Latest commencement records.

309 commencement notices give a start date this week, for 291 projects on PlanningBrief. Each is counted by the start date on the notice, not the day we added it.

8–14 Jun 2026 Week309 notices51 link to the official notice309 linked to a project24 counties683 units stated

Largest projects starting this week

Linked projects · largest stated units, never a sum

All commencement notices in the latest update

309 records

Dublin 13, Dublin

DublinDublin City Council

Proposed Material Alterations from Basement Store Room to Commercial Kitchen

Start date 8 Jun 2026Start date 8 Jun 2026

Ballycullen, Dublin

DublinSouth Dublin County CouncilPlanning ref SD25B/0625W

The construction of a Ground Floor Front Porch, and Attic Conversion involving raising the side gable wall, and the construction of Dormer windows to the front and rear roof slopes, at 14 Wood Dale Green, Ballycullen, Dublin D24 X92X.

Start date 8 Jun 2026Start date 8 Jun 2026

Dublin, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D26A/0105/WEB

Extending a 3 bed semi at the back

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Cork, Cork

CorkCork City CouncilPlanning ref 2443427

Construction of new front and rear extensions, and elevational alterations to existing house.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Clonard, Meath

MeathMeath County CouncilPlanning ref 2460405

To construct 1no. new storey and a half ICF Built private dwelling at Mulphedder, Clonard, Enfield Co.Meath

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Ballina, Mayo

MayoMayo County CouncilPlanning ref P25/60580

Construction of a single storey domestic garage

Start date 8 Jun 2026Start date 8 Jun 2026

Muckross, Kerry

KerryKerry County CouncilPlanning ref 21/1292

Construction of a single storey detached dwelling with attic accommodation, rear facing dormer, and all associated site works.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Ballina, Mayo

MayoMayo County Council

The proposed work involves the refurbishment of the existing out-patients clinic to provide a modern Minor Injury Unit, including the refurbishment of existing clinical rooms, clinical support rooms, WCs, admin rooms, reception, and staff facilities over an area of 554 m2 At rooftop level, work will be carried out to install plant associated with the installation of a new ventilation system.

Start date 8 Jun 2026Start date 8 Jun 2026

Bandon, Cork

CorkCork County CouncilPlanning ref 25/05602

Construction of a dwellinghouse

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Errill, Laois

LaoisLaois County CouncilPlanning ref 2560367

construct a new proposed two storey dwelling, redesigned site entrance, new proposed wastewater treatment system with percolation area, new proposed bored well and all associated site works.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Blackrock, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref ABP APPEAL NO: PL-500070-DR / PLANNING REF: D25A/0612/WEB

The development will consist of the removal of the timber post and rail fence and the erection of a new two-storey pitched roof dwelling with balcony, a new garden wall/fence, the lowering of the existing block wall facing Newtown Park and all associated site works.

Start date 8 Jun 2026Start date 8 Jun 20261 units (scheme)

Aughnacliffe, Longford

LongfordLongford County CouncilPlanning ref 2560220

Construction of dwelling house and all ancillary works.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Ratoath, Meath

MeathMeath County CouncilPlanning ref 21/1891

Construction of a new detached two storey dwelling, new site entrance, new wastewater treatment system and all associated site works at Lagore Little, Ratoath, Co Meath.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Kilcar, Donegal

DonegalDonegal County CouncilPlanning ref 2461200

New Dwelling House, Connection to the public sewer Associated Site Works

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Macroom, Cork

CorkCork County CouncilPlanning ref 25/4029

Construction of dwellinghouse and associated siteworks

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Dublin 14, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25B/0628

The construction of a part one-storey and part two-storey rear extension with skylight, a first-floor side extension above the existing garage conversion, minor alterations to the existing front and side fenestration at first-floor level, the construction of a ground-floor front extension incorporating a bay window and open porch, garden room at the back of the house, internal alterations at both ground and first floor levels to accommodate the proposed internal layout and all ancillary site works.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Killiney, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25B/0622/WEB

Conversion of existing attic space to 3no. bedrooms, 2no. bathrooms and office comprising of modification of existing roof structure, new access stairs, roof windows to the side and flat roof dormer to the side.

