The Block F permission identifies conversion and glazing works, water and drainage controls, and a construction-management requirement. These dated records do not identify installed products or specifications for Blocks K1 and K2.
Conversion includes internal and glazing alterations
2020 permitted conversion · Block F only: two apartments under Dublin City 2528/20 and ABP-307743-20, granted 19 November 2020
What the evidence says
The permitted conversion creates two one-bedroom apartments in the existing ground-floor Block F unit. It includes internal alterations, changes to façade openings and glazing, private terraces and reallocation of two basement parking spaces.
Why it may matter — interpretation
The works concern an existing unit, which makes the approved opening and window details the relevant next evidence.
What is not established
Frame material, glazing performance, manufacturer and installed condition are not established.
Inspect the evidence
ABP-307743-20 Board Order · p.1
Proposed Development · Issued 2020-11-19 · Final Board order; signing date verified on official case 307743 page · Checked 2026-09-05
changes to façade opes and glazing
Water and drainage require authority compliance
2020 Board conditions · Block F only: two apartments under Dublin City 2528/20 and ABP-307743-20, granted 19 November 2020
What the evidence says
Conditions 2 and 3 require water and drainage arrangements, including surface water, to meet council requirements, with Irish Water connection agreements before works begin.
Why it may matter — interpretation
The order identifies a services approval requirement to follow through to the compliance records.
What is not established
A signed agreement, pipe layout, capacity or completed connection is not established by the order.
Inspect the evidence
ABP-307743-20 Board Order · p.3
Conditions 2 and 3 · Issued 2020-11-19 · Final Board order; signing date verified on official case 307743 page · Checked 2026-09-05
water and/or wastewater connection agreement(s)
A construction-management plan must be agreed
2020 Board condition · Block F only: two apartments under Dublin City 2528/20 and ABP-307743-20, granted 19 November 2020
What the evidence says
Condition 5 requires an agreed plan covering construction practice, noise management and off-site construction or demolition waste disposal before works begin.
Why it may matter — interpretation
The later agreed plan would be the source for the actual site-management approach.
What is not established
The submitted plan, its approval and the practices used on site have not been inspected.
Inspect the evidence
ABP-307743-20 Board Order · p.4
Condition 5 · Issued 2020-11-19 · Final Board order; signing date verified on official case 307743 page · Checked 2026-09-05
Construction Management Plan
Two official PDFs inspected. The final order governs the conditions shown below; the earlier inspector report is background. This partial review establishes dated permission requirements, not current availability of work or an as-built specification.