Planning case D21A0929

Dun Laoghaire Rathdown County Council · D21A0929 · Stillorgan, Dublin, Dublin

Latest linked evidence

Notified commencement · 2023-01-16

CN0096724DR · The conservation, alterations, extension and refurbishment of the existing detached three storey house (Protected Structure), with associated site, The alterations comprise, at ground floor:- the removal of the non-original glazed rear porch, the removal of a non- original external door and window in the kitchen and the blocking up of the openings; the replacement of non-original casement window with a sash window to match the originals, the removal of an internal wall between the existing kitchen and sitting room; the insertion of a visitors bathroom, the insertion of two no. patio doorsteps from the sitting room to the rear garden; and at first floor:- the removal in 2 no. existing bathrooms of non-original partitions, finishes and sanitary ware, the replacement of 2 no. non-original rooflights, the formation of a part dormer roof over the northern annexe, the breaking out of two no. new doorsets to a new En Suite Bathroom and dressing room extension at the southern annexxe; at second floor:- the alteration of non-original existing en suite bathroom partition and renewal of finishes and fittings. The extension comprises:- at ground floor, the addition of c. 5 sqm to the existing home office, and at first floor, the addition of c 16.5 sqm, to form new en suite bathroom and dressing room, with new sash windows front and rear to match existing windows. The works also include the renewal of non-original plumbed and wired services and kitchen, bathroom and bedroom fittings and f

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    D21A0929

  2. Planning decision

    D21A0929

    Permission granted

  3. Grant date recorded

    D21A0929

  4. Notified commencement

    CN0096724DR

    The conservation, alterations, extension and refurbishment of the existing detached three storey house (Protected Structure), with associated site, The alterations comprise, at ground floor:- the removal of the non-original glazed rear porch, the removal of a non- original external door and window in the kitchen and the blocking up of the openings; the replacement of non-original casement window with a sash window to match the originals, the removal of an internal wall between the existing kitchen and sitting room; the insertion of a visitors bathroom, the insertion of two no. patio doorsteps from the sitting room to the rear garden; and at first floor:- the removal in 2 no. existing bathrooms of non-original partitions, finishes and sanitary ware, the replacement of 2 no. non-original rooflights, the formation of a part dormer roof over the northern annexe, the breaking out of two no. new doorsets to a new En Suite Bathroom and dressing room extension at the southern annexxe; at second floor:- the alteration of non-original existing en suite bathroom partition and renewal of finishes and fittings. The extension comprises:- at ground floor, the addition of c. 5 sqm to the existing home office, and at first floor, the addition of c 16.5 sqm, to form new en suite bathroom and dressing room, with new sash windows front and rear to match existing windows. The works also include the renewal of non-original plumbed and wired services and kitchen, bathroom and bedroom fittings and f

    1 units stated for this notice or phase; not a project total.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.