Connected planning records

Energy, Rathduff, Townland of Thomastown Demesne South, Co. Tipperary - Planning Application 2660469

Tipperary County Council · 2660469 · Tipperary

Latest linked evidence

Planning decision · 2026-08-14

2660469 · Conditional permission

Current planning index: New Application. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Reviewed build intelligence

What is being built

Government document review

Council decision on 14 August 2026 for an amendment to PL92.313424. No final grant or no-appeal claim is made. The parent solar farm and the narrower substation works remain distinct.

4 official documents inspected · Checked 2026-09-06 · Official file index

The decision changes the substation, not the whole solar farm

Substation amendment; council decision recorded, final grant unverified · Tipperary 2660469; amendment to the earlier Rathduff solar permission

What the evidence says
The 14 August 2026 decision enlarges the substation compound to approximately 54.1 m by 25.9 m and removes 11 solar-panel tables to accommodate it. Other infrastructure under the earlier PL92.313424 permission remains unchanged. The notification is not a final grant; it states the development is not authorised until that grant issues.

Tipperary 2660469; amendment to the earlier Rathduff solar permission

Why it may matter — interpretation
Interpretation: prevents the repeated parent solar-farm description from becoming new generation capacity.

What is not established
Any later appeal, final grant, installed capacity and commencement are unverified.

Inspect the evidence

Rathduff substation amendment: notification of decision · p.1
removal of 11 tables · Issued 2026-08-14 · Five conditions; not a final grant; old-footprint wording conflicts with the statement · Checked 2026-09-06

removal of 11 tables

The report defines separate power-quality equipment

Substation amendment; council decision recorded, final grant unverified · May amended compound design; solar-farm and ESB sections remain distinct

What the evidence says
The May statement lists a harmonic filter, resistor, reactor with circuit breaker, two capacitor banks with associated breakers and an auxiliary transformer. It separates the solar-farm switch/control rooms from the ESB control room and incoming 38 kV interface. These are source-stated design components, not an equipment order or proof of energisation.

May amended compound design; solar-farm and ESB sections remain distinct

Why it may matter — interpretation
Interpretation: identifies the electrical package without assigning an unverified manufacturer or operating capacity.

What is not established
Final equipment ratings, manufacturer selection, detailed design and installed equipment are unverified.

Inspect the evidence

Rathduff solar-farm amendment: planning and environmental statement · p.11
Power Quality Equipment · Issued 2026-05-19 · Cover and checked date 19 May; approved 13 May; narrow substation amendment · Checked 2026-09-06

Power Quality Equipment

Rathduff substation compound plan and elevations · p.1
HARMONIC FILTER · Issued 2026-05-12 · Figure 3, Revision 1 first issue; explicitly indicative and subject to detailed design · Checked 2026-09-06

HARMONIC FILTER

The drawing separates three rooms within one building

Substation amendment; council decision recorded, final grant unverified · Figure 4, first issue dated 12 May 2026; three room functions in one building

What the evidence says
Figure 4 shows a 12.0 m by 7.3 m building with separate solar-park switch, solar-park control and ESB control rooms. Its elevation labels a 5.8 m height and its key identifies a concrete slab. This is a permitting drawing, not a measured completed building or a full structural specification.

Figure 4, first issue dated 12 May 2026; three room functions in one building

Why it may matter — interpretation
Interpretation: connects the electrical room functions to a defined building package.

What is not established
Final structural system, equipment layouts, construction details and as-built dimensions are unverified.

Inspect the evidence

Rathduff substation building · p.1
CONCRETE SLAB · Issued 2026-05-12 · Figure 4, Revision 1 first issue, permitting drawing · Checked 2026-09-06

CONCRETE SLAB

The previous compound dimensions disagree

Substation amendment; council decision recorded, final grant unverified · Earlier baseline descriptions, not the consistent revised dimensions

What the evidence says
The decision describes the earlier compound as about 24.0 m by 19.0 m, while the May statement describes it as 24.4 m by 13.0 m. Both give the revised footprint as about 54.1 m by 25.9 m. The old baseline is held as a document conflict, so no percentage or area increase is calculated.

Earlier baseline descriptions, not the consistent revised dimensions

Why it may matter — interpretation
Interpretation: avoids an apparently precise but unsupported enlargement calculation.

What is not established
The correct old footprint requires reconciliation with the original approved drawing.

Inspect the evidence

Rathduff substation amendment: notification of decision · p.1
24.0m x 19.0m · Issued 2026-08-14 · Five conditions; not a final grant; old-footprint wording conflicts with the statement · Checked 2026-09-06

24.0m x 19.0m

Rathduff solar-farm amendment: planning and environmental statement · p.6
24.4m in length and 13m in width · Issued 2026-05-19 · Cover and checked date 19 May; approved 13 May; narrow substation amendment · Checked 2026-09-06

24.4m in length and 13m in width

The planning decision does not approve a grid connection

Substation amendment; council decision recorded, final grant unverified · Conditions 2 and 3; separate consent and network interface

What the evidence says
Condition 3 expressly excludes consent to the national-grid connection or its route. Condition 2 ties the amendment to the earlier permission and its expiry. The electrical layout therefore does not establish an agreed or energised grid connection.

Conditions 2 and 3; separate consent and network interface

Why it may matter — interpretation
Interpretation: distinguishes a planning layout from a completed network agreement.

What is not established
Connection agreement, final routing, energisation and operational acceptance are unverified.

Inspect the evidence

Rathduff substation amendment: notification of decision · p.3
connection to the national grid · Issued 2026-08-14 · Five conditions; not a final grant; old-footprint wording conflicts with the statement · Checked 2026-09-06

connection to the national grid

The council requires dark-green equipment and fencing

Substation amendment; council decision recorded, final grant unverified · Condition 4 and submitted boundary-fence detail

What the evidence says
Condition 4 specifies dark green for the electricity control unit, inverters and fencing. The submitted compound plan separately depicts 2.44 m palisade fencing. These are source-specific appearance and layout requirements; they do not identify a finish product or establish completed work.

Condition 4 and submitted boundary-fence detail

Why it may matter — interpretation
Interpretation: retains a concrete finish requirement without inventing its supplier.

What is not established
Final coating system, colour reference, supplier and installation are unverified.

Inspect the evidence

Rathduff substation amendment: notification of decision · p.3
dark green in colour · Issued 2026-08-14 · Five conditions; not a final grant; old-footprint wording conflicts with the statement · Checked 2026-09-06

dark green in colour

Rathduff substation compound plan and elevations · p.1
PALISADE FENCE · Issued 2026-05-12 · Figure 3, Revision 1 first issue; explicitly indicative and subject to detailed design · Checked 2026-09-06

PALISADE FENCE
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 4 government-published PDFs were visually inspected. 46 index rows retained. Selected pages of four supporting PDFs were visually inspected; the wider parent permission and every environmental appendix were not comprehensively reviewed. Proposals do not establish procurement or installed work.

Source history

Timeline

  1. Planning application received

    2660469

  2. Planning decision

    2660469

    Conditional permission

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.