

  4. Notified commencement

    Commencement notice

    (1) Construction of (a) 6 no. 1 bedroom apartments located within a single / two storey building, (b) 6 no. 2 bedroom two storey dwelling houses, (c) 6 no. 3 bedroom two storey dwelling houses and (d) 2 no. 4 bedroom two storey dwelling houses, 20 no. residential units in total, (2) Construction of a new entrance, access road and car parking facilities to the proposed development including the construction of pedestrian footpath to connect to existing footpath to the south of the development site, (3) Installation of public lighting throughout the development, (4) construction of (a) foul sewer network which shall be pumped (322m) to connect into existing foul sewer and (b) storm water drainage network including attenuation tank, and installation of a watermain network to the proposed development and (5) Provision of public open space amenities and all associated site development works.

    20 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.