Energy, Rathduff, Townland of Thomastown Demesne South, Co. Tipperary
RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 14 Aug 2026. / Confidence: LowDecision date 14 Aug 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade...
Named firms
Public source roles
- Renewable Energy Systems Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Tipperary County Council
- Exact reference
- 2660469
- Evidence reviewed
- 7 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Renewable Energy Systems Ltd
- Planning agent
- Andrew Mitchell
- Agent address
- 83-85 Bridge Street Ballymena County Antrim
More Tipperary planning activity
These are county discovery links, not claimed relationships to this application.
Application text
RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade fencing, lighting, CCTV and internal access tracks, as well as a minor reconfiguration of the permitted solar array, involving the removal of 11 tables of solar panels to accommodate the revised substation footprint. All other infrastructure of the development permitted under PL92.313424 remain unchanged. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Application to site progress
-
Applied 19 May 2026 2660469
-
Decision Conditional 14 Aug 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660469
RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade fencing, lighting, CCTV and internal access tracks, as well as a minor reconfiguration of the permitted solar array, involving the removal of 11 tables of solar panels to accommodate the revised substation footprint. All other infrastructure of the development permitted under PL92.313424 remain unchanged. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
Open official record