Liscottle, Swinford, Co. Mayo, Mayo
Mayo County Council · 2560911
What was proposed
The proposed development consists of the installation of a 30-metre-high lattice telecommunications support structure with headframe carrying antennas, dishes, remote radio units (RRUs), associated equipment, together with ground-based equipment cabinets, palisade fencing, cable ladder, GPS, gantry pole, concrete foundations, access gate, and all associated site development works to provide for high-speed wireless data and broadband services.
Refusal reasons
- Having regard to the location of the proposed development which would generate increased traffic from an existing substandard vehicular access onto the N5 National Route, the proposal would be contrary to the Mayo County Development Plan 2022-2028 with specific reference to Policy MTP-23 which states ‘To protect the capacity, efficiency and safety of the national road network in Mayo by complying with the ‘Spatial Planning and National Roads - Guidelines for Planning Authorities’ (2012)’ and Policy MTP-24 which states ‘To avoid the creation of additional direct access points from new development adjoining national roads or the generation of additional traffic from existing direct accesses to national roads to which speed limits greater than 60 km/h apply’. The proposed development is considered to be at variance with national official policy in relation to control of development on/affecting national roads, as outlined in the Department of the Environment, Community and Local Government Spatial Planning and National Roads Guidelines for Planning Authorities (2012). Accordingly, to grant the proposed development would be at variance with national policy in relation to development involving access to national roads would endanger public safety by reason of traffic hazard and obstruction of road users, would have a detrimental impact on Planning and Development Section Áras and Chontae, Castlebar, Co. Mayo www.mayo.ie | 0949064000 the capacity, safety or operational efficiency of the national road network in the vicinity of the site, and therefore, would be contrary to the proper planning and sustainable development of the area.
- The proposed development would endanger public safety by reason of traffic hazard or obstruction of road users or otherwise as the application fails to address the normal sighting and design considerations in relation to road safety at the access/egress point, in accordance with the requirements of the Mayo County Development Plan 2022-2028.
- The nature of the proposed development and resulting operations, would give rise to certain traffic hazards, with associated requirement for ongoing and stringent control measures to be maintained, would cause undue risk to road safety, would endanger public safety by reason of traffic hazard, and would therefore be contrary to the proper planning and development of the area. END OF SCHEDLE.
Official decision evidence