Latest linked evidence
Notified commencement · 2019-09-10
CN0055999WD · The development will consist of a new detached single storey dwelling house (area 142m2) with a pitched roof design. A new vehicular entrance will form the new site entrance with piers, wing walls and gates. The application will include a new connection to the public drainage system to cater for the wastewater generated from the development. Surface and roof water drainage will run to a new soakway on the site. Also included for are all associated siteworks and pedestrian paths.
This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.