Latest planning applications.
680 planning applications were published this week across 26 counties. Together they state 788 units, and 634 link to the council's own file. Each shows the date it was received.
Largest applications this week
By units statedAll applications this week
5 recordsKnockanroe, Ballinamore, Co Leitrim
decommissioning a septic tank and installing a new wastewater treatment system & percolation area, alterations to the site layout plan previously approved under planning reference 21/218, and all ancillary site works.
Corlona, Drumsna, Co Leitrim
1) Demolition of Existing Barn, 2)Construction of Bungalow Dwelling, 3) Effluent Treatment System, 4) Site access & all associated site works
Moneyduff, Dromahair, Co. Leitrim
Renovation and extensions to my house with mechanical waste water treatment system and packaged tertiary treatment system and all associated site development works at Moneyduff, Dromahair, Co. Leitrim.
Dublin Road Townparks, Carrick-on-Shannon, Co. Leitrim
We, Enda and Brenda Stenson, wish to apply for full planning permission for the following works: 1. The annexation of an existing single storey dwelling into 2 no. single storey self contained units. 2. To demolish an existing rear single storey porch and reconstruct the same. 3. Alterations to existing facades to include the replacement of all existing doors and windows and the replacement/repair of existing roof structures. 4. The demolition of 2 no. existing chimneys. 5. The creation of a new independent pedestrian entrance at the South East façade of the existing building. 6. The demolition of an existing shed and garage located to the South of the existing building. 7. The construction of a new vehicular parking area in place of the existing shed and garage, and all ancillary works. The works are located at Dublin Road, Townparks, Carrick-on-Shannon, Co. Leitrim, N41 YX31.
Briscloonagh, Glenfarne, Co.Leitrim
1. Construct a single-storey extension to the side (North West) of the existing dwelling, 2. Construct a domestic shed, together with all ancillary works
How this is counted
The largest applications are ranked by the units each one states; applications that state only a floor area are not ranked with them. An application belongs to the week it was published; the date it was received is shown separately. Figures cover 10–16 Aug 2026.