Protected structure, Templeville, 44, Temple Road, Dublin 6, - Planning Application WEB5373/25

Dublin City Council · WEB537325 · Dublin

Latest linked evidence

Notified commencement · 2026-06-22

The development will consist/consists of: (i) Cleaning and local repointing repairs of existing brickwork where required to the front façade and the brick chimney stacks; (ii) Upgrade of the existing uPVC rainwater goods to the rear and side elevations to heritage grade, cast iron goods and refurbishment of the existing cast iron rainwater downpipes and gutters; (iii) Cleaning and repointing of the central granite front entrance steps; (iv) Removal of single storey lean-to extension to the eastern gable (6 sq.M); (v) Removal of the existing single storey, western and rear extensions (88 sq.M); (vi) Provision of a new granite faced wall and open air courtyard on the western side of the main house; (vii) Provision of a new door and window at Lower Ground Floor level to enclose the external lobby space located beneath the front entrance steps; (viii) Internal alterations to the front reception room at Lower Ground Floor Level to provide a bedroom with an en-suite bathroom (ix) Replacement of the existing front wall and gates to the existing eastern courtyard with a new granite wall and new painted hardwood gates; (x) Internal and external modifications to the existing Coach House including raising the level of external walls and pitched roof by 500mm, adjusting level of the first floor, provision of new rooflights to the raised roof, modifications to existing glazing and external door opes and provision of new glazing and door opes to the front and rear facades; (xi) Constructio

Indexed observation: Granted. Read the linked decisions for their full terms.

This page connects records for one planning case. Separate permissions, amendments and phases may belong to a wider development. A notified commencement date does not confirm that building work started.

Source history

Timeline

  1. Planning application received

    WEB537325

  2. Planning decision

    WEB537325

    Permission granted

  3. Grant date recorded

    WEB537325

  4. Notified commencement

    Commencement notice

    The development will consist/consists of: (i) Cleaning and local repointing repairs of existing brickwork where required to the front façade and the brick chimney stacks; (ii) Upgrade of the existing uPVC rainwater goods to the rear and side elevations to heritage grade, cast iron goods and refurbishment of the existing cast iron rainwater downpipes and gutters; (iii) Cleaning and repointing of the central granite front entrance steps; (iv) Removal of single storey lean-to extension to the eastern gable (6 sq.M); (v) Removal of the existing single storey, western and rear extensions (88 sq.M); (vi) Provision of a new granite faced wall and open air courtyard on the western side of the main house; (vii) Provision of a new door and window at Lower Ground Floor level to enclose the external lobby space located beneath the front entrance steps; (viii) Internal alterations to the front reception room at Lower Ground Floor Level to provide a bedroom with an en-suite bathroom (ix) Replacement of the existing front wall and gates to the existing eastern courtyard with a new granite wall and new painted hardwood gates; (x) Internal and external modifications to the existing Coach House including raising the level of external walls and pitched roof by 500mm, adjusting level of the first floor, provision of new rooflights to the raised roof, modifications to existing glazing and external door opes and provision of new glazing and door opes to the front and rear facades; (xi) Constructio

    Quantity not established for this notice.

    · Notice evidence

What this record establishes

Only exact linked records appear here. A missing appeal, commencement or completion entry means that evidence has not been established on this page. It does not prove that the event never happened.

Planning scale and individual notice or phase quantities remain separate. Notice quantities are not added into a development total or completion percentage.