Planning case SD19A0393

South Dublin County Council · SD19A0393 · Saggart, Dublin

Latest linked evidence

Notified commencement · 2024-09-18

Demolition of an existing building, comprised of 3 blocks, in 3 phases. Construction of a new Post-Primary School, Coláiste Pobail Fóla on an educational campus in Citywest. This is a part 3 storey building with attic tank room, of 11246m2 delivered in 3 phases. The building is comprised of a 1000 pupil Post-Primary School with 4no. Classbase SEN; a Multi-Use Hall; ancillary teaching, pupil and staff facilities, an external store and a rooftop PV array. The building is accessed by 6no. Stairs, 6no. of which Fire Escape and 1no. Lift. Vehicular and Fire Tender access is from an existing enlarged entrance to the northwest of the site, and a new entrance from the north of the site, both off Fortunestown Lane. Cycle and Pedestrian access is from the north of the site off Fortunestown Lane, with additional pedestrian access to the south of the site off Saggart Lakes Road. Site works included the provision of bicycle and scooter parking; vehicle drop off/set down areas; internal access roads and paths; hard and soft play areas; piped infrastructure and ducting; planting, landscaping and boundary treatments; car parking spaces; bin stores; heat pumps; ancillary ramps and stairs; signage; a below ground attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    SD19A0393

    Official source

  2. Planning decision

    SD19A0393

    Permission granted

    Official source

  3. Grant date recorded

    SD19A0393

    Official source

  4. Notified commencement

    Commencement notice

    Construction of a new Primary School, Gaelsoil Lir, on an educational campus in Citywest. This is a part 2 storey building with attic tank room, of 3247m2 delivered in 1 phase. The building is comprised of 16 No. Classrooms with a 2 No. Classbase SEN Unit; a General Purpose Hall; ancillary teaching, pupil and staff facilities and a rooftop PV array. The building is accessed by 4no. Stairs, 3no. of which Fire Escape and 1no. Lift. Vehicular and Fire Tender access is from an existing enlarged entrance to the northwest of the site, and a new entrance from the north of the site, both off Fortunestown Lane. Cycle and Pedestrian access is from the north of the site off Fortunestown Lane, with additional pedestrian access to the south of the site off Saggart Lakes Road. Site works included the provision of bicycle and scooter parking; vehicle drop off/set down areas; internal access roads and paths; hard and soft play areas; piped infrastructure and ducting; planting, landscaping and boundary treatments; car parking spaces; bin stores; heat pumps; ancillary ramps and stairs; signage; a below ground attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.

    Quantity not established for this notice.

    · Notice evidence

  5. Notified commencement

    Commencement notice

    Construction of a new ESB Double MV substation with client switch room. This is a single storey building of 36m2 delivered in 1 phase. The building is comprised of a ESB double MV substation room and a client switch room. The building forms part of the north boundary wall and is accessed externally from a path within the site.

    Quantity not established for this notice.

    · Notice evidence

  6. Notified commencement

    Commencement notice

    Demolition of an existing building, comprised of 3 blocks, in 3 phases. Construction of a new Post-Primary School, Coláiste Pobail Fóla on an educational campus in Citywest. This is a part 3 storey building with attic tank room, of 11246m2 delivered in 3 phases. The building is comprised of a 1000 pupil Post-Primary School with 4no. Classbase SEN; a Multi-Use Hall; ancillary teaching, pupil and staff facilities, an external store and a rooftop PV array. The building is accessed by 6no. Stairs, 6no. of which Fire Escape and 1no. Lift. Vehicular and Fire Tender access is from an existing enlarged entrance to the northwest of the site, and a new entrance from the north of the site, both off Fortunestown Lane. Cycle and Pedestrian access is from the north of the site off Fortunestown Lane, with additional pedestrian access to the south of the site off Saggart Lakes Road. Site works included the provision of bicycle and scooter parking; vehicle drop off/set down areas; internal access roads and paths; hard and soft play areas; piped infrastructure and ducting; planting, landscaping and boundary treatments; car parking spaces; bin stores; heat pumps; ancillary ramps and stairs; signage; a below ground attenuation tank; flood mitigation measures; SUD's; changes in level and all associated site development and excavation works above and below ground.

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.