Latest commencement records.

251 commencement notices give a start date this week, for 243 projects on PlanningBrief. Each is counted by the start date on the notice, not the day we added it.

15–21 Jun 2026 Week251 notices97 link to the official notice251 linked to a project26 counties508 units stated

Largest projects starting this week

Linked projects · largest stated units, never a sum

All commencement notices in the latest update

251 records

The Green, Tipperary

TipperaryTipperary County CouncilPlanning ref 2560004

DEVELOPMENT: the following works to existing dwelling house: 1) rear extension; 2) side extension; 3) demolish the existing front porch and construct an extension to the front of the dwelling house; 4) alterations to existing dwelling house; 5) all associated site works

Start date 19 Jun 2026Start date 19 Jun 20261 units (phase)

Meelick, Clare

ClareClare County CouncilPlanning ref 2560782

To construct a detached domestic garage, connection to necessary services together with all associated ancillary and incidental site works

Start date 19 Jun 2026Start date 19 Jun 2026

Meelick, Clare

ClareClare County CouncilPlanning ref 2560782

To construct a detached single storey dwelling, new entrance, onsite wastewater treatment system, connection to necessary services together with all associated ancillary and incidental site works

Start date 19 Jun 2026Start date 19 Jun 20261 units (phase)

Dublin 14, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25B/0178/WEB

Two-storey front extension with front- facing gable. Three Velux windows to front roof slope. Attic converted for storage with rear dormer and side gable window. New canopy over front entrance.

Start date 19 Jun 2026Start date 19 Jun 2026

Delorasary, Wicklow

WicklowWicklow County CouncilPlanning ref 2460682

New block work dwelling with slate roof

Start date 19 Jun 2026Start date 19 Jun 20261 units (phase)

Waterfall, Cork

CorkCork County CouncilPlanning ref 25/5297

CONSTRUCTION OF A NEW SINGLE STOREY GARAGE AND ASSOCIATED SITE WORKS AT CORRAN, WATERFALL, CO. CORK

Start date 19 Jun 2026Start date 19 Jun 2026

Waterfall, Cork

CorkCork County CouncilPlanning ref 25/5297

PROPOSED NEW SINGLE STOREY DWELLING AND ASSOCIATED SITE WORKS AT CORRAN, WATERFALL, CO. CORK

Start date 19 Jun 2026Start date 19 Jun 20261 units (phase)

Cork, Cork

CorkCork City CouncilPlanning ref 2544136

Change of use of an existing permitted creche (under Reg. ref. 13/4765) within the sports centre to a Wellness Centre. The proposal involves internal layout changes only.

Start date 18 Jun 2026Start date 18 Jun 2026

Dublin 9, Dublin

DublinFingal County Council

Kitchen Extension

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Blackhall Wood, Louth

LouthLouth County CouncilPlanning ref 2660067

Construction of a new garage along with all associated site works.

Start date 18 Jun 2026Start date 18 Jun 2026

Cork, Cork

CorkCork City CouncilPlanning ref 21/40215

The development involves the construction of a residential development consisting of 4 no. three storey, 4-bedroom terraced dwellings, 2 no. three storey, 4-bedroom semi-detached dwellings with associated bicycle parking, refuse storage, landscaping and all ancillary site development works.

Start date 18 Jun 2026Start date 18 Jun 20266 units (phase)

Thomastown, Kilkenny

KilkennyKilkenny County CouncilPlanning ref 2560024

detached two storey masonry fully serviced dormer dwelling

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Dublin, Dublin

DublinFingal County Council

The proposed works comprise the strip out and refurbishment of an existing warehouse with ancillary office accommodation. The proposed works include; replacement of internal finishes, new M&E installations, roof repairs and associated site and building works.

Start date 18 Jun 2026Start date 18 Jun 2026

Hospital, Limerick

LimerickLimerick City and County CouncilPlanning ref 211320

New dwelling, entrance, WWTS at Oldtown Hospital, Co. Limerick

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Galway, Galway

GalwayGalway City Council

Material Alterations to the office area in Block A at ATU Galway, Co. Galway

Start date 18 Jun 2026Start date 18 Jun 2026

Castleblayney, Monaghan

MonaghanMonaghan County CouncilPlanning ref 2560512

To construct a new two storey, split level dwelling, new site entrance, connection to mains sewer together with all associated site works

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Ballyroan, Laois

LaoisLaois County CouncilPlanning ref 2460541

construct a dormer style dwelling house, attached car port and domestic garage, septic tank, percolation area, new entrance and all associated and necessary site works at Ballinlough, Ballyroan

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

New Ross, Wexford

WexfordWexford County CouncilPlanning ref 20251282W

Construct a serviced dwelling house along with associated ancillary works

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Crosserlough, Cavan

CavanCavan County CouncilPlanning ref 2560528

Construction of a dormer style dwelling at Clare, Crosserlough, Co. Cavan.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Carrigans, Donegal

DonegalDonegal County CouncilPlanning ref 25/61075

Demolition of existing agricultural shed and construction of a new agricultural shed with underground effluent storage tank abutting existing sheds and all associated site works.

