Planning case 214

Westmeath County Council · 214 · Athlone, Westmeath

Latest linked evidence

Notified commencement · 2022-01-31

The development will consist of the refurbishment of existing industrial teaching and maintenance facility building (1015 sq metres) comprising of 2 no. teaching workshops for moulding equipment, upgrade of the toilet facilities, and a proposed extension to the south east corner of existing building to provide a new entrance, reception space, with 2 no. one-person offices, 1 no. two-person office, meeting room and an open plan office space (275 sq metres), a new boiler house extension (50 sq metres) to the rear of the existing building (west façade), with minor alterations to north elevation of the building comprising of a new proposed roller door to workshop, together with new external signage adjacent the proposed entrance and associated site works.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    214

  2. Planning decision

    214

    Conditional permission

  3. Grant date recorded

    214

  4. Notified commencement

    Commencement notice

    The development will consist of the refurbishment of existing industrial teaching and maintenance facility building (1015 sq metres) comprising of 2 no. teaching workshops for moulding equipment, upgrade of the toilet facilities, and a proposed extension to the south east corner of existing building to provide a new entrance, reception space, with 2 no. one-person offices, 1 no. two-person office, meeting room and an open plan office space (275 sq metres), a new boiler house extension (50 sq metres) to the rear of the existing building (west façade), with minor alterations to north elevation of the building comprising of a new proposed roller door to workshop, together with new external signage adjacent the proposed entrance and associated site works.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.