New Application · decision due 24 Aug 2026Decision recorded

Energy, Rathduff, Townland of Thomastown Demesne South, Co. Tipperary

Townland Of Thomastown Demesne South, Tipperary · Tipperary County Council · Plan 2660469 · PB ref PB-3346153853

RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 24 Aug 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 14 Aug 2026. / Confidence: Low
Decision CONDITIONAL

Decision date 14 Aug 2026.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade...

Ref 2660469 Source-linked Official application description for exact planning reference 2660469

Public source roles

Renewable Energy Systems Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Tipperary County Council
Exact reference
2660469
Evidence reviewed
7 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Energy

Energy

The public application record identifies energy in the submitted planning scope.

2660469Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Renewable Energy Systems Ltd
Planning agent
Andrew Mitchell
Agent address
83-85 Bridge Street Ballymena County Antrim
Official description

Application text

RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade fencing, lighting, CCTV and internal access tracks, as well as a minor reconfiguration of the permitted solar array, involving the removal of 11 tables of solar panels to accommodate the revised substation footprint. All other infrastructure of the development permitted under PL92.313424 remain unchanged. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2660469

RED III development which will consist of an amendment to a previously consented development (planning reference PL92.313424) comprising the reconfiguration and enlargement of the permitted substation layout from c. 24.0m x 19.0m compound with an enlarged compound (c. 54.1m x 25.9m), to include a Solar Farm (IP) section and an ESB section, containing control rooms, power quality equipment, transformers and a 12m x 12m hardstanding area. The development includes ancillary infrastructure such as 2.44m high palisade fencing, lighting, CCTV and internal access tracks, as well as a minor reconfiguration of the permitted solar array, involving the removal of 11 tables of solar panels to accommodate the revised substation footprint. All other infrastructure of the development permitted under PL92.313424 remain unchanged. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

AuthorityTipperary County Council
Reference2660469
StatusChecked 7 Sep 2026
Open official record