Significant further information revises the KSW-S2/S4 proposal from 84 to 92 homes. The inspected notice and layout establish a revised proposal, not a grant.
The revised proposal contains 92 homes in six blocks
Significant FI proposal for KSW-S2/S4
What the evidence says
The August significant-FI notice changes 84 homes to 92 and replaces six three-storey blocks with one four-storey block and five three-storey blocks. It states 1 one-bedroom, 49 two-bedroom and 42 three-bedroom dwellings, with gross floor area revised from 9,255 to 8,348.2 m². Revision A of the site layout also labels 92 homes.
Why it may matter — interpretation
Design and estimating teams need the revised mix, height and floor area together; the larger home count does not mean larger gross floor area.
What is not established
No grant or construction start is established by these selected documents.
Inspect the evidence
Significant further-information site notice · p.1
92 · Issued 2026-08-20 · Notice erection date 20 August; received 21 August; indexed 24 August · Checked 2026-09-07
92
Revised site layout and ground floor layout · p.1
92 RESIDENTIAL UNITS · Issued 2026-06-08 · 21004.PL.300 revision A; received 7 August; catalogue 10 August · Checked 2026-09-07
92 RESIDENTIAL UNITS
The latest layout separates resident and visitor cycle provision
Revised transport provision shown on 21004.PL.300 A
What the evidence says
Revision A schedules 84 car-parking spaces, 225 long-term bicycle places and 46 short-term bicycle places. The notice’s 271 bicycle total combines those two cycle categories; neither is an additional separate total.
Why it may matter — interpretation
Cycle-store suppliers and civil designers can distinguish the secure long-term provision from visitor stands when assessing the scope.
What is not established
Supplier selection, installation and a granted final parking layout remain unverified.
Inspect the evidence
Revised site layout and ground floor layout · p.1
LONG TERM BICYCLE STORE · Issued 2026-06-08 · 21004.PL.300 revision A; received 7 August; catalogue 10 August · Checked 2026-09-07
LONG TERM BICYCLE STORE
Significant further-information site notice · p.1
271 · Issued 2026-08-20 · Notice erection date 20 August; received 21 August; indexed 24 August · Checked 2026-09-07
271
The layout keeps canal frontage and neighbouring links distinct
Application boundary and access interfaces on revision A
What the evidence says
The revised site plan shows six blocks north of the Grand Canal, a pedestrian/cycle shared route along their southern side and potential road/cycle connections at the eastern boundary. It separately labels neighbouring council schemes and the southern link-street infrastructure. Those neighbouring works are contextual interfaces, not extra dwellings under this application.
Why it may matter — interpretation
Civil contractors should distinguish works inside the housing application from interfaces requiring coordination with neighbouring permissions.
What is not established
The plan does not establish delivery of the potential links or completion of neighbouring infrastructure.
Inspect the evidence
Revised site layout and ground floor layout · p.1
POTENTIAL LINK ROAD TO ADJACENT SITE · Issued 2026-06-08 · 21004.PL.300 revision A; received 7 August; catalogue 10 August · Checked 2026-09-07
POTENTIAL LINK ROAD TO ADJACENT SITE
The declared pages of these government-published PDFs were visually inspected. Other catalogue files, later compliance, procurement and installed specifications were not established. Historical weekly membership is retained separately from these document dates.