Start date 18 Jun 2026Start date 18 Jun 2026

Navan, Meath

MeathMeath County Council

Extension to the rear of an existing dwelling house

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Kilmacrenan, Donegal

DonegalDonegal County CouncilPlanning ref 25/60087

CONSTRUCTION OF A NEW DWELLING, INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKS AT KILMACRENNAN LETTERKENNY PO CO. DONEGAL

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Ennis, Clare

ClareClare County CouncilPlanning ref P26/60051

Refurbish an existing dwelling house to include the reconfiguration of existing window openings and the main front entrance, the demolition of the existing garage and attached covered car port, provide for an extension to the rear, raise the height of the front boundary wall, and carry out all ancillary site works to facilitate the proposed development.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Dublin, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25A/0502/WEB

Attic space conversion to habitable bedroom

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

MONTENOTTE, Cork

CorkCork City CouncilPlanning ref 2543570

Alteration and extension to eastern and western elevations and associated works.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Kilkishen, Clare

ClareClare County CouncilPlanning ref 2460229

Elevational changes to existing dwelling and internal alterations to same. Demolition of lean- to roofed canopy to front of dwelling. Construction of an extension to existing garage & erection of a post and panel boundary fence at the side of existing property including all ancillary site works.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Kilworth, Cork

CorkCork County CouncilPlanning ref 25/05325

Erection of a two story detached dwelling house of masonry construction with waste water treatment system and assoicated site works.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Loughanure, Donegal

DonegalDonegal County CouncilPlanning ref 26/60298

Construction of a New Dwelling House and all associated site works

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Malin, Donegal

DonegalDonegal County CouncilPlanning ref 2561797

New Dwelling, wastewater treatment plant and associated siteworks at Ballylannon, Malin, Co. Donegal

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Dublin 3, Dublin

DublinDublin City Council

Removal of existing roof structure and roof covering and construction of a new roof structure and roof covering to an existing dwelling house, including associated structural repairs, insulation upgrades, flashings and rainwater goods. All works to comply with the Building Regulation

Start date 18 Jun 2026Start date 18 Jun 2026

Bavin, Donegal

DonegalDonegal County CouncilPlanning ref 25/61483

CONSTRUCTION OF A NEW DWELLING HOUSE WITH SEWERAGE TREATMENT SYSTEM, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Lake View, Leitrim

LeitrimLeitrim County CouncilPlanning ref 2460014

works to existing cottage (1) the erection of a new extension to the rear (north) elevation, (2) the existing hipped roof shall be removed and replaced with a gabled roof, the wall plate level of which shall be raised in order to provide living accommodation at attic level, (3) relocate main entrance from south elevation to west elevation, and (4) all existing fenestration shall be altered to accommodate the proposed changes as indicated on plans & elevations submitted, together with all associated site development works.

Start date 18 Jun 2026Start date 18 Jun 2026

Dublin 10, Dublin

DublinDublin City Council

Demolish existing rear extension, construct a new single storey extension to the rear of dwelling. Internal alterations, modifications & all associated site development works.

Start date 18 Jun 2026Start date 18 Jun 2026

Limerick, Limerick

LimerickLimerick City and County CouncilPlanning ref 2560409

Hip roof to gable and dormer to rear roof to accommodate stairs to allow conversion of attic as non habitable storage space with roof windows to front roof, gable window to side all with associated ancillary works

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Louth

LouthLouth County CouncilPlanning ref 2460570

Extension and alterations to the existing dwelling house at Feede, Mountpleasant, Dundalk, Co. Louth

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Carlow, Carlow

CarlowCarlow County CouncilPlanning ref 2560407

The construction of a storey & a half type extension to the rear elevation and new windows to gables of existing dwelling and all associated site works.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Ballinode, Sligo

SligoSligo County CouncilPlanning ref 2560215

Permission for construction of 2-storey extension to the rear of existing dwelling house and all associated works at 26 Ashbury Lawn, Ballinode, Sligo. F91 RK8N

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Westown, Meath

MeathMeath County CouncilPlanning ref 25/61371

Construction of a Garage at Baltrasna, Ashbourne, Co Meath.

Start date 18 Jun 2026Start date 18 Jun 2026

Dublin 12, Dublin

DublinDublin City CouncilPlanning ref WEB5834/25

Permission sought for: (A) Alterations on main dwelling house (334A), to include; (i) Replacement of the existing second front door (south elevation, left of porch) with a window matching the cill height of existing windows on this elevation, (ii) Installation of two rooflights to the front (south elevation), (iii) Replacement of Georgian-style glazing with plain glazing on all elevations, (iv) with associated site works. (B) (i) Construction of a single-storey, flat roofed sunroom and laundry room, linking the existing front dwelling (No. 334A) to the existing rear unit onsite, to form one single dwellinghouse, (ii) with associated site works, and connections to existing services at 334A Kildare Road, Crumlin, Dublin 12, D12 E2V9.

