Refusal decisions · 10–16 Aug 2026
62Refusals
61Substantive reasons
0Verification only
0Document not published
0Portal unavailable
1Manual review
57 of these refusals have page-cited grounds from a checked review. Browse the decision-date inventory.
What this means
Applications were most often refused because the proposal did not fit its site or surroundings, created access or road-safety problems, conflicted with zoning or rural-housing policy, lacked enough technical evidence to demonstrate its impacts were acceptable or harmed the amenity of neighbouring homes.
61 of 62 records carry official reason text
131 published statements, 2.1 per analysed application
32 refused on more than one ground, up to 8
Most common pairs
- 21 Design + Transport/access
- 20 Design + Zoning/policy
- 17 Design + Residential amenity
All ten refusal themes
Applications · statements- 01 Design, scale, character or visual impact 44
- 02 Traffic, access, parking or road safety 25
- 03 Zoning, land use, settlement policy or rural housing need 25
- 04 Missing or insufficient evidence, surveys or technical detail 20
- 05 Residential amenity, privacy, light or noise 20
- 06 Surface-water drainage or flood risk 14
- 07 Unauthorised development, retention or procedural history 14
- 08 Ecology, habitats or Natura impacts 14
- 09 Wastewater, effluent, groundwater or public health 10
- 10 Built heritage or archaeology 6
Refusal decisions · 10–16 Aug 2026
0 of 0 cards shown · 59 case links · 61 linked projects