Start date 8 Jun 2026Start date 8 Jun 2026

Dublin 3, Dublin

DublinDublin City Council

Changing the existing two training rooms at ground floor into the Arcus Room (multi purpose meeting room) and creating two meeting rooms, a small meeting room, a board meeting room and a CEO office at second floor and all associated M&E services

Start date 8 Jun 2026Start date 8 Jun 2026

Dublin 5, Dublin

DublinDublin City CouncilPlanning ref WEB1382/26

Conversion of the attic into storage use with a staircase, a hipped roof dormer window to the side and a flat roof dormer window to the rear with all finishes to match the existing dwelling, to existing 2 storey semi- detached dwelling including all associated site works

Start date 8 Jun 2026Start date 8 Jun 2026

Ballina, Mayo

MayoMayo County Council

The works will consist of internal alterations to existing Ballina Primary Care Centre.

Start date 8 Jun 2026Start date 8 Jun 2026

Dublin 14, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25A/0728/WEB - D25A/0356/WEB

Construction of a first floor side extension to include alterations to the existing front facade, an attic conversion and the insertion of a dormer extension to the rear elevations, 5 no. Velux windows to the front, rear and side elevations granted under planning ref. D25A/0356/WEB

Start date 8 Jun 2026Start date 8 Jun 20261 units (scheme)

MOYLOUGH, BALLINASLOE, Galway

GalwayGalway County CouncilPlanning ref 24/61648

CONSTRUCTION OF NEW DWELLING HOUSE, TREATMENT SYSTEM, PERCOLATION AREA INCL. ALL ANCILLARY SITE DEVELOPMENT WORKS.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Dublin 9, Dublin

DublinDublin City CouncilPlanning ref WEB5023/25

Demolish existing single storey extension and construct a new single storey extension all to rear. Single storey porch extension to front and all associated site works.

Start date 8 Jun 2026Start date 8 Jun 2026

Three Mile House, Monaghan

MonaghanMonaghan County CouncilPlanning ref 2560155

detached 2-storey dwelling in traditional build masonry

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Galway, Galway

GalwayGalway County CouncilPlanning ref 24/60475

Construction of a garage/garden shed at Mucrois.

Start date 8 Jun 2026Start date 8 Jun 2026

Dublin, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25A/0884/WEB

Construction of a 2 story modular MV Swithroom

Start date 8 Jun 2026Start date 8 Jun 2026

Galway, Galway

GalwayGalway County CouncilPlanning ref 24/60475

Construction of a dwelling house and private wastewater treatment system at Mucrois.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Kenmare, Kerry

KerryKerry County CouncilPlanning ref 2560871

Construction of a new domestic shed

Start date 8 Jun 2026Start date 8 Jun 2026

Kenmare, Kerry

KerryKerry County CouncilPlanning ref 2560871

Construction of a house extension and material alterations

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Burgess, Nenagh, Tipperary

TipperaryTipperary County CouncilPlanning ref 2360173

the construction of front porch and construction of rear extension and new waste water treatment system

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Dublin 14, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D26A/0127

Demolish single storey conservatory to rear, upper floor dormer to side, chimneys, flat roof of single storey structure to side. Construction of upper floor dormers to sides and rear. Construct pitched roof to rear, over existing flat roof single storey structure. Alterations to existing single storey side structure consisting of extension to front, build up side walls and construct new flat roof, new boundary fencing to side. Rooflights to existing roofs to front, sides and rear. Alterations to ground floor windows, new windows and doors to sides and rear. Associated internal alterations including new stairs, new front door (reducing existing covered porch depth). Widen vehicular entrance and parking area.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Clondrohid, Macroom, Cork

CorkCork County CouncilPlanning ref 24/6226

Construction of a dwelling house and associated works

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Whitehall, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25A/0986/WEB