Start date 18 Jun 2026Start date 18 Jun 2026

Rathvilly, Kildare

KildareKildare County CouncilPlanning ref 2560218

The construction of a single storey dwelling house, new site entrance, bored well, proprietary treatment system and associated percolation area, all ancillary site works and services

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Gorey, Wexford

WexfordWexford County CouncilPlanning ref 20230071

Construction of domestic garage and to carry out all associated ancillary site works.

Start date 18 Jun 2026Start date 18 Jun 2026

Clane, Kildare

KildareKildare County CouncilPlanning ref 2660199

(a) change of use of said garage & garden room to the rear of an existing dwelling to domestic use to form part of a family flat extension, (b) single storey extension to the southwest of said domestic garage & garden room, (c) raising of roof level of said garage & garden room to incorporate habitable space and (d) single-storey extension to the rear of an existing dwelling to form part of the proposed family flat extension along with all associated site development and facilitating works - alterations (granted) include a pitched roof with 6no. rooflights as part of the proposed family flat extension along with all associated site development and facilitating works.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Dublin 14, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25A/0991/WEB

1) Demolition of the existing single storey sunroom and 2no. existing single storey sheds to the rear of the existing dwelling; 2)Part demolition of the existing single storey extension to the side; 3)Part single part two storey extension (including rooflights) to side / rear; 4)Widening of existing vehicular entrance to 3.5m; 5)All associated alterations to the elevations, internal alterations, site, drainage, landscaping and ancillary works.

Start date 18 Jun 2026Start date 18 Jun 2026

Dublin 14, Dublin

DublinDún-Laoghaire Rathdown County CouncilPlanning ref D25B/0408/WEB

The development will consist of: • Demolition of existing chimney to the rear, partial demolition of main roof and walls to side/rear to accommodate new works; • Construction of new single storey extension to side (north east) at ground floor, new first floor extension to the side (south east) including alterations to and extension of existing roofs and construction of 1no. new dormer to the side (north east) of existing roof and new rooflight to front (pitched roof); • Works will also include alterations to existing windows/doors, all associated internal, site, drainage and landscaping works.

Start date 18 Jun 2026Start date 18 Jun 20261 units (phase)

Dublin 5, Dublin

DublinDublin City CouncilPlanning ref WEB2028/24

The widening of the vehicular entrance to 4650mm and revised front garden layout to accommodate off- street parking for 2 cars. The construction of a part 2-storey extension to the rear and side; 55sqm to the ground floor, 33sqm to first floor. A new bedroom window at first floor level to the east- side gable and partial removal of the front porch.

Start date 18 Jun 2026Start date 18 Jun 2026

Dublin 5, Dublin

DublinDublin City CouncilPlanning ref WEB2352/25

The development will consist of: The demolition of the existing rear façade chimney. The construction of a single-storey, flat-roof rear extension with two skylights. The construction of a single-storey, flat-roof porch (4.7m2). Raising the flat roof above the garage (side extension) to allow for insulation. Widening of the vehicular entrance. Minor internal alterations to the existing dwelling.

Start date 18 Jun 2026Start date 18 Jun 2026

Ballncollig, Cork

CorkCork City Council

Single storey modular expansion totaling 695m2 separate to the existing school buildings, but on the same campus.

Start date 17 Jun 2026Start date 17 Jun 2026

Dublin 1, Dublin

DublinDublin City Council

Internal alterations to existing restaurant on ground floor comprising relocation of kitchen facilities to rear & dining to front in conjunction with existing dining area & toilets at basement level and preparation and cold room on first floor of a 4-storey building over basement

Start date 17 Jun 2026Start date 17 Jun 2026

Dublin 14, Dublin

DublinDún-Laoghaire Rathdown County Council

The construction of a two-storey prefabricated extension school facility onto the building of the existing Goatstown Secondary School, Goatstown road, Dublin 14

Start date 17 Jun 2026Start date 17 Jun 2026

Blessington Manor, Kildare

KildareKildare County CouncilPlanning ref 20/989

A) Erect vernacular style part 2 storey and part single storey dwelling with single storey family apartment with garage and assorted outbuildings. B) Install proprietary wastewater treatment system and percolation area. C) Create new entrance off lane. D) Erect 31.5M x 10.0M X 6.0M High agricultural building clad in juniper green box profile sheeting for animal care, machinery and feed store

Start date 17 Jun 2026Start date 17 Jun 20261 units (phase)
How this is counted

Only notices linked to a project are grouped. When one project has several notices this week, it shows the largest number of units stated on any of them, never a sum. Every notice stays in the list with its own start date. Figures cover 15–21 Jun 2026.