Save this project to account
Connected planning records

Planning case D17B0189

Dun Laoghaire Rathdown County Council · D17B0189 · Glasthule, Dublin

Latest linked evidence

Notified commencement · 2017-09-27

CN0031998DR · Ground and first floor extension to the side of the existing house with 1 no. roof light. Single storey extension to rear of the existing house with 1 no. roof light. 1 new velux rooflight, 1 new first floor window and to lower the ground floor living room window by 550mm to the front of the existing house. Remove existing entrance door and replace new window to front of existing house with new entrance to the side of the house. Increase size of existing small window at first floor to rear of existing house and move it by 350mm

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D17B0189

  2. Planning decision

    D17B0189

    Permission granted

  3. Grant date recorded

    D17B0189

  4. Notified commencement

    CN0031998DR

    Ground and first floor extension to the side of the existing house with 1 no. roof light. Single storey extension to rear of the existing house with 1 no. roof light. 1 new velux rooflight, 1 new first floor window and to lower the ground floor living room window by 550mm to the front of the existing house. Remove existing entrance door and replace new window to front of existing house with new entrance to the side of the house. Increase size of existing small window at first floor to rear of existing house and move it by 350mm

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.