Proposed Extension at 85 Carrickmount Avenue, Whitehall, Dublin 14, D14TW42

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Mahon Cork, Cork

CorkCork City CouncilPlanning ref 25/44198

(1) Raising of the entire roof level to an existing dwelling by 1.8m and new first floor windows and roof lights all for the purpose of providing first floor habitable accommodation (2) A front/side ground extension to provide a new front door entrance to the dwelling (3) Elevational alterations to the existing front, side and rear external walls including blocking up of existing openings, formation of new openings and plastering over of brick cladding on the front elevation & (4) All associated site works

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Dublin, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D23B/0407

Attic conversion, construction of a dormer window and rooflight in the main roof to the front of the property.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Bishopstown, Cork

CorkCork City CouncilPlanning ref 24/43324

construction of a single storey extension tot he side of an existing dwelling at 25 Woodbrook Avenue Bishopstown Cork

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Erry, Offaly

OffalyOffaly County CouncilPlanning ref 25/60644

PERMISSION FOR A NEW DWELLING HOUSE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AT RATHLIHEN, MOUNTBOLUS, TULLAMORE, CO OFFALY.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Waterfall, Cork

CorkCork County CouncilPlanning ref 25/5823

Construction of a new bungalow dwelling

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Fountainstown, Cork

CorkCork County CouncilPlanning ref 22/06667

Construction of new dormer to front and ground floor extension to rear and all associated site works.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Dublin, Dublin

DublinDublin City CouncilPlanning ref WEB5084/21

Proposed works include a new front porch and a two storey extension to the side and back, this will wrap around at 3.5 meters back to the rear of the property at ground level and 2.7 Meters at first floor level to create extra space and modernisation to this family home.

Start date 8 Jun 2026Start date 8 Jun 2026

Castletroy, Limerick

LimerickLimerick City and County CouncilPlanning ref 2461247

The construction of a single storey rear extension, a first- floor side extension (over existing living area) and demolition of existing single storey covered rear extension at 707 Elm Green Close, Elm Park, Castletroy, Co. Limerick.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Keenagh, Longford

LongfordLongford County CouncilPlanning ref 24/38

Refurbishment of 2 storey over basement country house, incl. removal of small single storey extension to rear, re-roofing, replacement of external render, replacement of internal wall render and floor slabs at basement level, provision of 2 new bathrooms.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Ballyauliffe, Limerick

LimerickLimerick City and County CouncilPlanning ref 2660096

Demolition of existing derelict dwelling house, construction of new replacement dwelling

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Mungret, Limerick

LimerickLimerick City and County CouncilPlanning ref 26/60168

Construction of a single-storey extension to the rear of the existing dwelling house, associated renovation works to include converting the attic into living accommodation and raising the roof, creating a storey and a half front elevation and all ancillary site works

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Glasnevin, Dublin

DublinDublin City CouncilPlanning ref WEB5769/25

The works will include the construction of a single story flat roof extension to the rear of the property. The installation of two new roof lights to the proposed roof. Some internal alterations and refurbishment of the existing dwelling. All along with associated landscaping, site works and drainage and surface water soak pit.

Start date 8 Jun 2026Start date 8 Jun 2026

Cobh, Cork

CorkCork County CouncilPlanning ref 25\6636

dwelling house

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Tomcoole Little, Wexford

WexfordWexford County CouncilPlanning ref 20240977

Jack Dunne construction of a fully serviced dwelling house and a domestic garage and all associated site works

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Grange, Sligo

SligoSligo County CouncilPlanning ref 2560538

Dwelling house and all associated site works

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Caherconlish, Limerick

LimerickLimerick City and County CouncilPlanning ref 25/60946

The construction of a dwelling house, waste water treatment system and percolation area, entrance and all ancillary site works.

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)

Raheenadown, Laois

LaoisLaois County CouncilPlanning ref 25/60302

Construct 2 storey dwelling house, domestic garage, waste water treatment system, percolation area, connection to mains water, new splayed entrance and asscoiated site works

Start date 8 Jun 2026Start date 8 Jun 20261 units (phase)
How this is counted

Only notices linked to a project are grouped. When one project has several notices this week, it shows the largest number of units stated on any of them, never a sum. Every notice stays in the list with its own start date. Figures cover 8–14 Jun 2026.